Tag Archives: Appeal

Appeal to Independent Directors of BEL on Rs 7900 Cr Scam in IACCS Project

To

Dr. Bhaskar Ramamurthi, Director at IIT, Chennai,
Dr. R K Shevgaonkar, Professor at IIT, Mumbai,
Mrs. Usha Mathur, ex-Secretary to Govt. of India,
Mr. Sharad Sanghi, Entrepreneur,
Shri Mukka Harish Babu, Practicing Chartered Accountant,
Shri Surendra Singh Sirohi, ex-Secretary to Govt. Of India,
Shri Vijay S Madan, ex-Secretary to Govt. Of India,
Dr. Amit Sahai, Joint Secretary (P&C), Ministry of Defence, Department of Defence Production,
Ms J Manjula, Distinguished Scientist & Director General-Electronics & Communication Systems, DRDO,

ushamathur@hotmail.com,
harish@harishassociates.com,
bhaskar@iitm.ac.in,
vc@bennett.edu.in,
secretarial@hfcl.com,
sdpns@nic.in

MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

In an unprecedented move the defence public sector undertaking Bharat Electronics Limited (BEL) has suspended three senior officials, who unearthed massive irregularities in the Indian Air Force’s confidential IACCS project- underground bunkers- at 10 strategic locations. The three officials were part of Inquiry committee set up by the BEL’s Chief Vigilance officer (CVO) in July 2018 . The team exposing the role of high ranking officers and manipulation of awards of contracts in Rs.8000 Crore project had submitted the report in October 2018. Instead of taking action against the corrupt officers, BEL management led by its Chairman MV Gowtama, who himself is under the scanner in IACCS project, acted with vengeance and suspended the investigation team members.

It is pertinent to mention that after three-member probe committee submitted the report, BEL CVO , a senior IAS officer MR S.SHIVA KUMAR  1987 BATCH in his note dated 29 March 2019 exposed the deep-rooted corruption recommending strong action against erring officers and firms. Yet, the CMD , who is likely to be arrested if a probe is ordered, cracked the whip against inquiry committee members for doing honest job. This crackdown is in spite of  the fact that the CVO of the company as appointed by CVC of India had established and validated each point of the investigation report  and strongly recommended to management of BEL for immediate police and civil criminal action against concerned BEL officers and chief consultant of the project M/s RD KONSULTANT.  The role of senior DRDO officers is also under the scanner since it was DRDO which recommended and fully supported the name of RD Konsultant to BEL although it was done informally and BEL surreptitiously avoided DRDO role in the files.The role of DRDO officers was brought out and exposed by the BEL vigilance probe team which was suspended on 17 May 2019.  To distract the government’s IB report, CMD, BEL created suspension drama of three personal of BEL, 2 GM Vigilance and one manager to fooling the country. This shows the clear mockery of BEL management.

M/S RD KONSULTANT – DELHI  , which came out to be a shell company in investigation report , incorporated just 3-4 months before the award of PPR consultancy project with all false  and fabricated documents, and was wrongly  awarded DPR consultancy project also violating BEL own manual procedures as well CVC guidelines with a criminal intent of having control over all future activities of civil contract as well infrastructure/ Plant and machinery  items procurement worth more than Rs 3500 crores, as recorded in noting files  and  many senior management personals of M/S BHARAT ELECTRONICS , which is continuously being done since UPA CONGRESS REGIME 2011.

One very interesting fact of the whole case is that the two BHARAT ELECTRONICS senior management personals named Mr N.K. SHARMA DIRECTOR( MARKETTING) and MR CHANDERPRAKASH EXECUTIVE DIRECTOR (D&E) GAD, who were the chief &key persons for co ordinating the IACCS project getting approved from Indian air force, joined  a company named “OIS ADVANCE TECH” – 90% OWNDED BY MR SANJAY BHANDARI – famous arms dealer & power broker  and close associate of ROBERT WADRA immediately after their retirement from BEL in 2010 and 2011, and immediately after this this project got formally started by BEL . 

The detailed and very exhaustive investigation done by fact verification team in early 2018 and further investigation team in end 2018 and subsequently report by CVO of M/s Bharat Electronics has established the details of  massive corruption and mal practices done by M/S RD Konsultant, its associate/related firms and senior management persons of BEL  ( since 2011 onwards till now), by abusing their powers and violating all BEL manuals as well as documented CVC guidelines for tendering for award of civil project works and procurement of items worth more than 3500 crores.

