CIC Decision on DRDO Corruption & Nepotism – 3

CENTRAL INFORMATION COMMISSION
Room No. 308, B-Wing, August Kranti Bhawan, Bhikaji Cama Place, New Delhi-110066

File No.CIC/LS/A/2012/001219

Appellant Shri Rajiv Chauhan
Public Authority DRDO
Date of hearing 09.08.2012
Date of decision 09.08.2012

Facts :-
1. Heard today dated 09.08.2012. Appellant present. DRDO is represented by Shri
Deepak Mishra, Scientist ‘E’

2. The appellant had filed an RTI application dated 29.10.2011 seeking information
about the purchase of certain books and other materials by the Defence Institute of Armament Technology, Pune. This information was denied to him on the ground that DRDO is an exempted organisation. During the hearing, the appellant submits that he will be satisfied if he is given inspection of the file/files relating to the order placed by Dr. A.K. Tyagi, the then Library Incharge, DIAT, Pune, for online subscription of ‘Nature Magzine’ against payment of about Rs. 25 lacs

3. The appellant also produces a copy of the letter dated 14.3.2011 of Dr. S.S.Sirurmath, University Librarian, in which he had informed the appellant that copy of order and terms and conditions of Nature Magazine(on line) were not available. He expresses surprise at this response in as much as an order of Rs. 25 lacs could not have been placed without due processing in the file.

4. In the facts and circumstances of the case, it is hereby ordered that CPIO may give inspection of all records relating to the online subscription to the appellant or his representative in 05 weeks time.

Sd/-
( M.L. Sharma )
Information Commissioner

Authenticated true copy. Additional copies of orders shall be supplied against
application and payment of the charges, prescribed under the Act, to the CPIO of this
Commission.

( K.L. Das )
Deputy Registrar

Address of parties :-
1. The Scientist ‘F’ & CPIO, DRDO, RTI Cell,
314-A, B-Block, DRDO Bhawan,
New Delhi-110105.

2. Shri Rajiv Chauhan,
1053/3, Shastri Nagar,
Meerut-250005.

The Right to Information Act, 2005

Appeal before the Central Information Commission;

Appeal No. ———————– Dated ————————
As I am aggrieved by decision of Central Public Information Officer and First Appellate

Authority, I hereby file this appeal for your kind decision.

1. Details of appellant:

1.1 Full Name: – RAJIV CHAUHAN

1.2. Full Address: R/O-1053/3, SHASTRI NAGAR, MEERUT (U.P)-250005

1.3 Phone/Cell No.: 09412628314 ; 09258045938 ; 0121-4009512;

4 Email ID: rajivchauhan89@yahoo.co.in

2. Details of Central Public Information Officer (CPIO):

2.1 Name/Designation: Dr.A.K.TYAGI ; SCIENTIST “F’ , CPIO, DRDO HQ;

2.2 Full Address: 314-A, “B’ BLOCK, DRDO BHAWAN, NEW DELHI-110105

2.3 Name of Public Authority: DRDO, MINISTRY OF DEFENCE.

IMPORTANT NOTE :-

The RTI information is related with the corruption of the CPIO of RTI Dr.A.K.TYAGI during the office-in charge ,information centre/ library & finance officer of DIAT (Defense institute of Advanced technology). So that the decision on my RTI decision given by- Deepak Mishra , Addl.Director, RTI Cell, DRDO BHAWAN , NEW DELHI-110105

3. Details of First Appellate Authority [FAA]:

3.1 Name/Designation of the FAA: Dr. ARUN KUMAR

3.2 Full Address of FAA: OS & DIRECTOR; DIRECTORATE OF PERSONNEL;

ROOM NO- 217, DRDO BHAWAN, NEW DELHI-110105

4. Dates of RTI application/first appeal:

4.1 To CPIO — 29 OCT 2011

4.2 To FAA: — 02 DEC 2011

5. Particulars of Decisions:

5.1 Reference No & Date of CPIO Decision:-

22nd NOV2011; RTI/01/2091/P/2011/0283; CPIO.DRDO HQ; NEW DELHI

5.2 Reference No & Date of FAA’s Decision:-

10 JAN 2012; RTI/02/2091/F/2011/114; Dr.Arun Kumar,OS & DOP , FAA,DRDO HQ

6. Dates of receipt of replies by appellant from:-

6.1 CPIO— 28 NOV2011

6.2 FAA: — 17 JAN 2012

7. Details of information sought:-

Kindly inform to you that Dr.A.K.Tyagi worked in DIAT (Defense Institute of Advanced Technology) as OI(office in charge),IC&L(Information centre & library) and Finance officer during his posting. Presently the CPIO at DRDO HQ, New Delhi. He has violated all procurement norms laid by DRDO authority vide there revised edition 1999,DRDO manual of Procedure for management of library & Technical Information Centers.-DRDO HQ, Ministry of Defense .Page no-25 para 4.2.3 no 4 terms for procurement of books; page no-33 para 4.3.4 terms for procurement of periodical publication. Above procedure were violated by Dr A.K Tyagi in his all procurements and misappropriate the government funds and misinterpreted the government rules for minting money for himself .The book purchase in DRDO the approval of library committee is obtain which selects the useful book/journals and then the normal purchasing procedure is followed the quotations are called and the lowest bidder gets the order. There are few publisher are whose books/journals have standard price and when order is placed it goes directly to publisher.
In Dr A K Tyagi cases most of orders were placed to local vendors in single tender basis. When the purchases of books by violating the all the rules Dr A K Tyagi surpassed the all the records and the budget limit was crossed five times( 30 Laks to 1.5 Corers). This action was noticed by all the DIAT officials and an inquiry committee was framed. The committee constituted by then Vice Chancellor a senior officer as chairman and two officer as board member,. When the committee starts the investigation most of the documents were denied by Dr A K Tyagi, somehow, the inquiry committee submitted its report. The amount of corruption was good enough to punish the official but as usual God father culture prevailing in DRDO helped him and gave him safe passage by transferring to DRDO Hqrs.
He purchased Nature journal, nature publishing group, 4 Crinan Street, London, United Kingdom via local vendor for Rs 25 Lakhs

Facts : Till date nobody from DIAT has seen the Nature Journal

This journal was not useful for DIAT as the same deals with life sciences and DIAT area is ARMAMENT ENGINEERING, APPLIED MATHEMATICS, METALLURGY, COMPUTER ENGINEERING, APPLIED PHYSICS, AEROSPACE ENGINEERING, MECHANICAL ENGINEERING, EXPLOSIVES & APPLIED CHEMISTRY, ELECTRONICS
The chairman for the Nature Journal procurement was Vigilance Officer of DIAT who approved this procurement from local vendor.

