Tag Archives: IACCS project

BEL Senior Officers Conversations Regarding Corruption in Prestigious Air Force IACCS Project

www.corruptionindrdo.com,  however, cannot independently verify the authenticity of audio. Received from anonymous source. 

www.corruptionindrdo.com  has forwarded government agencies for further investigation.

Here is a conversation between Mr. D.K. Chatterjee and Mr. M.M. Pandey wherein Mr. Pandey is exposing the BEL corruption Modus Operandi  observed in ordering of civil contracts in IACCS.  

Mr. D.K. Chatterjee an IIT Kanpur Graduate of 1983 batch had worked in many indigenously developed products related to communications and radars. He is presently in the R&D group in-charge of the Radar Data processing. He is an engineer of par excellence in his field and through his in-house research and development he has saved a huge amount of foreign exchange for the country.

He has been targeted by the BEL management and his career has been stalled since he does not fit into the BEL model of going for foreign ToTs and with big corporate / private vendors to provide the defence forces equipment at very high cost and ensure kickbacks leading to corruption where persons at highest level BEL are involved. In the IACCS project the biggest challenge was to integrate the legacy Radars of Indian Air force and Army with the IACCS system since the output protocol of these old Radars was not compatible with input requirement for IACCS system.

Mr. D.K. Chatterjee and Mr. M.M. Pandey wherein Mr. Pandey is discussing the discrepancies which have been observed in ordering of civil contracts in IACCS. In turn Mr. Chatterjee tells about his experience wherein as a part of IACCS project he had worked on creating the interface (Radar Data Processing hardware and software) between the old legacy Radars and IACCS system. He was forced to use hardware which were pre-defined and at a very high cost.

As per him even with the high cost of hardware (since the software was written in-house) the cost of one system came to just about Rs 25 lacs. After the systems were proven he was unceremoniously removed from the project and the systems were subsequently outsourced and bought at a huge cost of about Rs 2.5 Crores each. With so many legacy Radars which were integrated to the IACCS the amount of money which has been misappropriated by the top management of BEL would run into hundreds of Crores.

This is again a case where an intelligent IIT graduate Electronics Engineer who did not compromise on corruption and worked for giving the Defence Forces the best at the least cost was harassed and removed from the main stream and made to suffer in his career. This is again in line with what has been brought out in the case of ordering of DDS software where a software worth not more than Rs 20 Crores was being bought at Rs 320 Crores and when one of the Managers in R&D became a whistle blower to stop this from happening he was harassed and bullied to the extent that he was forced to resign.

The Vigilance report which brought out this corruption had also noted that all the original team which worked on software related to IACCS (first phase wherein five nodes were established by BEL) was dismantled and engineers were either transferred out of the Unit or outside the project. Hence the modus operandi is the same in BEL for all persons who stand against corruption. They are harassed, side tracked, given punishment postings or suspended and terminated.   

It can be understood that if one or two persons are targeted but in the project IACCS it is clearly brought out at various stages that persons have been targeted whenever they have spoken about the rampart corruption which is being monitored by the highest level of management in BEL.

If proper investigation is carried out by external government agencies it will clearly come out that in this project from the beginning itself at all stages and in all systems (software, hardware, civil contracts, sub-systems for hardened underground buildings) organized and planned corruption has taken place through a mafia (which may be external to BEL) and with full support from persons sitting at the highest level of BEL.

Some of the conversations of Mr. D.K. Chatterjee are as follows:

• I have talked to Shri Ajay Singh who is involved in the civil works of IACCS. He has also said that there are lots of discrepancies in the civil contracts.

• I was part of IACCS group who interacted with Air Force persons during the initial phase of the project. I was working in Radar Data Processing (RDP) and when we were interfacing with Air Force personnel they also told us that there was something very wrong going on in the project.

• The amount of corruption which is there in the project it does not look that CMD would have any control. If the loot is of the order of Rs 1000 to 2000 Crores, I think a very small part of it would have gone to BEL persons. Persons facilitating this loot in BEL would just get few foreign trips and perhaps some GM promotions. The very fact that Air Force has given BEL the job of civil construction on underground buildings is itself questionable since DRDO already had expertise in this and Air Force could have done this job ( directly through some private vendor) with DRDO help (this shows that the plan was to do all the corruption by just front ending BEL).