These civil contract worth more than 1000 crores have been given of paper to reputed firms like M/S L&T but at almost 30 % higher and inflated rates (as also mentioned by then Director (Finance) Mr PRABHAT ACHARYA in file noting about more than 100 crore loss as well as violation of BEL Contract manual conditions as well as CVC guidelines) and after some period he resigned from company. After this project given to m/s L&T are being done by M/S RD consultant sister concern named M/S CS CONSTRUCTIONS at sites ( even MD- Mr Rahul Baucher  of M/S CS Construction used to come to BEL-Ghaziabad unit  for regular review meeting on behalf of L&T) – A serious violation of CVC  guidelines as well contract conditions of BEL & M/S RD KONSUL) , which seriously compromise the quality , as it is a very small petty company which in no way  has a technical capability and skill to deal such highly technical and secured project. This fact as validated by the fact that some sites were shown as collapsed during construction and crores of rupees were further approved by BEL management in name of deviation with fixing the responsibility on contractor.

The detailed design which was submitted by M/s R.D. Konsultants specified vendors for all the sub-systems which are used in the blast proof underground buildings. It is seen that these vendors are the same which they had brought out to be their partners during presented made by then during the Pre-qualification bid. The Order which was placed on BEL by Air Force was also based on the detail design report submitted by M/s R.D. Konsultants and hence all these vendors called in the order from Air Force were the same which were defined by M/s R.D. Konsultants.BEL has in turn placed many orders for the sub-systems based on the vendors defined by M/s R.D. Konsultants. A visit was made to the works of many of these European vendors by a team of engineers from BEL along with Air Force personnel. But is it said that the team was accompanied by a rep from M/s R.D. Konsultant and the visit was coordinated by M/s R. D. Konsultant. These foreign companies were allowed to supply materials on a single tender basis by the BEL chairman MV Gowtama. He in fact overruled his own officials and approved qualification of several firms despite they had failed to submit bid details during prescribed time. Such gross violation was similar to the ones seen during 2G scam. BEL Chairman violated the laid down norms by allowing these foreign firms despite objections duly recorded by the finance division.

All above shows a case of massive corruption, fraud and abuse of power with criminal intent and a huge loss to Government public money by BEL senior management persons in connivance with chief consultant, EX DRDO and some IAF officials. The whole investigation report findings are finally found true of the fact that as it is learnt from top BEL & DRDO sources last week M/s RD Konsultant has written to BEL MANAGEMENT that as his chief designer has left the company and the firm has gone bankrupt, he cannot give consultancy services to this project. Now on this bogus consultancy company’s  design, specifications and whole scheme of the project BEL management has already  spend thousands of crores of public money  and suppose its design does not work then who will own the responsibility of whole scam. Now the news that the firm M/S RD KONSULTANT is running out of project the reason could only be because his fraud has come out in media and BEL current management instead of taking legal action against the corrupt, trying to harass and victimize the honest and brave investigation team members ( in name of media leak- which even our prime minister call  as a strong pillar of democracy) .

The team which is suspended and currently facing all type of harassment, victimization and humiliation of suspension, but in spite of all pressures and threats, have unearthed this scam just to keep the spirit of national security and defence importance   and demand only for justice but calling for a detailed CVC/CBI/ED enquiry outside BEL management preview immediately and immediate intervention of MINISTRY OF DEFENCE for action on some BEL senior management for their misdeeds

A honest and sincere appeal to all  concerned officials of PMO/MOD /CVC/PRESS/JUDITARY that please take immediate action in this regard to keep “CHOWKIDAR “ alive in our souls  by safeguarding the honour of investigation team officials.

ABOVE ALL MATTER IS COVERED IN DETAILS BY  A REPUTED NEWPAPER

“FIRSTPOST”  IN ITS ARTICLE DATED 02 APRIL, 09 APRIL & 26 April 2019

Before publishing in media the matter was available with AF Intelligence, CVO, CBI, North Block, Chairman, DRDO, IB in March itself but god knows why any agency not take-up this matter seriously.