In other cases the books/journals orders were recommended in dollars but Dr.A K Tyagi made payment in Pounds/Euro for the same procurement and bill was raised by with the help local vendors. Example – if book cost was approved by library committee in $ 360 but when the payment was done that is 360 Pounds

The finding of inquiry committee of DIAT (Board of Three Senior Officers)
1. Observations – To understand the existing procedure for procurement of Books by Library, it was necessary to go through basis of existing procedure, record and files to related to procurement. In absence of OI/C,IC&L very limited records made available by Library and after arrival of OI/C,IC&L access to information and records was totally denied to the Board of Officers.
2. Existing Procedure and Anomalies- the following is observed by Board of Officers.
i) OI/C,IC&L places demand directly to vendors after approval by Library Committee. There is no procedure of quotation/negotiation followed. it is noted that as per terms and conditions no discounts have been asked.
ii) Order has been placed on single tender basis
iii) During limited observations it was seen that Books were accepted at higher prices than the order/approval price by the purchase committee.
iv) No proof of price is being put up to the purchase Committee for approval.
v) Firm Orders are being placed by OI/C,IC&L without bidding/negotiation
vi) Vendors to whom orders are being placed are not registered. As per purchase procedure orders of only up to Rs 5000/- can be placed to unregistered vendors. This rule is not followed.
vii) In our limited inquiry, we observed that large numbers of books were
accepted at much higher price. We site few example-
a) Book ordered for Rs 6029.07 was procured for price Rs 81,936.00
b) Book ordered for Rs 13,156.00 was procured for price Rs 27,362.68
c) Book ordered for Rs 40,000.00 was procured for price Rs 3,60,00.00
d) Book ordered for Rs 3,292.24 was procured for price Rs 5,233.09
viii) We did not find any justification in orders or Terms & Conditions to accept such high billing prices for payment to venors.
ix) OI/C,IC&L did not conduct independent investigation regarding over valued books supplied by the vendors for their correct price.
x) We found such number of cases where over payment was cleaned by OI/C, IC&L and Finance Officer without amendment or without bringing to notice of approving authority or VC
xi) We did not find any power vested to OI/C,IC&L, Finance Officer to clear the over payment cases.
xii) Before payment to vendors, pre-auditing is mandatory (as per purchase procedure) No such pre auditing mechanism is found resulting in escaping the over payment cases from scrutiny and corrective action. We did not find any document or authority to exempt from pre –auditing.
xiii) Functioning of Library in case Library procurement was found devoid of adequate check and balance and control mechanism. We can conclude that OI/C,IC&L and Finance Officer flouted the principle of FR-21

This is a case of the corruption so that the main object to take this information is to provide as an evidence before high power investigating officer / commission / higher courts in the interest of law and justice .

I want the following information’s as under-
S.No INFORMATION SOUGHT REPLY
1. Is it true that Dr. A.K.Tyagi worked in DIAT (Defense Institute of Advanced Technology) as OI(office in charge),IC&L(Information centre & library) and Finance officer during his posting. Presently the CPIO at DRDO HQ, New Delhi ?
Yes/No
2. Dr A K Tyagi OI/C,IC&L places demand directly to vendors after approval by Library Committee. There is no procedure of quotation / negotiation followed ? Yes/No
3. Dr A K Tyagi OI/C,IC&L has been placed orders on single tender basis? Yes/No
4. Vendors to whom orders are being placed are not
registered?
Yes/ No
5. Book cost was approved by library committee in US dollor 360 but when the payment was done that is 360 Pounds ?
Yes/No
6. Order copy and term, conditions for the nature Magazine is not available. So the order place by Dr. A.K.Tyagi for Nature Magazine verbally or in written? Pl. provide suitable reply with authentic documents.

I state that the information sought does not fall within the restriction in section 8 & 9 of the Act and to the best of my knowledge it pertains in the DRDO office contained & record. Above required information is directly related to corruption and not come under scheduled –II. I request to you please provide me the information by the speed post.

8. Brief facts of the case:-
I submitted my RTI application before the CPIO, DRDO, New Delhi on dt.29-10-2011. Cause for put up this application was the allegation of the corruption / misuse of the office by Dr.A.K.Tyagi . He violated all procurement norms laid by DRDO authority vide there revised edition 1999,DRDO manual of Procedure for management of library & Technical Information Centers.-DRDO HQ, Ministry of Defense .Page no-25 para 4.2.3 no 4 terms for procurement of books; page no-33 para 4.3.4 terms for procurement of periodical publication. Above procedure were violated by Dr A.K Tyagi in his all procurements and misappropriate the government funds and misinterpreted the government rules for minting money for himself .The book purchase in DRDO the approval of library committee is obtain which selects the useful book/journals and then the normal purchasing procedure is followed the quotations are called and the lowest bidder gets the order. There are few publisher are whose books/journals have standard price and when order is placed it goes directly to publisher. In Dr A K Tyagi cases most of orders were placed to local vendors in single tender basis. When the purchases of books by violating the all the rules Dr A K Tyagi surpassed the all the records and the budget limit was crossed five times( 30 Laks to 1.5 Corers). This action was noticed by all the DIAT officials and an inquiry committee was framed. The committee constituted by then Vice Chancellor a senior officer as chairman and two officer as board member,. When the committee starts the investigation most of the documents were denied by Dr A K Tyagi, somehow, the inquiry committee submitted its report. The amount of corruption was good enough to punish the official but as usual God father culture prevailing in DRDO helped him and gave him safe passage by transferring to DRDO Hqrs. He purchased Nature journal, nature publishing group, 4 Crinan Street, London, United Kingdom via local vendor for Rs 25 Lakhs
CPIO reply is not satisfactory and not as per the law because the RTI is related with the allegation of the corruption and not exempted under section 24(1) of the RTI Act-2005.
In Supreme Court civil Appeal no – 6454 clearly mentioned that- “37. The right to information is a cherished right. Information and right to information are intended to be formidable tools in the hands of responsible citizens to fight corruption and to bring in transparency and accountability.
The provisions of RTI Act should be enforced strictly and all efforts should be made to bring to light the necessary information under clause (b) of section 4(1) of the Act which relates to securing transparency and accountability in the working of public authorities and in discouraging corruption.”

I was not satisfied with the reply of CPIO,DRDO HQ, New Delhi, after that I submitted an appeal before FAA to take the information but the FAA of DRDO dismissed the appeal and failed to provide the information with the ref. of second schedule of the RTI Act & section 24(1) of the RTI Act-2005.

9. Reasons/grounds for this appeal:-

1- That the RTI application is related with the public information because the tenders generally published in news paper / internet for the purchasing of the books as per the DRDO manual of Procedure for management of library & Technical Information Centers.-DRDO HQ, Ministry of Defense .Page no-25 para 4.2.3 no 4 terms for procurement of books; page no-33 para 4.3.4 terms for procurement of periodical publication.

2- That this information is directly related with the corruption and misuse of the office and not come under section 24(1) of the RTI Act because the books/journals orders were recommended in dollars but Dr.A K Tyagi made payment in Pounds/Euro for the same procurement and bill was raised by with the help local vendors. Example – if book cost was approved by library committee in $ 360but when the payment was done that is 360 Pounds
3- In Dr A K Tyagi cases most of orders were placed to local vendors in single tender basis. When the purchases of books by violating the all the rules Dr A K Tyagi surpassed the all the records and the budget limit was crossed five times( 30 Laks to 1.5 Corers). This action was noticed by all the DIAT officials and an inquiry committee was framed. The committee constituted by then Vice Chancellor a senior officer as chairman and two officer as board member,. When the committee starts the investigation most of the documents were denied by Dr A K Tyagi, somehow, the inquiry committee submitted its report. The amount of corruption was good enough to punish the official but as usual God father culture prevailing in DRDO helped him and gave him safe passage by transferring to DRDO Hqrs.
4- That the main object to take this information is to provide as an evidence before High Power Investigating Officer/ Commissions / High Courts in the interest of law and justice.

