MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

To.                                                                                           3rd June 2019

Shri Rajnath Singh Ji

104.  South Block

New Delhi – 110011

Dear Sir,

Congratulations for great victory and taking charge of big responsibility of Defence Ministry.

MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

In an unprecedented move the defence public sector undertaking Bharat Electronics Limited (BEL) has suspended three senior officials, who unearthed massive irregularities in the Indian Air Force’s confidential IACCS project- underground bunkers- at 10 strategic locations. The three officials were part of Inquiry committee set up by the BEL’s Chief Vigilance officer (CVO) in July 2018 . The team exposing the role of high ranking officers and manipulation of awards of contracts in Rs.8000 Crore project had submitted the report in October 2018. Instead of taking action against the corrupt officers, BEL management led by its Chairman MV Gowtama, who himself is under the scanner in IACCS project, acted with vengeance and suspended the investigation team members.

It is pertinent to mention that after three-member probe committee submitted the report, BEL CVO , a senior IAS officer MR S.SHIVA KUMAR  1987 BATCH in his note dated 29 March 2019 exposed the deep-rooted corruption recommending strong action against erring officers and firms. Yet, the CMD , who is likely to be arrested if a probe is ordered, cracked the whip against inquiry committee members for doing honest job. This crackdown is in spite of  the fact that the CVO of the company as appointed by CVC of India had established and validated each point of the investigation report  and strongly recommended to management of BEL for immediate police and civil criminal action against concerned BEL officers and chief consultant of the project M/s RD KONSULTANT.  The role of senior DRDO officers is also under the scanner since it was DRDO which recommended and fully supported the name of RD Konsultant to BEL although it was done informally and BEL surreptitiously avoided DRDO role in the files. The role of DRDO officers was brought out and exposed by the BEL vigilance probe team which was suspended on 17 May 2019.  To distract the government’s IB report, CMD, BEL created suspension drama of three personal of BEL, 2 GM Vigilance and one manager to fooling the country. This shows the clear mockery of BEL management.

M/S RD KONSULTANT – DELHI  , which came out to be a shell company in investigation report , incorporated just 3-4 months before the award of PPR consultancy project with all false  and fabricated documents, and was wrongly  awarded DPR consultancy project also violating BEL own manual procedures as well CVC guidelines with a criminal intent of having control over all future activities of civil contract as well infrastructure/ Plant and machinery  items procurement worth more than Rs 3500 crores, as recorded in noting files  and  many senior management personals of M/S BHARAT ELECTRONICS , which is continuously being done since UPA CONGRESS REGIME 2011.

One very interesting fact of the whole case is that the two BHARAT ELECTRONICS senior management personals named Mr N.K. SHARMA DIRECTOR( MARKETTING) and MR CHANDERPRAKASH EXECUTIVE DIRECTOR (D&E) GAD, who were the chief &key persons for co ordinating the IACCS project getting approved from Indian air force, joined  a company named “OIS ADVANCE TECH” – 90% OWNDED BY MR SANJAY BHANDARI – famous arms dealer & power broker  and close associate of ROBERT WADRA immediately after their retirement from BEL in 2010 and 2011, and immediately after this this project got formally started by BEL . 

The detailed and very exhaustive investigation done by fact verification team in early 2018 and further investigation team in end 2018 and subsequently report by CVO of M/s Bharat Electronics has established the details of  massive corruption and mal practices done by M/S RD Konsultant, its associate/related firms and senior management persons of BEL  ( since 2011 onwards till now), by abusing their powers and violating all BEL manuals as well as documented CVC guidelines for tendering for award of civil project works and procurement of items worth more than 3500 crores.

These civil contract worth more than 1000 crores have been given of paper to reputed firms like M/S L&T but at almost 30 % higher and inflated rates (as also mentioned by then Director (Finance) Mr PRABHAT ACHARYA in file noting about more than 100 crore loss as well as violation of BEL Contract manual conditions as well as CVC guidelines) and after some period he resigned from company. After this project given to m/s L&T are being done by M/S RD consultant sister concern named M/S CS CONSTRUCTIONS at sites ( even MD- Mr Rahul Baucher  of M/S CS Construction used to come to BEL-Ghaziabad unit  for regular review meeting on behalf of L&T) – A serious violation of CVC  guidelines as well contract conditions of BEL & M/S RD KONSUL) , which seriously compromise the quality , as it is a very small petty company which in no way  has a technical capability and skill to deal such highly technical and secured project. This fact as validated by the fact that some sites were shown as collapsed during construction and crores of rupees were further approved by BEL management in name of deviation with fixing the responsibility on contractor.

The detailed design which was submitted by M/s R.D. Konsultants specified vendors for all the sub-systems which are used in the blast proof underground buildings. It is seen that these vendors are the same which they had brought out to be their partners during presented made by then during the Pre-qualification bid. The Order which was placed on BEL by Air Force was also based on the detail design report submitted by M/s R.D. Konsultants and hence all these vendors called in the order from Air Force were the same which were defined by M/s R.D. Konsultants.BEL has in turn placed many orders for the sub-systems based on the vendors defined by M/s R.D. Konsultants. A visit was made to the works of many of these European vendors by a team of engineers from BEL along with Air Force personnel. But is it said that the team was accompanied by a rep from M/s R.D. Konsultant and the visit was coordinated by M/s R. D. Konsultant. These foreign companies were allowed to supply materials on a single tender basis by the BEL chairman MV Gowtama. He in fact overruled his own officials and approved qualification of several firms despite they had failed to submit bid details during prescribed time. Such gross violation was similar to the ones seen during 2G scam. BEL Chairman violated the laid down norms by allowing these foreign firms despite objections duly recorded by the finance division.

All above shows a case of massive corruption, fraud and abuse of power with criminal intent and a huge loss to Government public money by BEL senior management persons in connivance with chief consultant, EX DRDO and some IAF officials. The whole investigation report findings are finally found true of the fact that as it is learnt from top BEL & DRDO sources last week M/s RD Konsultant has written to BEL MANAGEMENT that as his chief designer has left the company and now on this bogus consultancy company’s  design, specifications and whole scheme of the project BEL management has already  spend thousands of crores of public money  and suppose its design does not work then who will own the responsibility of whole scam. Now the news that the firm M/S RD KONSULTANT is running out of project the reason could only be because his fraud has come out in media and BEL current management instead of taking legal action against the corrupt, trying to harass and victimize the honest and brave investigation team members ( in name of media leak- which even our prime minister call  as a strong pillar of democracy) .

The team which is suspended and currently facing all type of harassment, victimization and humiliation of suspension, but in spite of all pressures and threats, have unearthed this scam just to keep the spirit of national security and defence importance   and demand only for justice but calling for a detailed CVC/CBI/ED enquiry outside BEL management preview immediately and immediate intervention of MINISTRY OF DEFENCE for action on some BEL senior management for their misdeeds

A honest and sincere appeal to all  concerned officials of PMO/MOD /CVC/PRESS/JUDITARY that please take immediate action in this regard to keep “CHOKIDAR “ alive in our souls  by safeguarding the honour of investigation team officials.