• I have also been a part of IACCS project from the very beginning (although I was looking after a very small portion related to RDP) but I also found something strange happening in the project. When I was doing the RDP I was asked by Mr. Anil Pant (the AGM in-charge of IACCS who was indicted by the Vigilance report dated 16th Nov’16 for manipulations in the ordering of DDS software but was subsequently promoted as General Manager) to choose the hardware from a particular vendor (on a single tender basis and at a very high cost from what was available in the market). As per Mr. Pant it was customers requirement to go with a particular vendor (how can customer dictate the vendor).

• Even taking the hardware at a higher cost I was able to make the system in-house at a cost of Rs 25 lacs. The same system they were getting from vendors at almost Rs 2.5 Crores (ten times the in-house cost).

• Although I was doing a very small part of the project the attitude which was there in the

overall project got reflected in this also (as in overall IACCS project they have been going for single tenders for ordering on pre-fixed vendors at much higher costs than available in the market).

• Everyone looked at me as if I have done a very big mistake by developing the system inhouse (maybe because I came on the way of persons making money out of outsourcing the same to pre-fixed vendors). Everyone (including the end user) tried to dissuade me from taking up the in-house development by telling me that the system is required urgently within six months thinking that I will raise my hands due to the impossible time lines set for me for development. Everyone was saying that RDP cannot be made in-house but like a fool I accepted the challenge and when I successfully demonstrated it, I was unceremoniously thrown out of the project.

• It is quite obvious that there is some serious misappropriation going on in the project at the highest level.

It is obvious that since after developing the system at a cost of Rs 25 lacs Mr. D.K. Chatterjee was thrown out of the project the required systems would have been bought at inflated cost (almost ten times) from pre-fixed vendors. This has been the modus operandi in the IACCS project wherein persons who had originally been part of the project and were instrumental in development of software and selection of hardware were unceremoniously removed from the project and a bunch of persons who had nothing to do with the project were placed at the positions where they manipulated the ordering in connivance with the persons at the highest level at BEL for personal gains.

Appeal to Independent Directors of BEL on Rs 7900 Cr Scam in IACCS Project

To

Dr. Bhaskar Ramamurthi, Director at IIT, Chennai,
Dr. R K Shevgaonkar, Professor at IIT, Mumbai,
Mrs. Usha Mathur, ex-Secretary to Govt. of India,
Mr. Sharad Sanghi, Entrepreneur,
Shri Mukka Harish Babu, Practicing Chartered Accountant,
Shri Surendra Singh Sirohi, ex-Secretary to Govt. Of India,
Shri Vijay S Madan, ex-Secretary to Govt. Of India,
Dr. Amit Sahai, Joint Secretary (P&C), Ministry of Defence, Department of Defence Production,
Ms J Manjula, Distinguished Scientist & Director General-Electronics & Communication Systems, DRDO,

ushamathur@hotmail.com,
harish@harishassociates.com,
bhaskar@iitm.ac.in,
vc@bennett.edu.in,
secretarial@hfcl.com,
sdpns@nic.in

MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

In an unprecedented move the defence public sector undertaking Bharat Electronics Limited (BEL) has suspended three senior officials, who unearthed massive irregularities in the Indian Air Force’s confidential IACCS project- underground bunkers- at 10 strategic locations. The three officials were part of Inquiry committee set up by the BEL’s Chief Vigilance officer (CVO) in July 2018 . The team exposing the role of high ranking officers and manipulation of awards of contracts in Rs.8000 Crore project had submitted the report in October 2018. Instead of taking action against the corrupt officers, BEL management led by its Chairman MV Gowtama, who himself is under the scanner in IACCS project, acted with vengeance and suspended the investigation team members.

It is pertinent to mention that after three-member probe committee submitted the report, BEL CVO , a senior IAS officer MR S.SHIVA KUMAR  1987 BATCH in his note dated 29 March 2019 exposed the deep-rooted corruption recommending strong action against erring officers and firms. Yet, the CMD , who is likely to be arrested if a probe is ordered, cracked the whip against inquiry committee members for doing honest job. This crackdown is in spite of  the fact that the CVO of the company as appointed by CVC of India had established and validated each point of the investigation report  and strongly recommended to management of BEL for immediate police and civil criminal action against concerned BEL officers and chief consultant of the project M/s RD KONSULTANT.  The role of senior DRDO officers is also under the scanner since it was DRDO which recommended and fully supported the name of RD Konsultant to BEL although it was done informally and BEL surreptitiously avoided DRDO role in the files.The role of DRDO officers was brought out and exposed by the BEL vigilance probe team which was suspended on 17 May 2019.  To distract the government’s IB report, CMD, BEL created suspension drama of three personal of BEL, 2 GM Vigilance and one manager to fooling the country. This shows the clear mockery of BEL management.