10. Any other information in support of appeal:-
1- This RTI information is required to proof a corruption during the purchasing of the books / periodical publication.
2- Dr.A.K.Tyagi violated all procurement norms laid by DRDO authority vide there revised edition 1999,DRDO manual of Procedure for management of library & Technical Information Centers.-DRDO HQ, Ministry of Defense .Page no-25 para 4.2.3 no 4 terms for procurement of books; page no-33 para 4.3.4 terms for procurement of periodical publication. Above procedure were violated by Dr A.K Tyagi in his all procurements and misappropriate the government funds and misinterpreted the government rules for minting money for himself.
3- That this action was noticed by all the DIAT officials and an inquiry committee was framed. This committee was put up an adverse report to the authorities.
11. Prayer/relief sought for:-
I request your honor to pass an order to concern authority to provide the following information’s as under-
S.No INFORMATION SOUGHT REPLY
1. Is it true that Dr. A.K.Tyagi worked in DIAT (Defense Institute of Advanced Technology) as OI(office in charge),IC&L(Information centre & library) and Finance officer during his posting. Presently the CPIO at DRDO HQ, New Delhi ?
Yes/No
2. Dr A K Tyagi OI/C,IC&L places demand directly to vendors after approval by Library Committee. There is no procedure of quotation / negotiation followed ? Yes/No
3. Dr A K Tyagi OI/C,IC&L has been placed orders on single tender basis? Yes/No
4. Vendors to whom orders are being placed are not
registered?
Yes/ No
5. Book cost was approved by library committee in US dollor 360 but when the payment was done that is 360 Pounds ?
Yes/No
6. Order copy and term, conditions for the nature Magazine is not available. So the order place by Dr. A.K.Tyagi for Nature Magazine verbally or in written? Pl. provide suitable reply with authentic documents.

I state that the information sought does not fall within the restriction in section 8 & 9 of the Act and to the best of my knowledge it pertains in the DRDO office contained & record. Above required information is directly related to corruption and not come under scheduled –II. I request your honor to pass an order to concern authority to provide the information’s by the speed post.
(2)- I request your honor to pass an order in favor of the applicant as deemed fit as an any relief .

Personal Presence at hearing:- — YES
Declaration:-

I hereby state that the information and particulars given above are true to the best of my knowledge and belief. I also declare that this matter is not previously filed with this commission nor is pending with any Court or tribunal or authority.
Place: MEERUT

Date: —————-
Signature of appellant

 

 

CIC Decision on DRDO Corruption & Nepotism – 1

CENTRAL INFORMATION COMMISSION
Room No. 308, B-Wing, August Kranti Bhawan, Bhikaji Cama Place, New Delhi-110066


File No.CIC/LS/A/2012/001207
Appellant Shri Rajiv Chauhan
Public Authority DRDO
Date of hearing 09.08.2012
Date of decision 09.08.2012

Facts :-
1. Heard today dated 09.08.2012. Appellant present. DRDO is represented by Shri
Deepak Mishra, Scientist ‘E’.

2. It is noticed that in the RTI application dated nil, the appellant had sought information on 05 paras about the appointment of Ms. Swati Srivastava. The CPIO had refused todisclose any information vide letter dated 2.11.2011 on the ground that the DRDO is an exempted organisation.

3. During the hearing, the appellant submits that the DRDO had advertised posts of Scientists ‘B’ in 2004 for which qualification was M.Sc. Bio Technology. Ms. Srivastava was M.Sc. in Environmental Biology. Thus, she was not qualified for the job. Yet due to the influence of his father Dr. Arun Kumar, who was then Deputy Director in DRDO, she was fraudulently selected as Scientist ‘B’
4. Shri Mishra submits that there is no one single file relating to this selection. In fact, there were about ten thousand candidates and to cull out Ms. Swati Srivastava’s record would be a herculean task. Further, the record is ten year old.

5. No doubt, DRDO is an exempted organisation, yet in my opinion, there is no harm if the appellant or his representative is given inspection of the entire records relating to the selection of Ms. Swati Srivastava as Scientist ‘B’. As regards the difficulty expressed by Shri Mishra in tracing out the relevant record, I appreciate the same and yet I expect him to cull out the record for appellant’s inspection.

6. This order may be complied with in 05 weeks time.

Sd/-
( M.L. Sharma )
Information Commissioner

Authenticated true copy. Additional copies of orders shall be supplied against application and payment of the charges, prescribed under the Act, to the CPIO of this
Commission.

( K.L. Das )
Deputy Registrar

Address of parties :-

1. The Scientist ‘F’ & CPIO, DRDO, RTI Cell,
314-A, B-Block, DRDO Bhawan,
New Delhi-110105.

2. Shri Rajiv Chauhan,
1053/3, Shastri Nagar,
Meerut-250005.

The Right to Information Act, 2005

Appeal before the Central Information Commission;

Appeal No. ———————– Dated ————————
As I am aggrieved by decision of Central Public Information Officer and First Appellate

Authority, I hereby file this appeal for your kind decision.

1. Details of appellant:

1.1 Full Name: – RAJIV CHAUHAN

1.2. Full Address: R/O-1053/3, SHASTRI NAGAR, MEERUT (U.P)-250005

1.3 Phone/Cell No.: 09412628314 ; 09258045938 ; 0121-4009512;

4 Email ID: rajivchauhan89@yahoo.co.in

2. Details of Central Public Information Officer (CPIO):

2.1 Name/Designation: Dr.A.K.TYAGI ; SCIENTIST “F’ , CPIO, DRDO HQ;

2.2 Full Address: 314-A, “B’ BLOCK, DRDO BHAWAN, NEW DELHI-110105

2.3 Name of Public Authority: DRDO, MINISTRY OF DEFENCE.

3. Details of First Appellate Authority [FAA]:

3.1 Name/Designation of the FAA: Dr. ARUN KUMAR

3.2 Full Address of FAA: OS & DIRECTOR; DIRECTORATE OF PERSONNEL;

ROOM NO- 217, DRDO BHAWAN, NEW DELHI-110105

IMPORTANT NOTE :-

The RTI information is related with the corruption of the First Appellate Authority of RTI Dr. Arun Kumar & her daughter during the selection as a scientist “B’, so that the decision on my RTI first appeal decision given by-

Dr. S. SUNDARESH, CC R&D(ACE), SI&DS; TRANSPARENCY OFFICER, DRDO,

DRDO BHAWAN , NEW DELHI-110105

4. Dates of RTI application/first appeal:

4.1 To CPIO — 03 OCT 2011

4.2 To FAA: — 02 DEC 2011

5. Particulars of Decisions:

5.1 Reference No & Date of CPIO Decision:-

02 NOV2011; RTI/01/2091/P/2011/0250; CPIO.DRDO HQ; NEW DELHI

5.2 Reference No & Date of FAA’s Decision:-

11 JAN 2012; RTI/02/2091/F/2011/113; CC R& D (ACE), SI&DS;
TRANSPARENCY OFFICER;DRDO HQ; NEW DELHI

6. Dates of receipt of replies by appellant from:-

6.1 CPIO— 07 NOV2011

6.2 FAA: — 17 JAN 2012

7. Details of information sought:-

Kindly inform to you that Ms. Swati Srivastava,D/o Dr. Arun Kumar,Director DRDO Bhawan,Rajajimarg,New Delhi was selected Scientist”B’ through RAC(Recruitment and
assessment centre of DRDO) Adv.no, item no34 without having the required qualification for the post as published in the advertisement. The required qualification for the post was M.Sc- Biotechnology, where as the qualification of Swati Srivastava is M.Sc in Environmental Biology. Her father Dr. Arun Kumar ,was the Addl.Director of the DRDO at that time. One RAC interview board external member of Ms. Swati Srivastava was her teacher. However Ms. Swati Srivastava was not completing the minimum eligibility qualification as published, then also she was selected with the criminal conspiracy of her father with board members of the RAC. Ms. Swati Srivastava, Dr. Arun Kumar and RAC board Chairman and Members did dishonesty and cheated all the participants who applied for the post and forged the official documents to select as a Scientist “B” to Ms. Swati Srivastava.