ABOVE ALL MATTER IS COVERED IN DETAILS BY  A REPUTED NEWPAPER

“FIRSTPOST”  IN ITS ARTICLE DATED 02 APRIL, 09 APRIL & 26 April 2019

Before publishing in media the matter was available with AF Intelligence, CVO, CBI, North Block, Chairman, DRDO, IB in March itself but god knows why any agency not take-up this matter seriously.

Hope you will take up matter seriously as you are responsible Chairperson, Audit Committee of BEL and may be aware of all developments from side of BEL management who are posing that matter is mare deviation of 50/60 lakhs as a bonafide fighter against defence corruption since more than 20 years I am fully aware of nexus. This nexus was designed by Retired Scientist of DRDO with ex DRDO chief because the U/G work of services was sole right of DRDO via SPIC, but when retirement stage these corrupt DRDO official gang create the scene and diverted this activity to BEL which doesn’t have any type construction division like DRDO have, U/G plant machinery experience either trading nor manufacturing in this tender only 500 cr electronics involvement can BEL claimed. As per investigation and observation it is clearly visualize that few greedy BEL official trapped in vicious DRDO official and for sake of few bucks they compromised with national security as well as their organization’s dignity. Please ask the vigilance report prepared by these three suspended BEL employees, Report is not an eye opener but will help govern to expose UPA era nexus who are responsible to siphon the defence budget under shadow of secrecy. 

Regards

Prabhu Dandriyal,

21-Sunderwala, Raipur,

Dehradun-248008

Phone – 0135-2787750 | Mobile – 9411114879

Email – prabhudoon@gmail.com | website – www.corruptionindrdo.com

Bharat Electronics in the dock for ‘compromising’ confidential IAF project, favouring one vendor, BEL’s internal inquiry report reveals

Yatish Yadav Apr 02, 2019 – Firstpost

New Delhi: Defence public sector undertaking Bharat Electronics Limited (BEL) is under the scanner for allegedly compromising national security by awarding a highly sensitive air command and control contract of the Indian Air Force to an ill-equipped and newly formed private design firm in 2011. The project was worth Rs 7,900 crore.

An internal inquiry report of BEL has exposed massive irregularities in the way the contracts were awarded and how the Integrated Air Command and Control System (IACCS) was implemented at 10 locations across the country.

IACCS is an automated command and control system for air defence operations that integrates all ground-based and airborne sensors. BEL is the executing agency for the highly-sensitive project.

BEL’s internal investigation report — exclusively reviewed by Firstpost — also highlighted a conflict of interest of a BEL officer, who was instrumental in the hiring of a private vendor to put together the Preliminary Project Report (PPR) of the coded system, in joining the same private company after retirement. The report also suggested that the investigative team looking into the irregularities was not provided with crucial project documents allegedly to bury the scam.

The defence PSU’s internal inquiry report was prepared in October 2018. It flagged discrepancies at various stages of the execution of the project. To begin with, the report questioned the move to hire M/s RD Konsultants to prepare the PPR in 2011 and then bringing the same company on board as the design consultant in 2013, violating the norms in place during UPA regime. The inquiry report also red-flagged other serious issues, including monumental lapses in ordering the execution of the contracts at all 10 sites across the country and deviations in the implementation at certain project sites where BEL had to bear additional expenditure.

After Firstpost mailed a detailed questionnaire to MV Gowtama, chairman and managing director (CMD) of BEL, Ranjit Karamchandani from the CMD’s office denied the findings of the firm’s own inquiry report.”BEL follows a transparent process in selection of its vendors/partners,” he said. “Prima facie, BEL does not see any irregularity, as alleged.”

Questionnaires sent to RD Konsultants seeking its comment on findings of the inquiry report went unanswered.

Deep-rooted nexus exposed

According to the inquiry report, BEL first hired RD Konsultants in September 2011 to prepare the PPR for IACCS. The report pointed out that the firm was barely one and a half years old when it was hired, having come into existence on 1 April, 2010, on 50-50 partnership between Ruby Kant and Suresh Kumar Anand. The BEL top brass approved the proposal to award the contract to the company on 6 September, 2011, with a note that made it amply clear that “as per corporate vigilance guidelines, if ‘M/s RD Konsultants’ is hired as a consultant for preparing the PPR, then it cannot be considered for similar requirements in the future”. The note added that for the IACCS project, BEL would have to look for new consultants for “future requirements of consultancy”.

The inquiry report also flagged the way RD Konsultants was hired to prepare the PPR. “…No norms of Request for Proposal or tendering were followed, but it was selected just based on a recommendation by the Defence Research and Development Organisation (DRDO) with no written correspondence from the DRDO,” it said.

But BEL officers went a step ahead to allegedly favor RD Konsultants in the second stage of the project while hiring a consultant to prepare a Detailed Project Report (DPR), the inquiry report suggested. As per the rules in place in October 2012, BEL formed a committee to select consultants to prepare the DPR along with a detailed design for 10 sites of IACCS nodes. That RD Konsultants should not have been allowed was clearly mentioned in the file initiated by BEL’s Network Centric System (NCS-Strategic Business Unit) on 28 July, 2011, and cleared by the top brass on 6 September, 2011. But that did not happen.

RK Handa, who was the general manager of the NCS at the time, was part of the committee that selected the vendors and hired RD Konsultants in 2011, the report noted.

“In fact the file raised in October 2012 should have been in continuation to the file initiated on 28 July, 2011. Why it was not done needs a detailed investigation with respect to malafide intentions to violate the Central Vigilance Commission’s guidelines for hiring of consultants,” it added. “Even in the selection of M/s RD Konsultants for the second time, there were a lot of deviations from the norms laid down.”

The inquiry report further highlighted that had a financial criterion been put in place, RD Konsultants would not have qualified for the job.

The defence PSU signed the second contract with the firm in September 2013 to prepare the DPR of all 10 IACCS sites. The inquiry report noted that RD Konsultants was paid Rs 13.5 lakh for consultancy charges to prepare the PPR but Rs 15.94 crore for the DPR, alleging that someone was pulling the strings to favour the company, and that the financial criterion was changed twice during the course of selection of vendors.

“M/s RD Konsultants’ had been established in April 2010, but to show a turnover in the last three years as required, they showed a turnover in 2009-10, also verified by a chartered accountant. This clearly shows that false information was provided. Also, a company that came into existence on April 2010 showed that its employees had an experience of five years in 2013. This again is false information. It is interesting to note that another company, M/s Systems Dynamics, was rejected by the committee on the criterion that it had shown a turnover for only two years (2010-11 and 2011-12),” the inquiry report said.

The chartered accountant certificate enclosed with the inquiry report does not mention a telephone number. The letterhead of the CA firm merely shows an address of Shakarpur in New Delhi.