Hope you will take up matter seriously as you are responsible Member, Audit Committee and Director of BEL and may be aware of all developments from side of BEL management who are posing that matter is mare deviation of 50/60 lakhs as a bonafide fighter against defence corruption since more than 20 years I am fully aware of nexus. This nexus was designed by Retired Scientist of DRDO with ex DRDO chief because the U/G work of services was sole right of DRDO via SPIC, but when retirement stage these corrupt DRDO official gang create the scene and diverted this activity to BEL which doesn’t have any type construction division like DRDO have, U/G plant machinery experience either trading nor manufacturing in this tender only 500 cr electronics involvement can BEL claimed. As per investigation and observation it is clearly visualize that few greedy BEL official trapped in vicious DRDO official and for sake of few bucks they compromised with national security as well as their organization’s dignity. Please ask the vigilance report prepared by these three suspended BEL employees, Report is not an eye opener but will help govern to expose UPA era nexus who are responsible to siphon the defence budget under shadow of secrecy.

Appeal for Justice -Dr. Rohidas Gopinath Taware Ex TO’B’, HEMRL, Pune

Modi ji make a separate department to handle DRDO’s cases, grievances, corruptions cases and lot of inputs are flowing to PMO

From:

Dr. Rohidas Gopinath Taware                                                                                                        (Ex TO’B’, HEMRL,Pune)                                                                                                                 A- 11, Vijayraj Sankul,Near Medipoint Hospital,                                                                         P. Road, Aundh, Pune- 411 007.                                                                                                     M: 9423015022, Resi.: 020-2729888                                                                                           Email          : rohidas.taware@yahoo.com

To                                             Date:  10th Dec. 2014                                               Hon’ble Shri. Narendra Modi,                                                                                             Prime Minister, Room No.152,                                                                                                       PMO, South Block, New Delhi-110011.

Subject:     Appeal for Justice’.

Respected Sir,

Very humbly, I submit as under:

  1. I, Dr. Rohidas Gopinath Taware was working as a Group ‘A’ Gazetted officer with designation Technical Officer ‘B’ in High Energy Materials Research Laboratory (HEMRL), Pune- 411021, DRDO, Ministry of Defence. My educational qualification is M.Sc., Ph.D., MBA, PGDEE (Post Graduate Diploma in Ecology and Environment). I have completed 27 years’ of satisfactory service in HEMRL. My entire service record is spotlessly clean.

I hail from a much respected family. My father was a Freedom Fighter and a brave soldier of Azad Hind Sena.

  1. I had submitted timely my grievances to Dr. A Subhananda Rao, Director, HEMRL, Pune regarding my harassment. But no cognizance was taken by him.

I made earnest Appeal for Justice’ on 09.01.2008 to the Director of Personnel (DoP), DRDO, Ministry of Defence, New Delhi regarding my grievances along with supporting documents. I had written a letter on 04.05.2009 to DoP regarding my ‘Harassment by Ostracism’ in HEMRL, Pune. The DoP, too, did not take any cognizance of my grievances and harassment.                          

  1. Instead of considering the gravity of my grievances and harassment by ostracism, Dr. Arun Kumar, the Director of Personnel, all of a sudden, suspended me on 08.2009 by fax order. So, I lodged my protest on 26.08.2009 against the illegal suspension order issued by the DoP.
  1. There is a big conspiracy in DoP office of DRDO from my suspension to dismissal from the service. The Director, HEMRL gave false information to DoP that I was involved in “High-Handed Anti- Departmental Activities”, “the Laboratory has come to a stand still vulnerable position”, “the working of the Laboratory is badly dislocated” and “all officers are in demoralized state”.

The DoP office without any preliminary Inquiry proceeded against me and arranged for my suspension and further dismissal. Thus, the Director HEMRL and DoP joined hands against me and were bent upon to see that I was dismissed from service on 30.12.2010 for the reasons best known to them. The suspension to dismissal charges are not related to each other. Further, penalty of dismissal is horribly disproportionate to the charges leveled against me.