M/S RD KONSULTANT – DELHI  , which came out to be a shell company in investigation report , incorporated just 3-4 months before the award of PPR consultancy project with all false  and fabricated documents, and was wrongly  awarded DPR consultancy project also violating BEL own manual procedures as well CVC guidelines with a criminal intent of having control over all future activities of civil contract as well infrastructure/ Plant and machinery  items procurement worth more than Rs 3500 crores, as recorded in noting files  and  many senior management personals of M/S BHARAT ELECTRONICS , which is continuously being done since UPA CONGRESS REGIME 2011.

One very interesting fact of the whole case is that the two BHARAT ELECTRONICS senior management personals named Mr N.K. SHARMA DIRECTOR( MARKETTING) and MR CHANDERPRAKASH EXECUTIVE DIRECTOR (D&E) GAD, who were the chief &key persons for co ordinating the IACCS project getting approved from Indian air force, joined  a company named “OIS ADVANCE TECH” – 90% OWNDED BY MR SANJAY BHANDARI – famous arms dealer & power broker  and close associate of ROBERT WADRA immediately after their retirement from BEL in 2010 and 2011, and immediately after this this project got formally started by BEL . 

The detailed and very exhaustive investigation done by fact verification team in early 2018 and further investigation team in end 2018 and subsequently report by CVO of M/s Bharat Electronics has established the details of  massive corruption and mal practices done by M/S RD Konsultant, its associate/related firms and senior management persons of BEL  ( since 2011 onwards till now), by abusing their powers and violating all BEL manuals as well as documented CVC guidelines for tendering for award of civil project works and procurement of items worth more than 3500 crores.

These civil contract worth more than 1000 crores have been given of paper to reputed firms like M/S L&T but at almost 30 % higher and inflated rates (as also mentioned by then Director (Finance) Mr PRABHAT ACHARYA in file noting about more than 100 crore loss as well as violation of BEL Contract manual conditions as well as CVC guidelines) and after some period he resigned from company. After this project given to m/s L&T are being done by M/S RD consultant sister concern named M/S CS CONSTRUCTIONS at sites ( even MD- Mr Rahul Baucher  of M/S CS Construction used to come to BEL-Ghaziabad unit  for regular review meeting on behalf of L&T) – A serious violation of CVC  guidelines as well contract conditions of BEL & M/S RD KONSUL) , which seriously compromise the quality , as it is a very small petty company which in no way  has a technical capability and skill to deal such highly technical and secured project. This fact as validated by the fact that some sites were shown as collapsed during construction and crores of rupees were further approved by BEL management in name of deviation with fixing the responsibility on contractor.

The detailed design which was submitted by M/s R.D. Konsultants specified vendors for all the sub-systems which are used in the blast proof underground buildings. It is seen that these vendors are the same which they had brought out to be their partners during presented made by then during the Pre-qualification bid. The Order which was placed on BEL by Air Force was also based on the detail design report submitted by M/s R.D. Konsultants and hence all these vendors called in the order from Air Force were the same which were defined by M/s R.D. Konsultants.BEL has in turn placed many orders for the sub-systems based on the vendors defined by M/s R.D. Konsultants. A visit was made to the works of many of these European vendors by a team of engineers from BEL along with Air Force personnel. But is it said that the team was accompanied by a rep from M/s R.D. Konsultant and the visit was coordinated by M/s R. D. Konsultant. These foreign companies were allowed to supply materials on a single tender basis by the BEL chairman MV Gowtama. He in fact overruled his own officials and approved qualification of several firms despite they had failed to submit bid details during prescribed time. Such gross violation was similar to the ones seen during 2G scam. BEL Chairman violated the laid down norms by allowing these foreign firms despite objections duly recorded by the finance division.

All above shows a case of massive corruption, fraud and abuse of power with criminal intent and a huge loss to Government public money by BEL senior management persons in connivance with chief consultant, EX DRDO and some IAF officials. The whole investigation report findings are finally found true of the fact that as it is learnt from top BEL & DRDO sources last week M/s RD Konsultant has written to BEL MANAGEMENT that as his chief designer has left the company and the firm has gone bankrupt, he cannot give consultancy services to this project. Now on this bogus consultancy company’s  design, specifications and whole scheme of the project BEL management has already  spend thousands of crores of public money  and suppose its design does not work then who will own the responsibility of whole scam. Now the news that the firm M/S RD KONSULTANT is running out of project the reason could only be because his fraud has come out in media and BEL current management instead of taking legal action against the corrupt, trying to harass and victimize the honest and brave investigation team members ( in name of media leak- which even our prime minister call  as a strong pillar of democracy) .