Raising concerns over the track record of RD Konsultants, the inquiry report recommended further investigation to find out whether it has actually completed the big ticket projects as it claimed to BEL. Raising suspicion, the report said RD Konsultants had mentioned that by March 2013, they had completed 30 projects worth Rs 1,266 crore, with consultancy charges of Rs 36 crore, whereas they had 45 works worth Rs 1,743 crore underway, with consultancy charges of Rs 52.29 crore.

“How was a company, which came into existence in April 2010, awarded 75 projects within three years (when as per DRDO rules, any company without requisite experience and turnover cannot be awarded contracts). What was the timeline in which these projects were completed? These need detailed investigations to find the ground reality. As per the BEL Works Contract Manual, it is mandatory that all vendors who qualify submit proof of the works they claimed to have done. RD Konsultants took the plea that they could not share details of the works since they were for the DRDO and confidential in nature, though another vendor, ‘M/s Systems Dynamics’, submitted documents related to the DRDO as well as the integrated headquarters of the army to confirm the work they did. There is no secrecy in the order copy or listing of the works carried out for the DRDO. Non-submission of the details (by RD Konsultants) itself casts doubts on the validity of the claims made,” the inquiry report said in its scathing observation.

BEL’s inquiry report further alleged that RD Konsultants had claimed to have provided design consultancy to a few well-known brands that specialise in equipment used for structures similar to IACCS, such as Temet Oy Finland and Pro-Hub Germany. It added that RD Konsultants was also into civil construction “with direct/indirect control on a lot of companies like SR Ashok & Associates, CS Construction etc.”

“Being the designer agency, which got the order for all 10 sites, they have a huge influence on the selection of vendors for various sub-systems of the project. A detailed investigation is needed to find out where orders have been placed with companies where RD Konsultants has direct/indirect influence. (There was a case wherein SR Ashok & Associates had applied for civil execution of underground structures and CS Construction was hired by L&T for execution of work at sites). Also, Temet Oy Finland and Pro-Hub Germany have been given orders for sub-systems to be installed inside the IACCS structures,” the report observed.

Moreover, the file to hire consultants for IACCS structures was initiated with the mandate that one agency will not get the order for all 10 sites. Even the newspaper advertisement and qualification document clearly mentioned that a consultancy firm could be given a contract for five sites. However, the inquiry report alleged that the entire process was manipulated. Further alleging serious charges of conflict of interest, the report said BEL officer PK Bhola, who was instrumental in having RD Konsultants cleared to prepare the PPR for the IACCS project in 2011 joined the same company after retiring from the defence PSU. The report said he might have passed on crucial information to benefit the company.

“How come the order for all sites was finally awarded to only one vendor, which violated the tender document? The quote given by RD Konsultants was nearly the same as that estimated by BEL, which leads to doubts whether the methodology of estimates was known to RD Konsultants. Mr PK Bhola (DGM of NCS-Marketing), who was the main resource in BEL for raising all the files and interfacing with the customer for the project, joined RD Konsultants after his retirement from BEL, and hence, all information was being transmitted to RD Konsultants through Mr Bhola,” the report alleged.

Firstpost reviewed two BEL notes regarding the inquiry report’s observations on Bhola. The first note from July 2011 signed by Bhola, when he was the deputy general manager of marketing at the NCS, is on hiring RD Konsultants to prepare the PPR for the IACCS project. The second note, dated 8 August, 2016, which is basically minutes of a pre-bid meeting for two tenders related to the IACCS project. In this, Bhola is mentioned as a representative of RD Konsultants.

Irregularities in ground execution

RD Konsultants is the design consultancy firm for all 10 IACCS sites, but the contract to execute the project was given to different companies. The details quoted by the inquiry report from the files related to the project suggests that after clearance, certain changes were made in the quantities, which escalated the cost of the project by Rs 106 crore to the government exchequer. The report said such changes were concurred to by the BEL director of finance vide note no 37, where it is mentioned that “this is a deviation from the works’ contract manual”.

The report further observed that L&T was awarded the execution work at three sites, but its cost per site was more than that of the other sites being constructed by other companies. The inquiry also found that L&T had subcontracted work at two IACCS sites to a private vendor, which is allegedly linked to RD Konsultants.

“L&T has further subcontracted part of the work at two sites to ‘M/s CS Constructions’, which is again a company related to RD Konsultants. The director of the company, Mr Rahul Bhuchar, has been coming to BEL and meeting the assistant general manager (infrastructure) as a representative of RD Konsultants. The sub-contracting of work by L&T to a party related to RD Konsultants is in violation to the terms of the contract. A civil engineering expert needs to go into the details of the costing for each site and the various considerations that led to the difference in the cost of various sites. As per the file on the selection of a consultant, DRDO representatives had brought out that all sites will be same, with only cosmetic differences in design. If that was so, then how come the difference in the costing between the lowest and the highest is more than two times?” the report said, flagging the loopholes in financial deviations, seeking further investigation into the entire matter.

It also said that under “para 3.2.3 of the design and engineering contract, RD Konsultants and his affiliates as well as sub-consultants have been debarred from providing any goods, works or services”. “RD Konsultants failed to make a voluntary and complete disclosure in this regard, thus violating the contract,” it concluded.

BEL shelled out more due to deviations in project

BEL’s internal investigation report said that at three IACCS sites, deviations in execution on the ground forced BEL to shell out more money. The report observed that at all three locations, the conditions of the sites during excavation were found to be in mismatch with those taken by RD Konsultants while designing and preparation of the Standard Operating Procedure (SOP) for excavation.

The report also revealed that a few IACCS sites under construction had collapsed. An inspection team visited one of the sites on 22 and 23 March 2018 to investigate the mishap. Although CCTV cameras were installed, the BEL fact-finding team was told by its own manager deployed at the site that the footage was not available. Interestingly, an engineer from MECON Limited, the government-owned company that blew the whistle on irregularities at a project site, was transferred. MECON Limited functions under the Ministry of Steel and is working as a project management consultant at five IACCS sites.

Firstpost is withholding the name of the whistleblower and the location of the IACCS project in the interest of national security. The inquiry report mentioned these in detail.

“There was a complaint received from ‘AAAAA’ (site engineer) posted by M/s MECON at the ‘BBBBB’ site alleging that though he had brought out that quality procedures were not being followed at the site, senior executives at BEL, in collusion with the vendor, have not responded to his calls/reports. He alleged that pressure was put on him to ignore the facts since it was more important to meet the timelines. He also alleged that he was transferred along with the local BEL site engineer because they had highlighted that procedures were bypassed. The complaints need to be pursued to find out the facts,” the inquiry report asserted.

Firstpost reviewed the engineer’s complaint dated 28 March, 2018, which was sent to two senior BEL officials. In the letter, he claimed higher officials of BEL impose a lot of unethical verbal instructions on juniors, which is damaging for a PSU of national importance.