  1. The charges leveled against me for my dismissal like ‘tone and tenor of letter’ are trifling, false and fictitious.
  2. I wish to point out legal points regarding my suspension to dismissal which show that how the Principles of Natural Justice were blatantly violated.
  1. Two separate Memoranda, two separate Disciplinary Inquiries.
  2. Second Inquiry initiated for alleged misconduct during my suspension period when I was not on duty.
  3. Two separate Penalties simultaneously, First Minor & Second Major.
  4. Second penalty was awarded without cancelling first penalty.
  5. No revocation of suspension when first minor penalty was awarded.
  6. Second penalty of Dismissal awarded while under suspension.
  7. Both the penalties horribly disproportionate to the charges.
  8. All the orders from suspension to dismissal illegal. Approval from Rajya Raksha Mantri (RRM) taken instead of Raksha Mantri. Signatory to the orders not authorized under Art.77(2) of the Constitution.          
  1. After dismissal order, I have done a lot of correspondence with the Competent Authority of DRDO for my illegal suspension, illegal punishments including my dismissal and for the settlement of Government dues i.e. rightful amount. But no cognizance was taken by them. This is also the intentionally harassment of me and my family.
  1. I had submitted ‘Appeal for Justice’ to the Competent Authority of the DRDO for my grievances and harassment. But instead of taking any cognizance, suitable action or giving any justice for the same, they have horribly punished me.

It means, ‘Asking for Justice is a Crime’ in DRDO! The Competent Authority of DRDO unnecessarily constrained me to file a various suits in the Hon’ble Courts for the Justice. After the dismissal order, I am jobless. I am highly qualified with 27 years well experienced officer from DRDO but disqualified for any service in the society because of my additional qualification is ‘Dismissal’ which was illegally and unauthorized awarded by the Competent Authority of DRDO. Hence, in all respect, this is very serious harassment and punishment for me.

  1. Sir, I have mentioned all the above irregularities and illegalities, involved in my suspension to dismissal, for your perusal please. I pray and request you to look in to the case and give me justice.

Thanking you,

Yours sincerely,

Place: Pune

Date: 10.12.2014                                                               (Dr. R G Taware)                                                                                                                                                      Pune

Encl.:  Copies of Noting Sheets &Orders   : 13 pages

(Suspension to Dismissal)

Copy to,

Hon’ble Shri. Manohar Parrikar,                                                                                       Defence Minister,Room No. 104,                                                                                                    South Block,New Delhi -110011.

SATYAMEV JAYATE -III – 30714/2013/ Vigilance 9 complaint has been sent to CVO MINISTRY OF DEFENCE for necessary action on 26th December 2013

Believe me fellow citizen, the culprits of deliberately creating hindrances in the opportunity and fundamental rights of the lakhs of the youth of this great nation for consideration for public employment in DRDO will be very soon brought to the book only with the active cooperation of the concerned youth candidates and their parents.

CVC Registered the complaint – vide 30714/2013/ Vigilance 9 on 25th November 2013
30714/2013/ Vigilance 9 complaint has been sent to CVO MINISTRY OF DEFENCE for necessary action on 26th December 2013

Appeal

I call upon all concerned youth members of the public of this great nation who either applied for various posts in CEPTAM 06. in DRDO And didn’t get call letters and who wanted to apply but couldn’t apply due to the deliberate bottleneck created in the form of mobile registration, concerned parents of those youth candidates and fellow honest citizens (which inter-alia includes honest employees and officers of DRDO also) to provide information of the following kinds of acts and omissions of deliberate corruption done in the form of sugar coated capsules (seemingly making believing the general public at large as if the culprits acted in public interest) containing only poison which turned out fatal to all those members of the youth who either applied against the various post under CEPTAM 06 in DRDO but could not get call letters or who could not succeed in applying just for want of mobile registration since after repeated attempts mobile registration couldn’t take place.

1. Corruption in the form of making mobile registration as mandatory for applying for the various posts

(a) Kindly provide the information of the attempts made by you and by your parents for mobile registration at mobile no. between to to complete the first mandatory step for applying for the various posts in DRDO against CEPTAM -06 .

(b) Kindly provide the information of the time period in which the website of CEPTAM Delhi remained un operational/un-accessible due to which you couldn’t apply online for the various posts in DRDO against CEPTAM-06.

2. Corruption in the form of non-issuance of call letters to the persons who applied online and also sent offline applications for direct recruitment of various posts in DRDO against CEPTAM-06

(a) Kindly send the print out of your online application form against which you did not get call letter.