The team which is suspended and currently facing all type of harassment, victimization and humiliation of suspension, but in spite of all pressures and threats, have unearthed this scam just to keep the spirit of national security and defence importance   and demand only for justice but calling for a detailed CVC/CBI/ED enquiry outside BEL management preview immediately and immediate intervention of MINISTRY OF DEFENCE for action on some BEL senior management for their misdeeds

A honest and sincere appeal to all  concerned officials of PMO/MOD /CVC/PRESS/JUDITARY that please take immediate action in this regard to keep “CHOWKIDAR “ alive in our souls  by safeguarding the honour of investigation team officials.

ABOVE ALL MATTER IS COVERED IN DETAILS BY  A REPUTED NEWPAPER

“FIRSTPOST”  IN ITS ARTICLE DATED 02 APRIL, 09 APRIL & 26 April 2019

Before publishing in media the matter was available with AF Intelligence, CVO, CBI, North Block, Chairman, DRDO, IB in March itself but god knows why any agency not take-up this matter seriously.

Hope you will take up matter seriously as you are responsible Member, Audit Committee and Director of BEL and may be aware of all developments from side of BEL management who are posing that matter is mare deviation of 50/60 lakhs as a bonafide fighter against defence corruption since more than 20 years I am fully aware of nexus. This nexus was designed by Retired Scientist of DRDO with ex DRDO chief because the U/G work of services was sole right of DRDO via SPIC, but when retirement stage these corrupt DRDO official gang create the scene and diverted this activity to BEL which doesn’t have any type construction division like DRDO have, U/G plant machinery experience either trading nor manufacturing in this tender only 500 cr electronics involvement can BEL claimed. As per investigation and observation it is clearly visualize that few greedy BEL official trapped in vicious DRDO official and for sake of few bucks they compromised with national security as well as their organization’s dignity. Please ask the vigilance report prepared by these three suspended BEL employees, Report is not an eye opener but will help govern to expose UPA era nexus who are responsible to siphon the defence budget under shadow of secrecy.

MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

To.                                                                                           3rd June 2019

Shri Rajnath Singh Ji

104.  South Block

New Delhi – 110011

Dear Sir,

Congratulations for great victory and taking charge of big responsibility of Defence Ministry.

MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

In an unprecedented move the defence public sector undertaking Bharat Electronics Limited (BEL) has suspended three senior officials, who unearthed massive irregularities in the Indian Air Force’s confidential IACCS project- underground bunkers- at 10 strategic locations. The three officials were part of Inquiry committee set up by the BEL’s Chief Vigilance officer (CVO) in July 2018 . The team exposing the role of high ranking officers and manipulation of awards of contracts in Rs.8000 Crore project had submitted the report in October 2018. Instead of taking action against the corrupt officers, BEL management led by its Chairman MV Gowtama, who himself is under the scanner in IACCS project, acted with vengeance and suspended the investigation team members.

It is pertinent to mention that after three-member probe committee submitted the report, BEL CVO , a senior IAS officer MR S.SHIVA KUMAR  1987 BATCH in his note dated 29 March 2019 exposed the deep-rooted corruption recommending strong action against erring officers and firms. Yet, the CMD , who is likely to be arrested if a probe is ordered, cracked the whip against inquiry committee members for doing honest job. This crackdown is in spite of  the fact that the CVO of the company as appointed by CVC of India had established and validated each point of the investigation report  and strongly recommended to management of BEL for immediate police and civil criminal action against concerned BEL officers and chief consultant of the project M/s RD KONSULTANT.  The role of senior DRDO officers is also under the scanner since it was DRDO which recommended and fully supported the name of RD Konsultant to BEL although it was done informally and BEL surreptitiously avoided DRDO role in the files. The role of DRDO officers was brought out and exposed by the BEL vigilance probe team which was suspended on 17 May 2019.  To distract the government’s IB report, CMD, BEL created suspension drama of three personal of BEL, 2 GM Vigilance and one manager to fooling the country. This shows the clear mockery of BEL management.