In the Director, DRDO fax message 03/8/2004 for RAC Adv.No.66,item.34, eligibility subject showing Biotechnology. RAC,DRDO document of assessment sheet dt. 26/9/2004 for adv.66 subject of Ms. Swati Srivastava forgely filled in Biotechnology list.
However , as per the DRDO letter RTI/01/2091/p/2011-12/005 dt. 6/4/11, Ms.Swati Srivastava subject is environment biology. Therfore Ms. Swati Srivastava without fulfill the eligibility qualification got the scientist “B” post in DRDO on forged documents of the RAC. (Recruitment and assessment centre of DRDO)

Secondly, In the seniority list for promotion of scientist “C” as published on july 2010 page no.45 of DRDO official document again dishonestly changed Ms. Swati Srivastava qualification belive to be a forged M.Sc-Biotechnology instead of M.Sc in Environmental Biology. I hereby enclosed all related documents for your consideration and action.
I want the following information’s as under-
S.No INFORMATION SOUGHT REPLY

1. Is Ms.Swati Srivastava, Scientist “B”,DIPAS the daughter of Director DRDO, Mr.Arun Kumar ?  Yes/No

2. What was the eligibility subject of RAC Adv. No.66, item 34 ? Biotechnology/ Environmental Biology –  Yes/No

3. What was the subject qualification of Ms. Swati Srivastava in her M.Sc ? Biotechnology/Environmental Biology – Yes/No

4. Did RAC – DRDO,ADV.NO-66 Assessment sheet mentioned Biotechnology subject with the name of Ms.Swati Srivastava ?  –Yes/ No
5. Did promotion list of the DRDO mentioned Biotechnology subject with the name of Ms. Swati Srivastava ?  – Yes/No

I state that the information sought does not fall within the restriction in section 8 & 9 of the Act and to the best of my knowledge it pertains in the DRDO office contained & record. Above required information is directly related to corruption and not come under scheduled –II. I request to you please provide me the information by the speed post.

8. Brief facts of the case:-
I submitted my RTI application before the CPIO, DRDO, New Delhi on dt.03-10-2011. Cause for put up this application was the allegation of the corruption / misuse of the office during the selection of the scientist. CPIO reply is not satisfactory and not as per the law because the RTI is related with the allegation of the corruption and not exempted under section 24(1) of the RTI Act-2005.
In his reply CPIO mislead to me with the reference of Supreme Court civil Appeal no – 6454. However in this Supreme Court civil Appeal no – 6454,clearly mentioned that- “37. The right to information is a cherished right. Information and right to information are intended to be formidable tools in the hands of responsible citizens to fight corruption and to bring in transparency and accountability.
The provisions of RTI Act should be enforced strictly and all efforts should be made to bring to light the necessary information under clause (b) of section 4(1) of the Act which relates to securing transparency and accountability in the working of public authorities and in discouraging corruption.”

I was not satisfied with the reply of CPIO,DRDO HQ, New Delhi, after that I submitted an appeal before FAA to take the information but the FAA / Transparency officer of DRDO dismissed the appeal and failed to provide the information with the ref. of second schedule of the RTI Act & section 24(1) of the RTI Act-2005.

9. Reasons/grounds for this appeal:-
1- That the RTI application is related with the public information because 63 participant were applied for the above mentioned scientist post after the publication of the advertisement in employment news paper .

Encl- (a)- List of the 63 participant applied for the post.
(b)-Employment advertisement no-66; dt-2/4/2004

2- That this information is directly related with the corruption and misuse of the office and not come under section 24(1) of the RTI Act because the required qualification for the post was M.Sc- Biotechnology, where as the qualification of Swati Srivastava is M.Sc in Environmental Biology. Her father Dr. Arun Kumar ,was the Addl.Director of the DRDO at that time. One RAC interview board external member of Ms. Swati Srivastava was her teacher. However Ms. Swati Srivastava was not completing the minimum eligibility qualification as published, then also she was selected with the criminal conspiracy of her father with board members of the RAC. Ms. Swati Srivastava, Dr. Arun Kumar and RAC board Chairman and Members did dishonesty and cheated all the participants who applied for the post and forged the official documents to select as a Scientist “B” to Ms. Swati Srivastava.

3- That the main object to take this information is to provide as an evidence before High Power Investigating Officer/ Commissions / High Courts in the interest of law and justice.

10. Any other information in support of appeal:-
This RTI information is required to proof a corruption during the selection. Secondly, In a RTI reply of the CPIO, DRDO HQ vide his letter no rti/01/2091/p/2011-12/005 dt 6/4/11 Ms Swati subject is environment biology however as per the seniority list for promotion as published on july 2010 page no.45 of DRDO official document Ms. Swati subject is M.Sc- Biotechnology.

Encl- (a)- RTI reply vide letter no-o rti/01/2091/p/2011-12/005 dt 6/4/11 Ms Swati subject is environment biology.
(2)- seniority list for promotion as published on july 2010 page no.45 of DRDO official document Ms. Swati subject is M.Sc- Biotechnology.

11. Prayer/relief sought for:-
I request your honor to pass an order to concern authority to provide the following information’s as under-

S.No INFORMATION SOUGHT REPLY
1. Is Ms.Swati Srivastava, Scientist “B”,DIPAS the daughter of Director DRDO, Mr.Arun Kumar ?
Yes/No
2. What was the eligibility subject of RAC Adv. No.66, item 34 ? Biotechnology/
Environmental Biology
3. What was the subject qualification of Ms. Swati Srivastava in her M.Sc ? Biotechnology/
Environmental Biology
4. Did RAC – DRDO,ADV.NO-66 Assessment sheet mentioned Biotechnology subject with the name of Ms.Swati Srivastava ?
Yes/ No
5. Did promotion list of the DRDO mentioned Biotechnology subject with the name of Ms. Swati Srivastava ?
Yes/No

I state that the information sought does not fall within the restriction in section 8 & 9 of the Act and to the best of my knowledge it pertains in the DRDO office contained & record. Above required information is directly related to corruption and not come under scheduled –II. I request your honor to pass an order to concern authority to provide the information’s by the speed post.
(2)- I request your honor to pass an order in favor of the applicant as deemed fit as an any relief .