(b) Kindly send photocopies of your offline application forms against which you did not get call letter.

(c) Kindly send photocopy of the counter foil of the Indian Postal Order which you have attached with your offline application form sent with the CEPTAM, Delhi under CEPTAM-06 in respect of which you didn’t get the call letter.

(d) Kindly intimate me the manner through which you submitted your offline applications form to CEPTAM, Delhi against which you did not get the call letter.

(e) Kindly intimate the efforts made by you to get issued call letters from CEPTAM (including the information of the phone number of CEPTAM Delhi on which you made your efforts) and the results of such efforts.

(f) Kindly intimate the name of the officials of CEPTAM whom you contacted personally or on official telephone of the CEPTAM, Delhi but still your grievance was not redressed.

3. Corruption in the form of issuing defective call letters.

(a) Kindly send photocopies of the online print out of your application from and the defective call letters issued to you due to which you could not appear in the exam of CEPTAM-06 of DRDO.

(b) Kindly send photo copies of your offline application forms and the defective call letters issued to you due to which you could not appear in the exam of CEPTAM-06 of DRDO.

4. Corruption in the form of allotting exam centre at far off places altering the choice given by the candidate.

(a) Kindly send photo copies of your online print application form and the call letter issued to you un which the centre of written exam was allotted at different far off place due to which you could not appear in the written exam.

(b) Kindly send photo copies of your offline print application form and the call letter issued to you in which the centre of written exam was allotted at different far off place due to which you could not appear in the written exam.

5. Corruption in the form of non-ensuring of the website of CEPTAM operational and functional just some days before the exam.

(a) Kindly intimate the date of your failed attempts when you wanted to access the website of CEPTAM to download the call letter but you could not open the website and hence you could not appear for the exam.

6. Corruption in the form of late sending the call letter to the candidates.

(a) Kindly send the photocopies of the call letters which you received late.

CIC Decision on DRDO Corruption & Nepotism – 5

CENTRAL INFORMATION COMMISSION
Room No. 308, B-Wing, August Kranti Bhawan, Bhikaji Cama Place, New Delhi-110066

File No.CIC/LS/C/2012/001204

Appellant Shri Rajiv Chauhan
Public Authority DRDO
Date of hearing 09.08.2012
Date of decision 09.08.2012

Facts :-
1. Heard today dated 09.08.2012. Appellant present. DRDO is represented by Shri
Deepak Mishra, Scientist ‘E’.

2. It is noticed that vide RTI application dated 1.11.2011, the appellant had sought the names of the officers/scientists who were given extension in service after their superannuation at the age of 60 years. The CPIO had refused to disclose this information vide letter dated 30.11.2011 on the ground that DRDO is an exempted organization.

3. The appellant is seeking establishment related information and not any scientific information. Despite the DRDO being an exempted organisation, in my opinion, there is absolutely no harm in disclosing the requisite information to the appellant. Ordered accordingly.

4. This order may be complied with in 04 weeks time.

Sd/-
( M.L. Sharma )
Information Commissioner

Authenticated true copy. Additional copies of orders shall be supplied against
application and payment of the charges, prescribed under the Act, to the CPIO of this
Commission.

( K.L. Das )
Deputy Registrar

Address of parties :-

1. The Scientist ‘F’ & CPIO, DRDO, RTI Cell,
314-A, B-Block, DRDO Bhawan,
New Delhi-110105.

2. Shri Rajiv Chauhan,
1053/3, Shastri Nagar,
Meerut-250005.

 

The Right to Information Act, 2005

Appeal before the Central Information Commission;

Appeal No. ———————– Dated ————————
As I am aggrieved by decision of Central Public Information Officer and First Appellate

Authority, I hereby file this appeal for your kind decision.
1. Details of appellant:

1.1 Full Name: – RAJIV CHAUHAN

1.2. Full Address: R/O-1053/3, SHASTRI NAGAR, MEERUT (U.P)-250005

1.3 Phone/Cell No.: 09412628314 ; 09258045938 ; 0121-4009512;

4 Email ID: rajivchauhan89@yahoo.co.in

2. Details of Central Public Information Officer (CPIO):

2.1 Name/Designation: Dr.A.K.TYAGI ; SCIENTIST “F’ , CPIO, DRDO HQ;

2.2 Full Address: 314-A, “B’ BLOCK, DRDO BHAWAN, NEW DELHI-110105

2.3 Name of Public Authority: DRDO, MINISTRY OF DEFENCE.

3. Details of First Appellate Authority [FAA]:

3.1 Name/Designation of the FAA: Dr. ARUN KUMAR

3.2 Full Address of FAA: OS & DIRECTOR; DIRECTORATE OF PERSONNEL;

ROOM NO- 217, DRDO BHAWAN, NEW DELHI-110105

4. Dates of RTI application/first appeal:

4.1 To CPIO — 03 OCT 2011

4.2 To FAA: — 02 DEC 2011

5. Particulars of Decisions:

5.1 Reference No & Date of CPIO Decision:-

30 NOV2011; RTI/01/2091/P/2011/0291; CPIO.DRDO HQ; NEW DELHI

5.2 Reference No & Date of FAA’s Decision:-

20 JAN 2012; RTI/02/2091/F/2011/122;

6. Dates of receipt of replies by appellant from:-

6.1 CPIO— 07 DEC 2011

6.2 FAA: — 27 JAN 2012

7. Details of information sought:-

Kindly inform to you that a high no. of scientists are working beyond the age of superannuation of 60 years in DRDO. It seems that the irregularity are carried out by the officers / scientists appointment / service extension / re- employment through the contract basis in DRDO. As per the DOPT letter no. dt.9th Dec.2002 regarding the grant of extension / re-employment to central govt. servants beyond the age of superannuation – issue of instructions regarding.-“ Re-employment : No proposal for employing a govt. servant beyond the age of superannuation of 60 years shall be considered. It is also clarified that no person can be appointed / re-appointed to central govt. service after the age of superannuation of 60 years through contract.” This is a case of the corruption so that the main object to take this information is to provide as an evidence before High Power Investigating Officer/ Commissions / High Courts in the interest of law and justice. . I hereby enclosed all related documents for your consideration and decision.

I want the following information’s as under-

S.No INFORMATION SOUGHT REPLY
1. Pl. provide the name of the officers / scientists who is working after the age of superannuation of 60 years. Pl. provide the name of the officers / scientists.

2. Pl. provide the financial detail which obtained by these scientists. Pl. provide the total financial details obtained by these scientists.

3. Pl. provide the name of the officers who recommended their name for extension. Pl. provide the name .

I state that the information sought does not fall within the restriction in section 8 & 9 of the Act and to the best of my knowledge it pertains in the DRDO office contained & record. Above required information is directly related to corruption and not come under scheduled –II. I request to you please provide me the information by the speed post

8. Brief facts of the case:-

I submitted my RTI application before the CPIO, DRDO, New Delhi on dt.01-11-2011. Cause for put up this application was the allegation of the corruption / misuse of the office during the Re-employment of the scientist. CPIO reply is not satisfactory and not as per the law because the RTI is related with the allegation of the corruption and not exempted under section 24(1) of the RTI Act-2005.

However in this Supreme Court civil Appeal no – 6454,clearly mentioned that- “37. The right to information is a cherished right. Information and right to information are intended to be formidable tools in the hands of responsible citizens to fight corruption and to bring in transparency and accountability.The provisions of RTI Act should be enforced strictly and all efforts should be made to bring to light the necessary information under clause (b) of section 4(1) of the Act which relates to securing transparency and accountability in the working of public authorities and in discouraging corruption.”

I was not satisfied with the reply of CPIO,DRDO HQ, New Delhi, after that I submitted an appeal before FAA to take the information but the FAA of DRDO dismissed the appeal and failed to provide the information with the ref. of second schedule of the RTI Act & section 24(1) of the RTI Act-2005