M/S RD KONSULTANT – DELHI  , which came out to be a shell company in investigation report , incorporated just 3-4 months before the award of PPR consultancy project with all false  and fabricated documents, and was wrongly  awarded DPR consultancy project also violating BEL own manual procedures as well CVC guidelines with a criminal intent of having control over all future activities of civil contract as well infrastructure/ Plant and machinery  items procurement worth more than Rs 3500 crores, as recorded in noting files  and  many senior management personals of M/S BHARAT ELECTRONICS , which is continuously being done since UPA CONGRESS REGIME 2011.

One very interesting fact of the whole case is that the two BHARAT ELECTRONICS senior management personals named Mr N.K. SHARMA DIRECTOR( MARKETTING) and MR CHANDERPRAKASH EXECUTIVE DIRECTOR (D&E) GAD, who were the chief &key persons for co ordinating the IACCS project getting approved from Indian air force, joined  a company named “OIS ADVANCE TECH” – 90% OWNDED BY MR SANJAY BHANDARI – famous arms dealer & power broker  and close associate of ROBERT WADRA immediately after their retirement from BEL in 2010 and 2011, and immediately after this this project got formally started by BEL . 

The detailed and very exhaustive investigation done by fact verification team in early 2018 and further investigation team in end 2018 and subsequently report by CVO of M/s Bharat Electronics has established the details of  massive corruption and mal practices done by M/S RD Konsultant, its associate/related firms and senior management persons of BEL  ( since 2011 onwards till now), by abusing their powers and violating all BEL manuals as well as documented CVC guidelines for tendering for award of civil project works and procurement of items worth more than 3500 crores.

These civil contract worth more than 1000 crores have been given of paper to reputed firms like M/S L&T but at almost 30 % higher and inflated rates (as also mentioned by then Director (Finance) Mr PRABHAT ACHARYA in file noting about more than 100 crore loss as well as violation of BEL Contract manual conditions as well as CVC guidelines) and after some period he resigned from company. After this project given to m/s L&T are being done by M/S RD consultant sister concern named M/S CS CONSTRUCTIONS at sites ( even MD- Mr Rahul Baucher  of M/S CS Construction used to come to BEL-Ghaziabad unit  for regular review meeting on behalf of L&T) – A serious violation of CVC  guidelines as well contract conditions of BEL & M/S RD KONSUL) , which seriously compromise the quality , as it is a very small petty company which in no way  has a technical capability and skill to deal such highly technical and secured project. This fact as validated by the fact that some sites were shown as collapsed during construction and crores of rupees were further approved by BEL management in name of deviation with fixing the responsibility on contractor.

The detailed design which was submitted by M/s R.D. Konsultants specified vendors for all the sub-systems which are used in the blast proof underground buildings. It is seen that these vendors are the same which they had brought out to be their partners during presented made by then during the Pre-qualification bid. The Order which was placed on BEL by Air Force was also based on the detail design report submitted by M/s R.D. Konsultants and hence all these vendors called in the order from Air Force were the same which were defined by M/s R.D. Konsultants.BEL has in turn placed many orders for the sub-systems based on the vendors defined by M/s R.D. Konsultants. A visit was made to the works of many of these European vendors by a team of engineers from BEL along with Air Force personnel. But is it said that the team was accompanied by a rep from M/s R.D. Konsultant and the visit was coordinated by M/s R. D. Konsultant. These foreign companies were allowed to supply materials on a single tender basis by the BEL chairman MV Gowtama. He in fact overruled his own officials and approved qualification of several firms despite they had failed to submit bid details during prescribed time. Such gross violation was similar to the ones seen during 2G scam. BEL Chairman violated the laid down norms by allowing these foreign firms despite objections duly recorded by the finance division.

All above shows a case of massive corruption, fraud and abuse of power with criminal intent and a huge loss to Government public money by BEL senior management persons in connivance with chief consultant, EX DRDO and some IAF officials. The whole investigation report findings are finally found true of the fact that as it is learnt from top BEL & DRDO sources last week M/s RD Konsultant has written to BEL MANAGEMENT that as his chief designer has left the company and now on this bogus consultancy company’s  design, specifications and whole scheme of the project BEL management has already  spend thousands of crores of public money  and suppose its design does not work then who will own the responsibility of whole scam. Now the news that the firm M/S RD KONSULTANT is running out of project the reason could only be because his fraud has come out in media and BEL current management instead of taking legal action against the corrupt, trying to harass and victimize the honest and brave investigation team members ( in name of media leak- which even our prime minister call  as a strong pillar of democracy) .