“I was posted as the site in-charge of MECON Limited and tried my best to act as a whistleblower, being a part of a project of national importance. I had issued innumerable emails and letters regarding quality issues of the project. But the engineer in charge and other higher officials from BEL desisted me verbally to not follow quality procedures strictly on the pretext of progress of the project. They actually always blindly favored the contractor anywhere and everywhere,” the MECON Limited engineer wrote in his complaint.

“However, when we did not allow any relaxation in this regard and made deduction in bills wherever quality procedures were not followed, higher officials of BEL were not satisfied with the site in-charges (both officials of BEL and MECON Limited) for not favoring the contractor and for following the rule book strictly. For this reason, the BEL general manager and assistant general manager transferred their own site in-charge and pressurised MECON Limited to transfer its senior manager (name withheld) in September 2017 on the pretext that they did not perform satisfactorily, whereas actually it was just the opposite. This was to instill a sense of fear so that other engineers fall in line.”

The inquiry report said walls at the site of another project collapsed twice due to the soil conditions being different from what were assessed by the design consultant when the SOP for excavation was formulated. BEL had to get the soil analysed independently by the Indian Institute of Science in Bengaluru at its own expense.

“The total cost of the execution increased because of the side wall collapse and also the change in the foundation, which, once again, resulted in extra cash flow of crores of rupees. All this needs detailed investigation by some civil engineering expert,” report further added.

The report also highlighted glaring irregularities in the hiring of civil engineer Manish Goyal to look after the IACCS projects’ infrastructure as a manager. It claimed Goyal was hired despite falling short of the required 10 to 12 years’ experience and without having any exposure to highly specialised work like the IACCS project. The report expressed shock over this, saying it was quite surprising how and why the human resources division of BEL did not fully check or verify the documents Goyal’s submitted while establishing his experience as per BEL’s requirements and rules. The report said Goyal earlier worked with L&T. As the manager of NCS-infrastructure, Goyal was later given charge of the three IACCS sites that the infrastructure giant is working on and authorises L&T bills.

It is pertinent to mention that before the internal inquiry report was submitted in October 2018, a three-member BEL team had submitted an investigation-cum-site inspection report in May 2018 regarding certain allegations related to the execution of the IACCS projects. The panel, which included BEL officers AK Raheja, Sayanarayana and MM Roy, had submitted the report to BEL’s vigilance department, concluding that there were serious irregularities in the implementation of the ambitious national security project. Also, BEL’s panel report clearly said that the RD Konsultants’ capabilities were not checked before it was awarded the contract in 2011 and 2013.

“There are evidences of work being subcontracted to CS Constructions Private Limited by L&T, the execution contractor, both on the material and labour front. The registered addresses of CS Constructions Private Limited and RD Konsultants are one and the same. The company profile of YS Anand Consultants Private Limited shows Suresh Kumar Anand (partner of RD Konsultants) and Sarita Anand (director of CS Constructions Private Limited) as its directors. This evidences the fact of RD Konsultants’ involvement with the affiliates related to persons otherwise interested in project,” the panel’s report noted.

“The soil test report as submitted by the design consultant does not match the strata found in excavation,” it added. “Evidence exists of Manish Goyal (manager, NCS-infra), a key person in the infrastructure project, being a former L&T person. The documents submitted by Manish Goyal lack transparency. A part of the work experience of Manish Goyal conflicts with the tenure of pursuing M Tech, and to that extent, his work experience falls short of the minimum eligibility criteria. After the soil collapse at YYYY site (location withheld), no independent inquiry was conducted by the management for any corrective measure. The design of the soil extraction was changed without analysing the reasons for the soil collapse. Although a CAR (Comprehensive All Risk) policy exists in the joint name of BEL and L&T, no insurance claim was lodged. Pinpoint focus by BEL IACCS-Infra is somewhere lacking, and work is being left at the mercy of site engineers and the agencies hired.”

The panel’s report further suggested that BEL officials had tried to cover up the collapse. It indicated that the non-availability of CCTV camera footage at the important sites was yet another attempt to allegedly conceal the wrongdoing.

 

 

Many BrahMos staffers have official data on personal devices:ATS FIR

Shisher Arya, TNN: October 12, 2108

Nagpur: Anti-Terrorist Squad (ATS) investigators grilling Nishant Aggarwal have reported that the BrahMos Aerospace systems engineer confessed to having copied data related to the missiles from his senior colleague Alan Abraham’s computer, when he was still undergoing training in the organization.
The First Information Report (FIR) registered by Uttar Pradesh ATS was accessed by TOI. It says Aggarwal told investigators that he had copied the data from the official computer of his colleague around four years ago, without his permission. The person from whose computer the data was downloaded was posted at the Hyderabad facility of BrahMos Aerospace, where Aggarwal was undergoing training. The person has now quit the job and is pursuing a research project in Canada.
Aggarwal had just joined the organization four years ago, and was posted at the facility in Nagpur before arrested three days ago.
The FIR says Aggarwal confessed that he had copied the data without his colleague’s permission. However, he has also named close to a dozen other colleagues, who, he claims, have even more sensitive data stored on their private computers as wel. the designations of these colleagues include his peers andeven seniors.
However, Agagarwal had no answer to how official data, which was supposed to remain a secret, reached his personal devices pertained to mution of war, supersonic BrahMos cruise missiles.
The FIR further says that apart from storing the details in in personal devices, Aggarwal also had links with two Pakistani Intelligence Operatives (PIOs).They were in contact with him through fake Facebook (FB).accounts in the name of Neha Sharma and Pooja Ranjan.Aggarwal did not reveal anything on how did he got in touch with the two persons on Facebook.Their e-mail IDs have been traced to Pakistan, said the ATS.
Meanwhile, it is learnt that among the papers seized by ATS from Nishant’s computers is a user manual of the missiles supplied to the Indian Navy. The manual is, however, supposed to be 10 years old,and a routine document each engineer has for his reference.Much changes have been made to the system since then, said sources.
Sources said it was sometime during 2011 that such information was provided in soft copy to a number of BrahMos Aerospace employees for reference.Even this was supposed to remain in official computers only.After that, software that does not allow data to be copied or altered has been put in place.
Sources say the investigations began after an IAF officer was held on similar charges early this year. It was found that Neha Sharma was a Facebook friend of this officer too. An army officer at Jabalpur too was under scanner.
The FIR mentions that the PIO agents using fake names had been extracting information from top officials of important defence establishments of the country. Their tactics included honey trapping and even blackmailing and bribaery.
IN A NUTSHELL
Colleague from whose computer Aggarwal copied data was posted at Hyderabad, Aggarwal was trainee at that time.Colleague has quit job and is now pursuing research at Canada.
Aggarwal named a dozen other colleagues who have official data on their computers.
ATS FIR says two Pak operatives — Neha Sharma and Pooja Ranjan – had befriended many defence officials.
Honey-trapping, bribery and blackmail were tactics to glean information.