9. Reasons/grounds for this appeal:-

That this information is directly related with the corruption and misuse of the office and not come under section 24(1) of the RTI Act because the high no of scientists are working and take the financial and other benefits after the violation of the-
(i)- DOPT rules as DOPT letter no. dt.9th Dec.2002 regarding the grant of extension / re-employment to central govt. servants beyond the age of superannuation – issue of instructions regarding.-“ Re-employment : No proposal for employing a govt. servant beyond the age of superannuation of 60 years shall be considered. It is also clarified that no person can be appointed / re-appointed to central govt. service after the age of superannuation of 60 years through contract.”
(ii)- Defence Research Development (DRDO)Service Rules no-9-“Probation- Persons appointed to the grade of scientist ‘B’ of the service either by direct recruitment or by promotion or by re-employment before the age of superannuation ,shall be on probation for a period of 2 years. Persons appointed to any other grade of the service viz. scientist ’C’. scientist ’D’ .scientist ’E’, scientist ’F’ and scientist ‘G’ .either by direct recruitment or by re-employment before the age of superannuation ,shall be placed on probation for a period of one year; Provided that the Director General may extend or curtail the period of probation in accordance with the instruction issued by the central govt. from time to time; Provided further that in case where it is proposed to extend the period of probation, the Director General shall give notice in writing of his intention to do so, to the officer with in twelve weeks after expiry of the initial or extended period of probation”

3- That the main object to take this information is to provide as an evidence before High Power Investigating Officer/ Commissions / High Courts in the interest of law and justice.
10. Any other information in support of appeal:-

This RTI information is required to proof a corruption during the re-employment after the violation of the DOPT & DRDO service rules. I hereby enclosed all related documents for your consideration and decision.
11. Prayer/relief sought for:-
I request your honor to pass an order to concern authority to provide the following information’s as under-
S.No INFORMATION SOUGHT REPLY
1. Pl. provide the name of the officers / scientists who is working after the age of superannuation of 60 years. Pl. provide the name of the officers / scientists.
2. Pl. provide the financial detail which obtained by these scientists. Pl. provide the total financial details obtained by these scientists.
3. Pl. provide the name of the officers who recommended their name for extension. Pl. provide the name .

I state that the information sought does not fall within the restriction in section 8 & 9 of the Act and to the best of my knowledge it pertains in the DRDO office contained & record. Above required information is directly related to corruption and not come under scheduled –II. I request your honor to pass an order to concern authority to provide the information’s by the speed post.
(2)- I request your honor to pass an order in favor of the applicant as deemed fit as an any relief .

Personal Presence at hearing:- — YES

Declaration:-

I hereby state that the information and particulars given above are true to the best of my knowledge and belief. I also declare that this matter is not previously filed with this commission nor is pending with any Court or tribunal or authority.

Place: MEERUT

Date: —————-

Signature of appellant

CIC Decision on DRDO Corruption & Nepotism – 4

CENTRAL INFORMATION COMMISSION
Room No. 308, B-Wing, August Kranti Bhawan, Bhikaji Cama Place, New Delhi-110066

File No.CIC/LS/A/2012/001190

Appellant Shri Rajiv Chauhan
Public Authority DRDO
Date of hearing 09.08.2012
Date of decision 09.08.2012

Facts :-
1. Heard today dated 09.08.2012. Appellant present. DRDO is represented by Shri
Deepak Mishra, Scientist ‘E’.
2. The appellant submits that there are a large number of senior scientists who have lived or are living in Government guest houses and yet claiming House Rent Allowance which is contrary to the rules. Thus, they are defrauding the Government. He provides a list of such scientists which is as follows :-

1. Dr. Prahlada, Chief Controller(R&D);
2. Sh. S. Sundaresh, Chief Controller(R&D);
3. Dr. K. Sekhar, Chief Controller(R&D);
4. Dr. r. Sreehari Rao, Chief Controller(R&D);
5. Dr. K.D. Nayak, Chief Controller(R&D);
6. Shri Ravi, Scientist ‘G’, CPIO;
7. Shri S. Sankaran, Director, ER&IPR;
8. Sh. H.V. Ssrinivasa Rao, Director, ISSA;
9. Sh. Ajay Ssingh, Chief Executive;
10. Sh. S. Shanker, Director, DCV&E;
11. Shri R.C. Katoch, Chief Tech Examiner;
12. Sh. B. Choubey, CCE and
13. Sh. Abhay Kumar, CCE.