Personal Presence at hearing:- — YES

Declaration:-

I hereby state that the information and particulars given above are true to the best of my knowledge and belief. I also declare that this matter is not previously filed with this commission nor is pending with any Court or tribunal or authority.
Place: MEERUT

Date: —————-
Signature of appellant

DRDO to take action against terror suspect researcher

Deccan Herald

New Delhi, Aug 31, 2012, (IANS) :

Taken by surprise over the arrest of one of its researchers in Karnataka for links with Pakistan-based terror outfits, India’s defence research agency Friday announced that it was initiating disciplinary action against him under government rules.

Defence Research and Development Organisation (DRDO) spokesperson Ravi Gupta said the youth, identified as Aijaz Ahmed Mirza, was only a junior researcher, which is a temporary position.

Mirza was not an employee, Gupta clarified.

“This has reference to reports in certain sections of media reporting the arrest of Aijaz Ahmed Mirza. In this regard, it is intimated that Mirza had been placed as Junior Research Fellow (JRF) for the past few months, at the Centre for Air Borne Systems (CABS), a DRDO laboratory,” he said.

Gupta also said that verification of Mirza’s antecedents as well as police verification was conducted in the process of his placement in the temporary position.

“He was not involved in any sensitive work and as such no sensitive/classified information has been compromised. Disciplinary action as per government of India rules is being taken,” he added.

Under the research fellowship scheme, DRDO offers opportunities to young scientists and engineers to work in its labs in the areas of basic research relevant to the laboratory.

Defence ministry report slams DRDO chief

Defence ministry report slams DRDO chief

14 Aug 2012Hindustan Times (Bhopal)

NEW DELHI: Defence Research and Development Organisation chief VK Saraswat sanctioned R2.8 crore to a mathematical society headed by him, an audit report has revealed. The report prepared by the defence ministry’s finance wing has also dealt with issues of transparency and shortcomings in projects developed by the organisation.

Defence ministry audit questions DRDO functioning

New Delhi: An internal audit report ordered by the defence ministry raised questions over the functioning of the DRDO and the grant of Rs 2.8 crore by its chief VK Saraswat to a society under him.

The report prepared by the finance wing of the defence ministry raised several issues in its review and the transparency of the research agency with a budget of over Rs 5,000 crore, defence sources said in New Delhi.

The report has questioned the grant of Rs 2.8 crore by Saraswat to a mathematical society.

The report has also pointed out that to avoid seeking approvals from the competent financial authorities, the DRDO was splitting the sanctions for its projects, they said.

It has also cited shortcomings in the products developed by the DRDO such as the Arjun tank, which has been found to be overweight by the Army for operations in certain areas along the border.

However, the DRDO said the issues raised in the report “are essentially in the nature of preliminary observations” and it was “vitiated by a faulty audit process”.

“Such preliminary observations are required to be formally issued and replies to the same should be sought prior to compilation of any report. Only if the replies are not satisfactory is the next step of making a preliminary report taken.

“In the extant case, the laid down procedure was not followed and to that extent, the process of audit stands vitiated. Thus, even before seeking replies of DRDO, presumption and baseless conclusions appear to have been arrived at,” DRDO spokesperson Ravi Gupta said.

PTI

DRDO ‘develops’ blatant financial irregularities

Published: Friday, Aug 17, 2012, 9:00 IST

By Pradip R Sagar | Place: New Delhi | Agency: DNA

The ministry of defence’s special audit has found blatant irregularities in the Defence Research Development Organisation’s handling of finances.

The special audit report, accessed by the DNA, reveals that financial sanctions are being split so that they do not require approval of higher authorities.

The audit carried out by Comptroller General of Defence Audit on the direction of defence minister AK Antony has found that key projects costing over Rs300 crore were tweaked by the DRDO to get them sanctioned without approaching the concerned financial authorities.

“DRDO authorities have sometimes used delegated powers to sanction supposedly new projects to complete the work taken up under ongoing projects, instead of going to the concerned financial authority for revision of cost of the old projects,” the audit report claims.

For instance, programme for development of main battle tank Arjun was sanctioned at Rs69.99 crore in November 2010. But the DRDO authorities changed the entire programme and split it into smaller sub-heads and several procurements were sanctioned under ‘build-up’ so that higher authorities within the system could be avoided. This shows that a coordinated attempt to avoid going to higher financial authorities, which is contrary to financial regulations,” the auditors observed.

Similarly, despite having a comprehensive five-year programme sanctioned for human performance enhancement in May 2009 at a cost of Rs34.56 crore, the director of Defence Institute of Physiology & Allied Sciences (DIPAS-DRDO), has managed to get approval for additional projects over the already sanctioned project. Such practice defeats the very purpose of making projects/programmes,” the report added.

Another project called ‘Product support and product improvement of NAG weapon system’ was sanctioned at a cost of Rs28.35 crore by VK Saraswat, director general of DRDO, despite the fact that the Cabinet Committee on Security approved similar programme was still in the pipeline.

Audit report also pointed out an unjustified cost reduction by DG, DRDO for a project for design and development of electro-optical sensors for air-borne platforms (UAV and Aerostat) at a cost of Rs49.82 crore.

“Director General, DRDO has reduced the cost from Rs70 crore as proposed to Rs49.82 crore so as to bring it just under Rs50 crore, which is his sanctioning power,” the special audit report claims.

Under scrutiny of accounts, the audit also found anomalies in facility for elctro-optical system testing (FACET). “FACET was sanctioned at a cost of Rs35 crore by DG, DRDO to create a facility, which is essentially required to meet the objectives of an already sanctioned project,” the report added.

The audit report also observed several split sanctions were issued for renovation of DRDO Bhawan in New Delhi while an unauthorised sanction of Rs49.15 crore to develop vehicle testing facility in Pune from public accounts mainly for civilian use was granted by the DRDO authorities

DRDO have no reply – taken shelter from RTI section 24(1) for unaccountability & delay during Kargil war – More Casualities of Indian Army.

From-                                                                                              Dated : 24-06-12

Rajiv Chauhan;                                                                                                                                                1053/3,Shastri nagar,Meerut(U.P)                                                                          09412628314;09258045938;

To,                                                                                                                                                                              Hon’ble Defence Minister;                                                                                                                           Govt.of India,  New Delhi,

Sub:– DRDO have no reply – taken shelter from RTI section 24(1) for unaccountability &    delay during Kargil war – More Casualities of Indian Army.

Respected Sir,

Former Army Chief V.P.Malik, who led the army during the 1999 Kargil war, has said casualties in the conflict could have been reduced had the DRDO “not come in the way” of acquiring weapon – locating radars. ‘We had one or two incidents particularly on the weapon locating radar. If the DRDO had not come in the way we would have got them before the Kargil war and that would have definitely reduced our casualties’.

My RTI related to know the DRDO scientist / officer accountable and responsible for the delay which caused more casualties of the Indian Army as per the army chief Malik.. But DRDO have no reply – taken shelter from RTI section 24(1) for unaccountability?

I request you to take necessary action against the accountable officer in DRDO responsible for more casualties of Indian Army.

With high regards,

Your,  Sincerely.

(Rajiv Chauhan)

COPY TO THE : 

 1- Hon’ble President of India for kind consideration and necessary action.

2- Hon’ble Prime minister of India for kind consideration and necessary action.