DRDO whistle-blowers seek Sitharaman’s intervention

Abhinandan Mishra
May 26, 2018 – Sunday Guardian Live

Defense Minister Nirmala Sitharaman.

Arun Jaitley had ordered action against two senior scientists in a case in DRDO.

Whistle-blowers and scientists working with the Defence Research and Development Organisation (DRDO) have written to Defence Minister Nirmala Sitharaman, seeking her intervention in an alleged corruption case within the DRDO. Sitharaman’s predecessor Arun Jaitley had ordered disciplinary action against two senior scientists in this case, but no action has been taken yet. This newspaper is in possession of a correspondence that was shared by the whistle-blower with the Defence Minister. As per this correspondence, R.K. Jain (Director, Joint Cipher Bureau of the DRDO) and A.K. Singh (Director, Institute of Nuclear Medicine & Allied Sciences) were allegedly found to have been involved in “wasting” government money by conducting interviews for the promotion of scientists in DRDO, despite statutory rules barring such interviews. The DRDO had later stated that even though Rs 1 crore had been spent on calling 255 scientists for the interview, the results of the interview were not used to decide the promotions.

At the time of the interviews in 2011, R.K. Jain was the director of DRDO’s Recruitment and Assessment Centre (which takes care of recruitment and promotions), while A.K. Singh was the director of Directorate of Human Resource Development.

As per DRDO’s own admission, the amount spent on conducting similar interviews in subsequent years (2012 and 2013) was far less than what had been spent in 2011, though a greater number of scientists were interviewed—333 in 2012 and 376 in 2013. When contacted, Manish Bhardwaj, the spokesperson of DRDO, sought some time to respond and told this newspaper on 17 May: “The matter is being examined by a committee on the direction of Hon’ble Raksha Mantri. The committee shall submit the report in 3-4 days. After submission, DRDO would be in a position to provide the information sought by you.” However, no further information regarding the submission of the said report was shared by the spokesperson with this newspaper.

Official sources within the DRDO stated that no such committee was ever constituted in the matter.

The entire incident had come to light when a whistle-blower from DRDO first wrote to the Defence Minister and the Chief Vigilance Officer in July 2014, detailing how public money was wasted and that the whole process was used by the individuals concerned to indulge in alleged corruption.

“Instead of taking action against the two officials for their deliberate misconduct, DRDO rewarded them by awarding R.K. Jain with ‘Best techno managerial services/popular science communication award for his performance in 2011. A.K. Singh was promoted from the grade of Scientist F to the grade of Scientist G in 2011,” reads the latest communication to Defence Minister Nirmala Sitharaman. In June 2017, the then Defence Minister Arun Jaitley had ordered disciplinary action against Jain and Singh for causing a loss of Rs 1 crore to Government of India. “DRDO is known for using delaying tactics to shield officers. It deliberately sits on disciplinary orders of defence ministers to make sure that the officials in question retire without facing any punishment. They did this when Jaitley was the Defence Minister and are doing the same under Nirmala Sitharaman,” one of the whistle-blowers said.

आइआरडीई एल्युमीनियम चोरी की शिकायत एसएसपी को

  • 2011 में आइआरडीई से निकला था पांच ट्रक एल्यूमीनियम
  • एक ट्रक माल नहीं पहुंचा था गंतव्य तक, संस्थान ने भी की थी जांच

जागरण संवाददाता, देहरादून: रक्षा क्षेत्र के अति संवेदनशील यंत्र अनुसंधान एवं विकास संस्थान (आइआरडीई) के तीन साल पुराने एल्युमिनियम चोरी के मामले की शिकायत आखिरकार फाइलों से बाहर निकलकर पुलिस तक जा पहुंची है। संस्थान के टेक्निकल स्टाफ ऑफिसर वीके गोयल ने वरिष्ठ पुलिस अधीक्षक को पत्र लिखकर मुकदमा दर्ज करने का आग्रह किया।

एसएसपी को भेजे पत्र में टेक्निकल स्टाफ ऑफिसर ने एल्युमिनियम चोरी होने को लेकर की गई विभागीय जांच की प्रति भी संलग्न की है। शिकायत के मुताबिक 28 जून 2011 को आइआरडीई से पांच ट्रक एल्युमिनियम निकला था। इसमें से एक ट्रक (करीब 500 किलो) गंतव्य तक पहुंचा ही नहीं। इसको लेकर संस्थान ने जांच भी की। किन-किन कार्मिकों की मौजूदगी में ट्रक संस्थान से चले थे, इसका खुलासा होने के साथ ही कई चौंकाने वाली बातें भी जांच में सामने आई थी। हालांकि इसके बाद जांच रिपोर्ट पर कोई कार्रवाई नहीं हुई। उधर, एसएसपी पुष्पक ज्योति ने बताया कि पत्र का संज्ञान लिया जाएगा। जल्द आगे की कार्रवाई की जाएगी।

 

Dainik jagran10 April

 

The above case is not processed by Director, IRDE on the pressure of IRDE Union, the recruitment, promotions, disciplinary proceeding, internal postings, even temporary duties are influenced by  IRDE Union. Raipur Thana & Dalanwala Thana is witness of several cases of fighting & compromises.

IRDE goyal 3 case

 

IRDE goyal4 case1

NTRO tranfers officer for exposing corruption

Dalip Singh | Mail Today | New Delhi, June 14, 2011

Suresh Sharma exposed corruption and nepotism in sensitive appointments made by top brass of NTRO. Read more at: http://indiatoday.intoday.in/story/national-technical-research-organisation-tranfers-officer-for-exposing-corruption/1/141405.html
Suresh Sharma exposed corruption and nepotism in sensitive appointments made by top brass of NTRO.

A senior official in the National Technical Research Organisation (NTRO) is facing the heat for blowing the whistle on corruption and nepotism in the premier intelligence body.

Director (establishment) Suresh Sharma was moved out of the NTRO’s Delhi headquarters after red-flagging large-scale irregularities in sensitive appointments made by the organisation brass.

The NTRO has been courting bad publicity following an as yet-unreleased report by the comptroller and auditor general (CAG), criticising the organisation for alleged irregularities in the purchase of UAVs (unmanned aerial vehicles).

The organisation, set up after the Kargil war to spruce up technical intelligence, reports to the National Security Adviser who is answerable directly to Prime Minister Manmohan Singh. The PMO has sought the NTRO’s response on the CAG report.
In January, about a month before he was moved to Bangalore, Sharma wrote to NSA Shiv Shankar Menon accusing senior adviser P. V. Kumar of aiding irregularities in the appointment of external pilots and scientists, among other posts. Recently, Kumar was elevated as the NTRO head.

The PMO had forwarded Sharma’s complaint for appropriate action to Kumar, then acting chairman of the NTRO. As nothing seemed to have come of it, the PMO sent a reminder on March 30 and asked for an action taken report.