The team which is suspended and currently facing all type of harassment, victimization and humiliation of suspension, but in spite of all pressures and threats, have unearthed this scam just to keep the spirit of national security and defence importance   and demand only for justice but calling for a detailed CVC/CBI/ED enquiry outside BEL management preview immediately and immediate intervention of MINISTRY OF DEFENCE for action on some BEL senior management for their misdeeds

A honest and sincere appeal to all  concerned officials of PMO/MOD /CVC/PRESS/JUDITARY that please take immediate action in this regard to keep “CHOKIDAR “ alive in our souls  by safeguarding the honour of investigation team officials.

ABOVE ALL MATTER IS COVERED IN DETAILS BY  A REPUTED NEWPAPER

“FIRSTPOST”  IN ITS ARTICLE DATED 02 APRIL, 09 APRIL & 26 April 2019

Before publishing in media the matter was available with AF Intelligence, CVO, CBI, North Block, Chairman, DRDO, IB in March itself but god knows why any agency not take-up this matter seriously.

Hope you will take up matter seriously as you are responsible Chairperson, Audit Committee of BEL and may be aware of all developments from side of BEL management who are posing that matter is mare deviation of 50/60 lakhs as a bonafide fighter against defence corruption since more than 20 years I am fully aware of nexus. This nexus was designed by Retired Scientist of DRDO with ex DRDO chief because the U/G work of services was sole right of DRDO via SPIC, but when retirement stage these corrupt DRDO official gang create the scene and diverted this activity to BEL which doesn’t have any type construction division like DRDO have, U/G plant machinery experience either trading nor manufacturing in this tender only 500 cr electronics involvement can BEL claimed. As per investigation and observation it is clearly visualize that few greedy BEL official trapped in vicious DRDO official and for sake of few bucks they compromised with national security as well as their organization’s dignity. Please ask the vigilance report prepared by these three suspended BEL employees, Report is not an eye opener but will help govern to expose UPA era nexus who are responsible to siphon the defence budget under shadow of secrecy. 

Regards

Prabhu Dandriyal,

21-Sunderwala, Raipur,

Dehradun-248008

Phone – 0135-2787750 | Mobile – 9411114879

Email – prabhudoon@gmail.com | website – www.corruptionindrdo.com

RTI to Air Force Collapse of Slopes IACCS Project Site

To                                                                                            18 June 2019

Wg Cdr Suman Adhikari

CPIO,

Room No. 160, Dte of PS,

Air HQ (VB), Rafi Marg,

New Delhi 110106

Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect  of IACCS project executing by BEL. Costing huge Rs 7900 Cr public money involved in defence strategic preparedness program.

  1. Whether BEL informed to IACCS Directorate that BEL Corporate Vigilance had received an email complaint: dated 31st August 2017 Vigilance from Shri  Manish Aggarwal, Advocate. Supreme Court of India regarding scam in NCS unit of BEL. Ghaziabad in the 10 construction sites projects allotted for defence. Yes or No
  2. If yes, then provide the date of receiving such communication from BEL on above said matter..
  3. Whether BEL informed to IACCS Directorate that BEL received   complaint mails and letter from IACCS site regarding compromising in quality procedures like one such mail sent by an engineer on dated  2018-03-28 13:21 to Mr Solomon Paul Raj, Mgs (CO-VIG) Yes or No
  4. As per enclose email – Also MECON reply to BEL (9 pages) after collapse of slopes may be referred for a wider view of the project. Provide that Whether IACCS Directorate, Air force received any communication from BEL in respect of  above mention collapse of slopes in construction sites yes or no
  5. If yes than provide that any inquiry committee constituted by Air force on misshape of IACCS project. Yes or No

Regards

Prabhu  Dandriyal,
21-Sunderwala, Raipur, Dehradun -248008 M- 9411114879, e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