Rajiv Chauhan

FOR DETAIL PL. SEE ENCLOSERS

Kargil RTI

 

 

India flexes some firepower as DRDO rolls out Missile Defence System for Mumbai, Delhi

PTI New Delhi, June 24, 2012 | India Today / India / Story

Delhi and Mumbai, the two most vital metros of India, have been chosen for DRDO’s Ballistic Missile Defence system that can be put in place at short notice.
The detailed proposal is being prepared for final clearance from the Cabinet Committee on Security (CCS).

The detailed proposal is being prepared for final clearance from the Cabinet Committee on Security

The strategic planning has already begun to install the BMD system in the two cities and the final proposal will be put before the government after detailed analysis of the entire project, sources told PTI in New Delhi.
The sites for installing radars to track enemy missiles and storing counter-attack projectiles will be determined during the planning stage, they said, adding that these locations must have adequate stealth features and protection against enemy sabotage.
To ensure maximum protection against air-borne threats, DRDO will put a mix of counter-attack missiles which will be able to shoot down enemy missiles both within the earth’s atmosphere (endo-atmospheric) and outside it (exo-atmospheric).
The BMD system will require minimum human intervention due to the complete automation of tracking devices and counter-measures. Human intervention will be required only to abort the mission, the sources said.
After successful implementation in Delhi and Mumbai, the system will be used to cover other major cities in the country, they added.
The shield, developed by Defence Research and Development Organisation, has undergone a series of successful tests. It can destroy an incoming ballistic missile within 2,000 km.

DRDO have no reply – taken shelter from RTI section 24(1) in corruption related cases ?

From-                                                                                           Dated : 20-06-12

Rajiv Chauhan;                                                                                                                   1053/3,Shastri nagar,Meerut(U.P)                                                                 09412628314;09258045938;

 

To,                                                                                                                             Hon’ble Defense Minister;                                                                                    Govt.of India,  New Delhi,

Sub:– DRDO have no reply – taken shelter from RTI section 24(1) in              corruption related cases ?

Respected Sir,

Major irregularities in the purchase of 59,000 bullet –proof jackets for security forces, the Home Ministry findings of the testing conducted by a tainted official at DRDO Chandigarh laboratory. The ministry requested the DRDO for initiating disciplinary proceedings against its scientist R.K.Verma, the joint director at the Terminal Ballistics Research Laboratory in Chandigarh.

My RTI related to know the disciplinary proceeding against R.K.Verma. But DRDO have no reply – taken shelter from RTI section 24(1) in corruption related cases?

However major irregularities find out by the ministry of home, but DRDO disciplinary proceedings result is unknown. May possible to promote Mr. R.K.Verma instead of major punishment with the pecuniary arrangement of the Top corrupt officers / scientist?

I request you to take necessary action as per the Home Ministry with those top scientists responsible to provide shelter during disciplinary proceedings.

With high regards,

Your,  Sincerely.

(Rajiv Chauhan)

COPY TO THE : 

 1- Hon’ble President of India for kind consideration and necessary action.

2- Hon’ble Prime minister of India for kind consideration and necessary action.

Rajiv Chauhan

FOR DETAIL PL. SEE ENCLOSERS

DRDO Bulletproof Jacket Scam
Rajiv's RTI page 1
Rajiv's RTI page 2
DRDO RTI Reply

DRDO Scientist recommendation with false information to grant extension of service for a period of two years beyond the age of 60 years; .

Dated : 14-06-12

From-                                                                                                                             Rajiv Chauhan;                                                                                                 1053/3,Shastri nagar,Meerut(U.P)                                        09412628314;09258045938;

 

To,                                                                                                                               Hon’ble Defense Minister;                                                                                    Govt.of India,  New Delhi,

Subject –  DRDO Scientist recommendation with false information to grant extension of service for a period of two years beyond the age of 60 years; .

Respected Sir,

This is not a single example which is put up before you that how the recommendations with false information to grant extension of service for a period of two years beyond the age of 60 years; given by the DRDO HQ.  Is it a misuse of office for misuse of powers or a pecuniary arrangement with involvement of corruption?

Dr.Rao A Subhananda ; Distinguished Scientist, particulars recommended by the DRDO HQ with false information that ‘NO’ any VIGILANCE proceedings are pending or contemplated against the officer, However in a RTI reply it found that a Vigilance proceeding is pending against the scientist. I hereby enclose that annexure with DRDO HQ false information and related RTI information. Both information is contradictory. Which is a right information, Information given by CVC or given by the DRDO HQ?

I request you to take a suitable and necessary action against the responsible officer, who sent the recommendation with false information to the Govt. of India.

With high regards,

Your’s,  Sincerely.

 

(Rajiv Chauhan)

COPY TO THE : 

 1- Hon’ble President of India for kind consideration and necessary action.

2- Hon’ble Prime minister of India for kind consideration and necessary action.

 

Rajiv Chauhan

 

 

 

Misuse of the financial powers by the DRDO officers / Scientist. Can you fix accountability & responsibility for recovery?

Dated : 12-06-12

From-                                                                                                                                             Rajiv Chauhan;                                                                                                            1053/3,Shastri nagar,Meerut(U.P)                                                                09412628314;09258045938;

To,                                                                                                                                             Hon’ble  Defence Minister;                                                                                                     Govt.of India,  New Delhi,

 

Subject :   Misuse of the financial powers by the DRDO officers / Scientist. Can you fix accountability & responsibility for recovery?

Respected Sir,

CAG reports clearly is showing the financial losses by the DRDO officers / Scientists in different projects as attached for your perusal. Head of the department of the DRDO failed to fix the accountability & responsibility for these losses. Can you fix it for recovery?

I am unable to understand that why Head of the DRDO fail to fix the accountability & responsibility for these Billions losses which is clearly indication of the misuse of DRDO office and financial powers. A high level corruption after pecuniary arrangement is possible.

I will be highly obliged for your kind consideration and necessary action to fix the accountability & responsibility for recovery.

With high regards,

Your,  Sincerely.

 

ACA(Rajiv Chauhan)

COPY TO THE :   1- Hon’ble President of India for kind consideration and necessary action.

2- Hon’ble Prime minister of India for kind consideration and necessary action.

3- Director, CBI, New Delhi  for kind consideration and necessary action.

 

(Rajiv Chauhan)

 

CAG Report on DRDO

No.12 of 2010-11 (Defence Services)

 

CHAPTER VI :

DEFENCE RESEARCH AND DEVELOPMENT ORGANISATION

6.1 Injudicious creation of assets

An expenditure of Rs 8.92 crore incurred by Defence Research and Development Organisation (DRDO) for creation of assets to draw power from a power supply corporation became infructuous due to DRDO’s failure to assess the corporation’s ability to supply stable and uninterrupted power required for operation of highly sensitive equipment and machines.