India today2The PMO also constituted a single-member inquiry panel under Kumar to look into the complaints of irregular appointments. Strangely, the complaints were marked to Kumar despite the fact that the supervisory role of the NTRO chairman was not above board.

A detailed questionnaire was faxed to the NTRO chairman more than a week back, seeking his response on the serious charges against him and allegations of corruption in the premier organisation. However, Kumar refused to file a reply despite several reminders.

Sharma had alleged in his letter to the NSA that Kumar had attempted to water down the true findings of his inquiry panel. Sharma could not be reached for comments despite making several calls to Bangalore.

Sharma, who was holding the charge of additional controller (administration) in the NTRO, stated in his fivepage complaint that he had tried to apprise Kumar of the appointments violating all government norms and corruption in the organisation.

“A lot of pressure was mounted on me to change my notes but, as a dutiful officer of central government posted in a very sensitive organisation, I did not succumb to any such pressure,” he wrote.

The letter quotes several instances to give a glimpse of what is wrong in the NTRO. A group captain (retired) posted at the Dehradun aviation base was shielded despite complaints of corruption pending against him. As a cover-up exercise, the NTRO ordered an inquiry against him. But its establishment division suggested the probe report not be accepted as it did not follow government regulations. Once the objections were raised on the official file, it was never returned to the establishment division, Sharma alleged.

Two officers were employed on a contract basis in the organisation at the joint secretary-level. The NTRO, overlooking the PMO’s directive putting a cap on employment at 65 years’ age, wanted to extend their services. The NTRO suggested the two could be appointed at ‘job contract basis’, which too was illegal.

The CAG report is also believed to have taken note of the irregularities. But it is suspected the government is not willing to make the report public as it would open up a can of worms which would be difficult for the PMO to defend.

Sh Avinash Chander – थाली का बैंगन – Modi ji How can our country trust such person who has no meaning of honesty.

Sh A K Antony gave responsibility to find out the truth of appointment of Ms Swati Srivastava as scientist ‘B’ post by RAC.

The nation is witnessed that same person first gave clean chit under influence of corrupt officials of DRDO and now he has approved the order of annulment  the appointment of Ms Swati Srivastava. Unfortunately, the country of 125 crores population, our government is not able to found any honest and responsible person for secretary, DRD, DG, DRDO and SA to RM post.

They are still shielding concern duo (Father Daughter) and other involved officials by terming the illegal recruitment of Ms Swati Srivasta as irregular appointment with the clear motive of department escape from the duty of lodging of criminal case against the manipulation done under the influence of Dr Arun Kumar in the direct recruitment of Ms Swati Srivastava in RAC Delhi

Hope Modi ji will look seriously this very important issue it is directly related to moral of our honest scientist whose fortune / fate is in hand of such man who has no respect of moral and honesty who only believes in his own growth.

Jaihind

Central Administrative Tribunal – Delhi

Dr. Arun Kumar vs Union of India on 24 November, 2012

Principal Bench, New Delhi

OA No. 3293/2012

Reserved on    : 09.11.2012 Pronounced on   : 24.11.2012

Ho’ ble Mr. Justice Syed Rafat Alam, Chairman, Hon’ble Dr. Ramesh Chandra Panda, Member (A)

Para 9

Seen. This is serious. As already ordered, a fresh inquiry into the allegations of irregularity by an independent agency against Dr. Arun Kumar, the then Director, RAC may be got conducted immediately. It may also be inquired as to how my note sheet containing specific orders to this effect is missing from the file.

/sd/
(A.K. Antony)
Raksha Mantri
11th March, 2011

Para 10.          Pursuant to the above directions, a High Power Inquiry Committee was constituted to inquire into the allegations of irregularities against the applicant with the approval of RM vide his order dated 15.07.2011 with following Members:

(i) Dr. S. K. Salwan, former Director, ARDE, Pune and Vice Chancellor, Bhagwant University, Ajmer;

(ii) Dr. Avinash Chander, Distinguished Scientist and Director, ASL, Hyderabad;  

(iii) Mrs. Nabnit R. Krishnan, Director DMIST.         

The Enquiry Committee enquired into the matter and submitted its report on 08.06.2012. The executive summary of the report was placed before RM indicating that the Inquiry Committee opined that no favour or undue advantage was given to Ms. Swati Srivastava, daughter of the applicant during her recruitment as Scientist ‘B’ in DRDO and the same was conducted following normal practices and procedures. The file was processed through SA to RM who recorded the following on 15.07.2011:

“The report of the Independent Enquiry Committee”. Constituted to investigate the appointment of Mr. Swati Shrivastava D/o of Dr. Arun Kumar, is placed opposite for perusal of Hon’ble RM.

The above recording was endorsed by the RM by signing on 18.07.2011.

The copy of DRDO order of annul of appointment of Ms Swati Srivastava, Scientist C, daughter of Dr Arun Kumar, Ex-DOP. The Order is signed by Dr A K Singh, DOP (another gem of DRDO)swati srivastava  annuling order page 1swati srivastava  annuling order page 2swati srivastava  annuling order page 3swati srivastava  annuling order page 4

RTI – Cabinet- Shri Avinash Chander’s service extension

To                                                                                                   Date 30th October 2014
Shri Rajesh Nagpal,
Under Secretary, 
Central Public Information Officer,
ACC Cell, Cabinet Secretariat,
Sardar Patel Bhawan,
New Delhi – 110004

 

Hello,

Kindly provide me with the following information requested under the purview of the Right to Information (RTI) Act, 2005 in respect of DOPT OM No.  No. 26012/6/2002-Estt. (A) dated 9th December, 2002, No. 26012/8/2011-Estt. (A) dated 16th May, 2011, 26012/15/2010-Estt(A-IV) dated 4th May 2011 [DPRC] , 26012/15/2010-Estt(A-IV) dated 4th May 2011 [Screening Committee]and F.No.22/35/2011-E0 (SM.II) dated 24/26 September, 2014.

Shri Avinash Chander , Distinguished Scientist ,DRDO , Min. of Defence was given extension beyond after his superannuation from age of 62 -64 years with effect from 01 Dec 2012 to 30 Nov 2014 by approval of DPRC of DRDO, Screening Committee headed by Cabinet Secretary and Appointments Committee of the Cabinet.

Under the provisions of FR 56(d) the scientist considered for extension from age of 62-64 years should have “International Stature“. Copy of DOPT OM dt 16 May 2011 is enclosed.