  Enclosed the copy of email complaint

 Registration Number    MODEF/R/2019/51879

Suject6: Re. Relation to your complaint

From: <…………………………….>

To           <solomonpaulraj@bel.co.in>

Cc           rajasekaranan> rajasekaranan@bel.co.in>

Date      2018-03-28 13:21

Dear Sir,

  1. It may please be noted  the following information being shared with you is highly confidential and unofficial.  For my official version you can officially request my higher management (for permission) for my statement as ex-site in-charge   of PMC only and not as complainant. I am sharing these  information because I find higher official of BEL impose lot of unethical verbal instruction on juniors unethically which  is damaging for a PSU.
  2. I was posted as site In-charge of MECON (PMC) and tried my best to act as whistleblower being a part of a project of national importance. I had issued innumerable mails and letter regarding quality issues of the project. But the engineer In-charge (AGM) and other higher officials (GM) from BEL desisted me verbally at Ghaziabad and at site not to follow quality procedures strictly on the pretext of progress of the project. They actually always blindly favoured the contractor anywhere and everywhere.  
  3. However, when we did not allow any relaxation in this regard and made deduction in bills wherever quality procedures were not followed, higher officials of BEL at Ghaziabad were not satisfied with XXXXX site in-charge (both of BEL& MECON] for not favouring the contractor and for following  rule-book strictly. For that reason BEL GM&AGM transferred their own site incharge (Shri Ravi Kumar) and pressurized MECON to transfer Shri MK Haldar (Sr Mgr) of MECON in Sep 17 on the pretext that they did not perform satisfactorily, whereas actually it was just opposite. This was to instill a sense of fear so that other engineers fall in line.
  4. BEL Vigilance took up the issue due to some complaint from other sources and Shri MM Roy {name not sure) of BEL Vigilance and team were to visit Salua site. BEL Ghaziabad became very Jittery on the news because I was the only engineer from BEUMECON at site who was there since inception of the project and was a whistleblower. They in connivance with the influential contractor again pressurized MECON management to remove me from site immediately and my transfer order was issued within 2 hrs on 15.03.18 with the release date of 19.03.13 so that I can be out of station before 23.03.18 after availing maximum 2 days joining leave.
  5. Also it was intriguing and surprising, that the BEL vigilance team (all P5U employees with Police verification done) were not allowed at xxxx site by the Air force and this is first of such instance of refusal entry. Based on BEL site In-charge letter  (all record available) even officials of unknown/roadside private firms were always allowed on producing of any govt. issued identify card (all record available with BEL site In-charge)
  6. For all the aforesaid letters and emails (documentary evidences) you can approach file kept at MECON site office. Also MECON reply to BEL [9 pages] after collapse of slopes may be referred for a wider view of the project.
  7.  There is no direct evidence of corruption.

With Best Regards.

XXXXX

Ex DGM Bi Site in-charge, MECON Ltd, Salua

 2018-03-2? 17:10 GMT+0S:30 < solomonpaulraj@bel.co.in

Dear Sir,

RTI to Indian Airforce on IACCS Scam

To                                                                                            11 June 2019

Wg Cdr Suman Adhikari.

CPIO.

Room No. 160, Dte of PS,

Air HQ (VB), Rafi Marg,

New Delhi 110106

Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect  of CVO, BEL Mr. S. Shiva Kumar letter No:21328/ 399&426/ BEL/GAD/18-19 Dated:29 March 2019 subject Detailed Enquiry done on the allegations of Irregularities Gross violations in the appointment of Design Consultants and in the execution of IACCS project.

  1. Whether IACCS Directorate, Air force received any communication from BEL that CVO BEL is investigating on the allegations of Irregularities Gross violations in. execution of IACCS project, Yes or No
  2. If yes, then provide the date of receiving such communication from BEL on above said matter..
  3. Whether IACCS Directorate, Air force informed about vigilance inquiry on IACCS project to their respective staff. Yes or No
  4. As BEL vigilance investigation team mentioned in its report no Nil dated 20.03.2018 that Air force staff not cooperated in investigation, as they tried to restricted entry and not provided CCTV footage and other record in behalf of corrupt BEL officials working on site. Please provide whether IACCS Directorate, Air force received BEL vigilance report of 20.03.2018.
  5. Provide that Whether IACCS Directorate, Air force received any communication from BEL in respect of non cooperation of Air force staff of IACCS project.
  6. It is observed by investigation team and they collected records of evidences that in some IACCS project sites Air force staff provided unauthorized entries like M/s C S Constructions Pvt Ltd, Delhi personals. The firm has no official role in IACCS project. Any communication from BEL or any other agencies Yes or No
  7. Provide if the IACCS Directorate, Air force received any information that key company M/s R D Konsultants who was responsible for PPR/DPR and consultant for all design aspect of IACCS project declared bankruptcy or disassociated from IACCS project from BEL. Yes or No
  8. If yes, then provide the step taken by IACCS Directorate to ensure to protect the national security compromise in respect of project.
  9. Provide that any inquiry committee constituted by Air force on misshape of IACCS project. Yes or No

 

Regards

Prabhu  Dandriyal,
21-Sunderwala, Raipur,

Phone 0135- 2787750, Mobile- 9411114879,
e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Registration Number         MODEF/R/2019/51797

 

RTI to Department of Defence Production on Scam in AICCS Project by BEL

To                                                                                      10 June 2019

Shri Manmohan,

Under Secretary, (BEL),

Room No. 253-A,B-Wing, Sena Bhawan,

New Delhi-110 011

Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect  of news series published in First Post Apr 02, 2019 -Bharat Electronics in the dock for  compromising  confidential IAF project, favoring one vendor, BEL s internal inquiry report reveals. In response of enclosed RTI from BEL CMD confirmed that CVO, BEL investigated and prepared a report on IACCS project for irregularity and compromising in IACCS project. According to BEL, CMD received the investigation report on 02.04.2019 and on 21.05.2019 submitted his observation on recommendations of CVO, BEL.