DRDO imported various sensitive equipment and machines for creation of technical facilities for a programme of strategic importance at a station. These facilities required uninterrupted and high quality stable power supply. Based on the recommendations of a Board of Officers, Ministry of Defence accorded sanction in March 2000, as amended in December 2001, for provision of external electrification at the station at a total cost of Rs 9.54 crore, to be executed by a Chief Construction Engineer, Research and Development (CCE R&D). The CCE R&D completed the works for power

supply receiving and distribution to each of the sites within the station, under the supervision of the State Power Supply Corporation, in November 2001 at a cost of Rs 9.15 crore including expenditure of Rs 0.23 crore for power distribution to living accommodation. The corporation had agreed to supply 4500 KVA of power, in a phased manner, as sought by DRDO. However, before creating the assets for drawing power from the corporation, DRDO did not get firm assurance from the Power Corporation for supply of the quality of power required by DRDO for operation of the sensitive

equipment/machines of the programme. Due to excessive variations in voltage/ frequency/current in the power supplied by the corporation, the imported equipment procured under the programme did not function properly. This along with frequent interruption in power supply forced DRDO to procure DG Sets, separately at a cost of Rs 3.57 crore for the facility. Only the living/ administrative accommodation which required meager quantity of power could use the power received from the corporation. The contract demand was therefore reduced from 4500 KVA to 600 KVA by September

2004 for the day to day operation of the site and other technical facilities including the living/administrative accommodation. Further, a sum of Rs 1.80 crore was spent during 2002-09 for maintenance of the 66 KV line and associated facilities to avoid deterioration. Thus the expenditure incurred on establishing a sub station to support the 66 KV line was rendered infructuous. The Ministry admitted in September 2009 that DRDO had relied upon the State owned power corporation to adhere strictly to the quality specifications as laid down in the Indian Electricity Rules 1956, which they didn’t do.                                                                                     

TheMinistry also stated that such a complex technical facility, which is of strategic importance to nation’s security, was being established for the first time in the country and DRDO could learn its complex requirements from this experience and argued that the expenditure should not be treated as wasteful as the experience learned from this project was utilized in the next project where they did not seek the provision of electricity from state Electricity Board and had commissioned required DG sets directly. The Ministry added in February 2010 that a new Radar system planned for Air Force requirement would be assembled at the station in a period of two to three years and there would

therefore be higher usage of the substation in the future. The Ministry’s statement about the likely utilization of the assets when the planned radar system for the Air Force comes up in the next two-three years does not validate the creation of the assets in the year 2001 and keeping them idle for over a decade. Thus, the failure of DRDO to assess the ability of state power corporation to supply to the required specifications for operation of sensitive equipmentresulted in an infructuous expenditure of Rs 8.92 crore, besides burdeningitself with a recurring liability of maintaining the redundant assets

6.2 Loss due to damage to imported equipment DRDO suffered a loss of Rs 6.91 crore as an imported equipment was damaged due to mishandling by the Air Consolidation Agent.

The Director of a Defence R&D Laboratory placed purchase order on a UK based firm in October 2006 for a machine required for a project at a cost of Rs 18.46 crore. As per terms of the purchase order, 70 per cent payment (Rs 12.23 crore) was made to the firm on shipment of the machine. Remaining 20 per cent of the amount was to be paid after installation and 10 per cent after the end of the warranty period. The machine was to be delivered by end of July 2007 at the laboratory premises through an Air Consolidation Agent (ACA)17 having Air Consolidation Contract with the Defence Research and Development Organisation (DRDO). As per terms and conditions of the contract, the ACA was responsible for all losses or damages to the equipment due to any cause whatsoever from the time they receive the shipment till delivery at consignee’s end. It was also stipulated in the contract that in case of losses to stores occasioned on account of Agent’s negligence, the amount spent on account of ACAs negligence will be recovered from the Agent’s pending bills. The machine arrived at Delhi Airport on 8 August 2007 and was locally transported by the ACA on 9 August 2007. One package consisting of the main equipment of heavy weight and size was damaged as it fell down while unloading at the laboratory premises due to mishandling for which the ACA was responsible. 17 M/s Balmer  Lawrie and Company Limited: responsible for Air Consolidation Services, custom clearance and carrying of machine/stores being imported by DRDO Laboratories.

The Court of Inquiry (COI) constituted by the Director of the laboratory, to assess the loss and circumstances leading to damage found that the damage to the equipment was caused by the ACA while unloading. It was also revealed that the machinery and tools used by ACA while unloading were insufficient. The COI further recommended that pending settlement of the claim for liability of loss, the damaged component be got replaced from the supplying firm. Accordingly, the Director of the laboratory placed order on the same firm in January 2009 for supply of a new equipment for replacing the damaged one at a cost of Euro 960,000 (Rs 6.21 crore) excluding customs duty of Rs 0.70 crore which was to be paid by the Laboratory separately. The equipment was to be delivered by October 2009. Audit observed that despite contractual obligations, the laboratory did not raise any claim for the loss against the ACA though on behalf of the laboratory the ACA had lodged a claim of Rs 9.04 crore in February 2008 with the Insurance Company. The Insurance claim had however, not been finalized by the Insurance Company as of October 2009. The case reveals that DRDO has not only lost time but also suffered a loss of Rs 6.91 crore on account of damage to the equipment due to mishandling by ACA, which was yet to be made good as of October 2009 for which even the

claim has not raised against the transporting agency. In their reply of October 2009, the Ministry stated that they were making best efforts to recover the money to make good the loss. 

6.3 Avoidable expenditure due to poor planning of a work service Poor planning of a work service by the Programme Director and Chief Construction Engineer, led to an additional expenditure of Rs 1.39 crore towards payment of compensation to the contractor.

In January 2006, Chief Construction Engineer (CCE) Research & Development (R&D) Secunderabad entered into a contract with a firm for construction of accommodation for System and Test Integration RIG (STIR) at the cost of Rs 18.78 crore, to be completed by July 2007. A Board of Officers had earlier assembled in May 2005 to consider the requirement of work services for STIR of a Defence Research and Development Programme at Bangalore and recommended construction of the facility on top priority and also that the work relating to the shifting of 66 KV power (HT) line running right through the middle of the selected site, be taken up and executed separately to facilitate the construction. The Programme Director (PD), STIR was to make the site available to the contractor within four weeks of conclusion of the contract. However, action was not taken by the PD to get the HT line shifted. In March 2006, the PD and CCE decided that the work for shifting the line would be executed through the CCE. As clear work front was not made available to the contractor for eight months after the award of work in January 2006 the contractor could not proceed with the work. The CCE concluded a separate contract in June 2006 with the same contractor for shifting the line and got it completed in October 2006. The CCE granted extension of time for completion of work from July 2007 to March 2008. Against a compensation of Rs 3.67 crore claimed by the contractor to offset the expenditure incurred on idle machinery/manpower and increase in cost of material/labour due to the delay in commencement of work, DRDO had to pay an extra-contractual amount of Rs 1.39 crore. On being pointed out, the CCE informed Audit in November 2007 that it was initially planned that the programme authorities would shift the HT line and make the site available for construction. The task was later transferred to CCE only in June 2006. After transferring the responsibility, the CCE concluded the contract in June 2006 without further loss of time for shifting the HT line. These statements of CCE were not totally correct as in March 2006 itself, the

PD and the CCE had decided that the shifting of HT line would be undertaken by the CCE. However, the CCE took another three months to award the contract for shifting the HT line. Thus due to poor planning of the work services by the PD and the CCE and their failure to ensure shifting of HT line before award of the contract for the work services resulted in an avoidable payment of Rs 1.39 crore to the contractor, besides delaying execution of the work. The case needs to be investigated so as to fix responsibility for the lapse. The Ministry stated in January 2010 that partially clear site was made

available to the contractor and the work on piling was commenced on date in the areas/locations other than 66 KV HT line shadow. It was further stated that delay of eight months was beyond the control of DRDO. The facts, however, remain that the contractor could not progress with the work for eight months due to non-shifting of HT line for which additional payment of Rs 1.39 crore had to be made to the contractor, which could have been avoided had the HT line been shifted in advance.