  1. Provide copy of Minute Sheet & File Noting for extension in service of Shri Avinash Chander, for age of 62-64 years by the Appointments Committee of the Cabinet.
  2. The copy of bio-data of Shri Avinash Chander in prescribed Performa submitted to DPRC, Screening Committee and ACC.(Proforma for sending proposals for approval of Department of Personnel & Training for grant of extension to Government servants beyond the age of superannuation)
  3. The attributes, achievements and documentary evidenceson record of Shri Avinash Chander based on which DPRC, Screening Committee & ACC considered Shri Avinash Chander a Scientist with “International Stature” and approved his extension.
  4. The DPRCs justification for such extension based on merits of the case, the international stature of the person recommended and also indicate whether thiswill block promotion opportunities of others in the Department.
Regards
Prabhu  Dandriyal
21-Sunderwala, Raipur, Dehradun
Ph   0135 2787750, Mobile 9411114879,
e-mail id prabhudoon@gmail.com  website   www.corruptionindrdo.com

Registration Number           CABST/R/2014/60418

Scraps the promotions for Scientist ‘F’ to Scientist ‘G’ in DRDO year 2011

To
Hon’ble
Shri Narendra Modi
Prime Minister of India
PMO, South Block
New Delhi-110011

  Subject: Scraps the promotions for Scientist ‘F’ to Scientist ‘G’ in DRDO year 2011

Hon’ble Sir,

  1. Defence Research & Development Organisation (DRDO) is an organisation under MOD having annual budget of Rs. 15000 crore for FY 2014-2015. This organisation is having about 7500 scientists under DRDS cadre who are comprising of more than 50 scientific disciplines and working in their respective area based on his qualification and discipline.
  2. Prior to the formation of the Recruitment & Assessment Centre(RAC) in DRDO the  recruitments and promotions of scientists in DRDO were made by UPSC. Later on Government of India allowed DRDO to have its own recruitment & assessment body for recruitment and assessment of scientists under DRDS cadre. Consequently an in-house Recruitment & Assessment Centre (RAC) was created in DRDO in 90’s. RAC  conducts recruitment of scientists in DRDO and assessment of scientists for promotion from the grade of Scientist ‘B’ to Scientist ‘H’.
  3. All scientists of DRDO comes under the Defence Research & Development Services(DRDS) cadre and under the provisions of Article 309 of Constitution of India, Government of India framed The Defence Research & Development Service Rules 1979 (DRDS Rules 1979) as Recruitment & Promotion Rules for DRDS cadre.
  4. DOPT, GOI framed Flexible Complementing Scheme (FCS) for faster promotions of scientists working in all S&T Department/Organisations under Central Government. Consequently from past 35 years DOPT issued various OM & Notifications for FCS from IIIrd CPC to VIth CPC.
  5. The OM No. 2/41/97-PICdated 9th Nov 1998  and OM No. AB-1401713712008-Estt(RR)dated 10th September, 2010issued by DOPT are umbrella notifications for FCS.
  6. Vide SRO  11(E) dated 10th August 1990, FCS was introduced in DRDS Rules 1979 and under the provisions of Rule 8(2)(a) of DRDS Rules 1979 it clearly mentioned that promotions from the rank Scientist ‘B’ to Scientist ‘H’ (Outstanding Scientist) are covered under the FCS. Copy of the Rule 8(2)(a) is annexed as Annexure-1.
  7. In DRDO scientists are recruited based on the requirement of various Lab/Estt which were sent to RAC through DRDO HQ and then RAC recruits the scientists based on their discipline, qualifications, experience and other requirement as sought by Labs/Estt of DRDO.
  8. Under the provisions of OM No.AB-1401713712008-Estt(RR)  dated 10th September, 2010of DOPT the promotions under FCS are applicable to the scientist who are working in S&T organisation/department and involved in Scientific &Technological  work. Scientists/ Technical experts doing management/ administrative work in the Ministries should not be considered for up gradation under FCS, they should only be given benefit of up gradation under MACP. Copy of page no. 06 of the OM annexed as Annexure-2.
  9. Procedure of promotion from grade of Scientist ‘F’ to Scientist ‘G’ till 2010 were followed as provided under Rule 8(2)(a) of DRDS Rules 1979 and the same procedure supposed to be followed  in 2011 for promotions from grade of Scientist ‘F’ to Scientist ‘G’but the RAC, DRDO  adopted the new procedure illegally without amending the DRDS Rules 1979 by issuing SRO under the provisions of Article 309 of the Constitution.
  10. DRDS Rules 1979 clearly stipulates that  DRDS Rules can be amended only by issuing an SRO under Article 309 of the Constitution of India. DRDO violated the Article 309 by implementing interview/interaction in promotion of scientist ‘F’ to scientist ‘G’ grade in 2011 without proper amendment in SRO.
  11. In this matter Dr. A.K. Singh, Scientist ‘G’ (then Director, DHRD) issued letter No. DHRD/76145/C/M/01 dated 21 March 2011 on the Subject ” Assessment of Sc ‘F’ for promotion- revised procedure of” to Director, RAC. Copy of the letter dated 21 March 2011 is annexed as Annexure-3.
  12. Dr. A.K. Singh issued the said letter illegally  without issuing of any SRO in the subject matter as in the year 2011 Dr. A.K. Singh himself was appearing in assessment as candidate for promotion from  grade of Scientist ‘F’ to Scientist ‘G’ and wanted to be get benefitted by the said new procedure for assessment.
  13. Based upon the letter of Dr. A.K. Singh dated 21 March 2011, Dr. P.S. Goel, then Chairman, RAC issued his DO letter No. RAC/01/Assessment/PSG, dated 22 March 2011 regarding “Promotions for grade of Scientist ‘F’ to Scientist ‘G”. Copy of the letter dated 22 March 2011 is annexed as Annexure-4.[How quickly the letter by Dr. P.S. Goel was issued on 22 March 2011, this establish planned conspiracy]
  14. Dr. P. S. Goel and Dr. A.K. Singh planned whole conspiracy of the said illegal assessment in the year 2011 in DRDO with help of then Dr. V.K. Saraswat then DGR&D, DRDO.
  15. Dr. P.S. Goel introduced this illegal mechanism to give favour to few incompetent DRDO scientists and for this act in return he got Prof. MGKMenon Chair, RCI, Hyderabad which fed him 84 lakhs per year. It is pure kick back or DRDO should provethe justification of his appointment. Dr. A.K. Singh himself promoted in the year 2011 by misusing this illegal mechanism for assessment in the year 2011.
  16. There was noassessment interview requirement for promotion from scientist ‘F’ to  scientist ‘G’ as per the DRDO service rule-1979-Rule-8(2)(e) till 2011 , but Chairman, Recruitment and Assessment Centre (RAC) of DRDO forwarded name before promotion committee after “ INTERACTION ’’ .
  17. The SRO No. 21 for the amending DRDS Rules 1979 was published in official gazette of Government of India on 23 March 2012. Copy of the SRO 21 dated 23 March 2012 is annexed as Annexure-5.
  18. The list of Scientist ‘F’ that were illegally promoted to  Scientist ‘G’in the year 2011 is annexed asAnnexure-6.
  19. Sir , all these promotion from grade of scientist ‘F’ to  scientist ‘G’ in the year 2011 were illegal and liable to be scrapped as it amounts corruption , nepotism and misuse of power for personal gain by Dr. A.K. Singh being Director, DHRD who issued illegal letter dated 21 March 2011.Therefore promotion of Dr. A.K. Singh, Scientist ‘G’ , Director of Personnel should be quashed/scrapped and through investigation in the matter may be ordered to give justice to the all affected Scientist ‘F’ of DRDO and fix the accountability of the corrupt culprits in the matter.