  1. Whether CMD, BEL send such observation on recommendations of CVO, BEL to Ministry of Defence Production on IACCS Project.  Yes or No
  2. If yes, then date of receiving said CMD, BEL letter.
  3. Provide the certified copy of CVO, BEL, recommendations which enclosed by CMD, BEL (actual CVO recommendations matter is enclosed as PDF)
  4. Current status of the report, action taken till date by competent authorities.
  5. Provide the measures taken by competent authorities for protect the national security informations existing with M/s RD Konsultants and his associate related to AICCS project.
  6. Provide the action taken steps till date on M/s RD Konsultants the fraudulent transactions with M/s BEL as recommended by CVO, BEL.
  7. Provide the action taken steps till date on the committee members for violating company’s procedures & CVC guidelines and facilitated the selection of M/s RD Konsultants during evaluation of prequalification, without scrutinizing the submission of works experience, site visits and clearing the fake turn over documents of M/s RD Konsultants.
  8. Provide the action taken steps till date on Shri. Dibyendu Bidyanta, AGM(HR&A) and Shri. B.K. Pant, DGM (HR&A) who are involved and responsible for overlooked the criteria in Mr Manish Goyal appointment
  9. Provide the action taken steps till date on Mr Manish Goyal as CVO recommended suspension till departmental fair proceeding
  10.  Provide the action taken steps till date to maintain the CCTV and its record in all AICCS project sites as observed by CVO,BEL

Regards

Prabhu  Dandriyal,
21-Sunderwala, Raipur,

Phone 0135- 2787750, Mobile- 9411114879,
e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Registration Number                  DODFP/R/2019/50072

Recommendations:

  1. To blacklist M/s RD Konsultants for the fraudulent transactions with M/s BEL and also as the agency had involved in collusion of interest by executing the works through his affiliates M/s CS constructions Pvt Ltd, through subcontracting from M/s L&T. which has resulted in conflict of interest in the transactions with BEL . Financial penalty to be levied on M/s RD Konsultants as one way of punishment.

2        Disciplinary Proceedings to be initiated on the committee members   for violating company’s procedures   & CVC guidelines and facilitated the selection of M/s RD Konsultants during evaluation of prequalification, without scrutinizing the submission of works experience, site visits and clearing the fake turn over documents of M/s RD Konsultants. Theviolations were brought in the Corporate Vigilance observations points 1-15.

The following committee members are to be held responsible even though few of the delinquent officers are retired

  1. R K Handa then GM(NCS)     – Retired
  2. Gurjeet Singh then Sr. DGM(CS) – Retired
  3. T.K. Moitra    then DGM(F&T)
  4. Virender Kumar    then DGM(AC) CS
  5. Saleem Parveez.    Manager (Civil) CS

3       With respect to appointment of Mr. Manish Goyal, it is observed that his experience falls short of minimum criteria of 10 years. These facts are not checked by HR/GAD. Disciplinary Proceedings on Shri. Dibyendu Bidyanta, AGM(HR&A) & Shri. B.K. Pant, DGM(HR&A)  who are involved in the recruitment of Shri. Manish Goyal, as per CDA rules. Mr. Manish Goyal shall be kept under suspension henceforth for fair conduct of department/legal proceedings.

4  The unit has not prepared their own instructions and procedure duly approved by the board for the appointment of consultants to ensure that the selection is made with maximum attention to the suitability, competence and proven track record.

  1. CCTVs installed at the behest of vigilance has not kept in proper record which led to non-maintenance of measurement books, subleasing and collusion of parties.
  2. It is important to mention that IACCS is a time bound project of armed forces viz Air Force. Hence care to be taken to ensure customer get real value for money. procedural proprietaries are maintained, no collusion of interest and involve customer at all possible levels, abiding by CVC guidelines and no corrupt practices are involved, in such important projects.

CVO