6.4 Loss due to lack of coordination in procurement of a life saving item An expenditure of Rs 93.09 lakh incurred on procurement of drugs proved infructuous as the drugs could not be issued to users within their shelf life. Although the life saving item was accepted in September 2004 for use in the Army, it remained undistributed for nearly five years predominantly due to the lack of coordination between the developer and the user.

The Autoject Injector (AJI) set consisting of two individual autoject injectors, one containing Atropine Sulphate and the other containing PAM Chloride was developed by Defence Research and Development Establishment, Gwalior (DRDE) of Defence Research and Development Organisation (DRDO) to treat and counteract nerve agents poisoning. On exposure to nerve agents, these are to be used by individuals for immediate treatment by self administered injection. Based on the requirement projected by Army HQ, the Ministry of Defence (MOD) issued sanction in September 2004 for production and supply of Autoject Injectors along with equal number of Atropine Sulphate and PAM

Chloride drug through DRDO. The sanction stipulated that the terms of supply of equipment would be determined and monitored by Army HQ/MOD in consultation with DRDO. DRDE procured from private sector firms 32,400 AJI for injecting Atropine Sulphate and 32,400 AJI for PAM Chloride along with 33,000 each of Atropine Sulphate drug cartridges and PAM Chloride drug cartridges at a cost of Rs. 2.80 crore, of which Rs 93.09 lakh was for the drug cartridges. Shelf life of AJIs was five years, that of Atropine Sulphate drug was two years, and it was only one year for PAM Chloride drug. The AJI and drug Cartridges were received during May/December 2005 and September 2005/January 2006 respectively. However, Army HQ did not intimate the consignee details to DRDE. In response to a request by DRDE, Army HQ (Additional Director General Weapons and Equipment) advised them in February 2006 to obtain consignee details from Dy. Director General Perspective Planning (Nuclear Biological and Chemical Warfare) and to deliver the consignments only after the items were duly inspected and certified fit in all respects by the representatives of the users. In the Joint Inspection, which was not attended by the user’s representative, held in April 2006 it was found that 25700 AJIs of Atropine Sulphate and 27,689 AJIs of PAM Chloride were acceptable. The remaining were defective and therefore rejected. The date of expiry of the drug PAM Chloride varied from June 2006 to October 2006 and that of the Atropine Sulphate varied from May 2007 to October 2007. In view of the early expiry of the drugs, the Joint inspection team recommended that process be initiated to replenish the drug cartridges. DRDE informed Army HQ in April 2006 about the acceptance in inspection of AJIs and sought consignee details. In July 2006, Army HQ asked DRDO HQ to send these to the Central Ordnance Depot Kandivli. Army HQ simultaneously informed DRDO HQ that the drug cartridges of PAM Chloride with balance shelf life of less than 75 per cent and Atropine Sulphate with shelf life expiring before 01 October 2007 should be replaced. In July 2006, DRDE issued 25,000 AJIs along with drug cartridges to Armed Forces Medical Store Depot Mumbai as later advised by Army HQ. However, the supplied stores could not be used due to non-availability of adequate shelf life of drug cartridges. DRDE placed supply orders for 8000 each of for AJI (Atropine Sulphate and PAM Chloride) and drug Cartridge 33000 each at a cost of Rs 0.12 crore and at a cost of Rs 1.35 crore respectively. Joint inspection was carried out for Atropine Sulphate and PAM Chloride drug cartridge received between July and September 2008. However, these were rejected by DGQA in October 2008 due to detection of butyl fragments in the injected content of drug, less injection of drug than the stipulated therapeutic dose making it ineffective and weak plastic bodies of reusable injectors. Army HQ in June 2009 formed a study group to analyse the complex issue in its totality. Based on the recommendations of the Study Group suggestions of Director General Armed Forces Medical Services and reassurance of DRDO about the efficacy of the drugs, Army HQ agreed to accept the AJIs and the drugs in their present condition for use during emergencies only, with the condition that DRDE would develop improved version at the earliest. The overriding consideration for the acceptance of the AJI/drug was that the advantage of the AJI outweighed the potential risks associated with the deficiencies pointed out by DGQA in October 2008. The Ministry of Defence stated in November 2009 that there was no loss since the Army had accepted the AJIs and drugs. The fact remains that the procurement of drug cartridges at a cost of Rs 93.09 lakh during 2005-06 was clearly a loss since their shelf life expired before the AJIs were accepted for use by the Army. Although the sanction issued by the Ministry in September 2004 stipulated that the terms of supply of equipment would be determined and monitored by Army HQ/MOD in consultation with DRDO, the above events are symptoms of lack of coordination and understanding among DRDO HQ, Army HQ and DRDE. Resultantly, the AJIs and their drugs developed for use in emergencies as life saving items remained without any use for nearly five years with associated financial repercussions such as loss on account of expiry of their shelf life. The case points to the need for a better coordination and communication between the associated agencies

to accomplish value for money and the Research and Development efforts. 

  No. 24 of 2011-12 (Defence Services)

6.1 Blockage of public money due to take over of unusable land Imprudent decision to acquire forest land by DRDO at a cost of ` 73.26 crore which could not be used for other than forest purpose not only delayed the completion of project but also blocked Government money

as land was not used for the project.

The Ministry of Defence in June 2003 sanctioned a project for ‘Development of Vehicle Mounted energy System’ by Defence Research and Development Organisation (DRDO) at a cost of ` 97.40 crore. The project was to be completed by June 2010. An ‘Integration and Test Facility’ was to be created under the project in a vast area of approximately 700 acres of land for testing purpose.DRDO initiated action in February 2004 for acquisition of 700 acres of land at Faridabad for the facility. The requirement was increased to 1100 acres in August 2005. The identified land belonging to Faridabad Municipal Corporation was covered under the Forest Conservation Act, 1980 and notifiedas such by Haryana Government in August 1992 under Section 4 of Punjab Land Preservation Act, 1900 (PLPA) which prohibited erection of buildings on the land. DRDO enquired from the Conservator of Forests, Haryana regarding the formalities to be completed for diversion of forest land for nonforest use and compensatory afforestation charges to be paid under Forest Conservation Act, 1980. Conservator of Forests, Haryana informed in November 2005 that out of the total 1104 acre of proposed land, 1091 acres of land was forest land. He also informed that Hon’ble Supreme Court in its order dated 18.3.2004 clarified that land notified under Section 4 & 5 of PLPA 1900 would be treated as forest and diversion of this land for non-forestry use would invoke Forest Conservation Act, 1980 under which this land cannot be put to use for nonforestry purpose without obtaining permission from the Government of India. Despite this, the Haryana Government in August 2006 on reconsideration offered 1100 acres of Forest land at Faridabad to the DRDO at the rate of ` 18 lakh per acre. DRDO in May 2007 reduced their requirement to 407 acres of land. In July 2007, the Commissioner, Faridabad Municipal Corporation informed DRDO that the Haryana Governmen