Regards PrabhuDandriyal, 21-Sunderwala, Raipur, Dehradun -248008 0135- 2787750, 9411114879, prabhudoon@gmail.com www.corruptionindrdo.com ANNEXURES-

  1. Copy of the Rule 8(2)(a) , DRDS Rules 1979
  2. Page no. 6 of OM No. AB-1401713712008-Estt(RR)  dated 10th September, 2010
  3. Copy of the letter dated 21 March 2011 issued by Director, DHRD, DRDO
  4. Copy of the letter dated 22 March 2011 issued by Chairman, RAC, DRDO
  5. Copy of the SRO 21 dated 23 March 2012.
  6. The list of Scientist ‘F’ that were illegally promoted to Scientist ‘G’ in the  2011

Shri Avinash Chander, SA to RM, DG DRDO, Secretary (DRD) patronizing organized corruption in procurement by Dr. A. K. Saxena, Director, DMSRDE, DRDO, Kanpur

To                                                                                            13thSeptember 2014
Hon’ble
Shri Narendra Modi Ji,
Prime Minister of India,
Room No -152, PMO, South Block,
New Delhi-110011

Subject:Shri Avinash Chander SA to RM , DG DRDO, Secretary (DRD)patronizing organized corruption in procurement by Dr. A. K. Saxena, Director, DMSRDE, DRDO, Kanpur.

Sir,

With reference to above I would like to submit following facts for your mission of corruption free India.

  1. DMSRDE, DRDO, Kanpur is involved in R&D of polycarbosilane (PCS) since more than 15 years. This material is used for high temperature applications etc.
  2. Polydimethylsilane (PDMS) in form of brisk white powder is used as precursor material required for synthesis of polycarbosilane. Initially the PDMS was manufactured in small scale (quantity)in DMSRDE itself by Scientists of DMSRDE.
  3. The development process of polycarbosilane from Polydimethylsilane (PDMS) was patented by DRDO vide Indian Patent No. 249015 against Indian Patent Application No. 2254/DEL/2004 and the patent was granted on 21 Sept 2011 and published on 30 Sept 2011.
  4. The manufacturing technology of PDMS and polycarbosilane is having only with few countries in world.
  5. When Dr. A. K. Saxena took charge as Director, DMSRDE in January, 2011, he started the procurementof Polydimethylsilane (PDMS) and till date in the period 01.01.2011 to 31.12.2013 he procured 227 Kg PDMS costing around Rs. 1,86,35,780.00 in DMSRDE. PDMS was purchased in DMSRDE @ Rs. 80,000/- per kg approximately.
  6. Procurement was done through 8 demands of limited tender, repeat order and one last order through open tender. The strange fact is that all seven orders of this rare material was placed to M/s Mangalam Traders, Kanpur and the eighth supply order was placed to M/s Paawani Speciality Chemicals, Kanpur which is again the family firm of M/s Mangalam Traders, Kanpur.
  7. As per DMSRDE’s inputs the PDMS material was prepared by ex-DMSRDE employee Shri I. P. Pal, Ex Technical Officer ‘C’ under guidance of Dr. A. K. Saxena under roof of M/s Mangalam Traders, Kanpur of which proprietor is   Mr. Manish Gupta and Director is his brother Mr. Anish Gupta.
  8. The Cost and quantity was so designed and architect as every time the order should not exceed in the tune of Rs. 50 Lakhs so it will always come under sanction power of Dr. A. K. Saxena, Director, DMSRDE, Kanpur.
  9. The Prices of PDMS First Order 4/2/2011 cost @ Rs 45000.00/Kg Second Order 27/4/2012 cost @ Rs 70000.00/Kg, Third Order 4/04/2012 cost @ Rs 75000.00/Kg, fourth order 9/02/2012 cost @ Rs 75200.00/Kg, Fifth order 6/09/2012 cost @ Rs 80000.00/Kg, sixth Order 26/02/2013 cost @ Rs 80000.00/Kg, Seventh Order 06/11/2012 cost @ Rs 77800.00/Kg, Eighth 17/12 2013 Order 06/11/2012 cost @ Rs 77800.00/Kg.
  10. The whole exercise of procurement of PDMS itself exposes the corruption and corrupt practices prevailing in DRDO.
  11. The various documentary evidences already exposed the nexus between Dr. A. K.  Saxena and owners of M/s Mangalam Traders and M/s Paawani Speciality Chemicals Shri Manish Gupta and Shri Anish Gupta.
  12. I have filed a complaint to CVC dated 11 June 2014 regarding corruption in PDMS procurements in DMSRDE and DRDO HQ made 1stFact Finding Committee than after few months’ days DRDO HQ made 2nd Fact Finding Committee. Till date no action taken against Dr. A. K. Saxena by Shri Avinash Chander, DGR&D, DRDO and Scientific Advisor to Raksha Mantri, DRDO Bhawan, New Delhi.
  13. Now it seems Dr. A. K. Saxena convinced or taken care of motivation of Shri Avinash Chander and seems he inspired your 15th August 2014 address that “mera kya” and boldly raised open tender vide DMSRDE/15552004 dated 1st September 2014 for procuring 60 Kg PDMS.
  14. As per sources the Gupta Bandhu of M/s Mangalam Traders and M/s Paawani Speciality Chemicals, Kanpur  arranged 90 Kg PDMS and as usual the case initiated within the sanction capacity of Director i.e. 50 Lakhs of 60 kg. It is understood that the supply order will go in favour of Gupta Bandhu in any cost. Rest 30 kg PDMS will be procured under repeat order of the order issued against this open tender of PDMS.
  15. It is completely established corruption case and enclosed procurement details clearly show the modus oprendi of Dr. A. K. Saxena, Director, DMSRDE. The said open tender dated 01 Sept 2014 should immediately be cancelled till finalization of inquiry by CVC.

Sir, It is requested that for sake of poor tax payers money to take appropriate exemplary action  so that Shri Avinash Chander not dare to patronize such corrupt scientists and whole DRDO fraternity could understand  your commitment against corruption.

Regards
 
Prabhu  Dandriyal,
21-Sunderwala, Raipur, Dehradun -248008 
0135- 2787750,   9411114879,  
prabhudoon@gmail.com    www.corruptionindrdo.com

Polydimethylsilane PDMS open tender dated 01 Sept 2014, DMSRDE, Kanpur
Polydimethylsilane PDMS open tender dated 01 Sept 2014, DMSRDE, Kanpur