3. He also produces a copy of the letter dated 17.8.2011 of Dr. Arun Kumar, Director of Personnel, wherein orders for recovery were made. The said letter, addressed to the Directors of all Labs/Establishments for recovery of HRA is reproduced below :-

4. “1. It has been observed that some officers posted to a Lab have stayed/are
staying in DRDO transit facilities/Guest house from the date of their reporting to that station Officers, if have stayed/staying in the DRDO transit facilities/Guest house for more than a month and have simultaneously claimed /claiming HRA for the said period of stay, is against govt. orders/regulations.

2. In view of the above, officers posted at any station who have stayed/staying in
DRDO transit facilities/Guest house for a month or more from their date of reporting and also have claimed/claiming HRA for the said period are required to refund the amount of HRA wrongly claimed forthwith by 15 Sep 2011 through MRO under intimation to the undersigned.
4. This has the approval of the competent authority.

5. The contents of this letter may please be communicated to all concerned.” He wishes to know as to why no recoveries have been effected so far.

6. To this, Shri Mishra would respond that recoveries have been made from all of the scientists.

7. In my opinion, this does not mitigate the irregularity committed in claiming HRA by the above named scientists. Even so, it is to be noted that recoveries have been made from all concerned. If so, the appellant may be informed accordingly in 03 weeks.

Sd/-
( M.L. Sharma )
Information Commissioner

Authenticated true copy. Additional copies of orders shall be supplied against
application and payment of the charges, prescribed under the Act, to the CPIO of this Commission.

( K.L. Das )
Deputy Registrar

Address of parties :-

1. The Scientist ‘F’ & CPIO, DRDO, RTI Cell,
314-A, B-Block, DRDO Bhawan,
New Delhi-110105.

2. Shri Rajiv Chauhan,
1053/3, Shastri Nagar,
Meerut-250005.

The Right to Information Act, 2005

Appeal before the Central Information Commission;

Appeal No. ———————– Dated ————————
As I am aggrieved by decision of Central Public Information Officer and First Appellate

Authority, I hereby file this appeal for your kind decision.
1. Details of appellant:

1.1 Full Name: – RAJIV CHAUHAN

1.2. Full Address: R/O-1053/3, SHASTRI NAGAR, MEERUT (U.P)-250005

1.3 Phone/Cell No.: 09412628314 ; 09258045938 ; 0121-4009512;

4 Email ID: rajivchauhan89@yahoo.co.in

2. Details of Central Public Information Officer (CPIO):

2.1 Name/Designation: Dr.A.K.TYAGI ; SCIENTIST “F’ , CPIO, DRDO HQ;

2.2 Full Address: 314-A, “B’ BLOCK, DRDO BHAWAN, NEW DELHI-110105

2.3 Name of Public Authority: DRDO, MINISTRY OF DEFENCE.

3. Details of First Appellate Authority [FAA]:

3.1 Name/Designation of the FAA: Dr. ARUN KUMAR

3.2 Full Address of FAA: OS & DIRECTOR; DIRECTORATE OF PERSONNEL;

ROOM NO- 217, DRDO BHAWAN, NEW DELHI-110105

4. Dates of RTI application/first appeal:

4.1 To CPIO — 29 OCT 2011

4.2 To FAA: — 17 DEC 2011

5. Particulars of Decisions:

5.1 Reference No & Date of CPIO Decision:-

30 NOV2011; RTI/01/2091/P/2011/0278; CPIO.DRDO HQ; NEW DELHI

5.2 Reference No & Date of FAA’s Decision:-

20 JAN 2012; RTI/02/2091/F/2011/121;

6. Dates of receipt of replies by appellant from:-

6.1 CPIO— 07 DEC 2011

6.2 FAA: — 27 JAN 2012
7. Details of information sought:-

Kindly inform to you that DRDO; Director of Personnel for DG(R&D) issued a recovery of HRA letter no-DOP/03/31000/M/05 DT-17 Aug.2011 that “It has been observed that some officers posted to a lab have stayed / are staying in DRDO transit facilities / Guest house from the date of their reporting to that station. Officers, if have stayed / staying in the DRDO transit facilities / Guest house for more than a month and have simultaneously claimed / claiming HRA for the said period of stay, is against govt orders / regulations.” It seems that a financial irregularity are carried out by the officers / scientist in DRDO. This is a case of the corruption so that the main object to take this information is to provide as an evidence before High Power Investigating Officer/ Commissions / High Courts in the interest of law and justice. I hereby enclosed all related documents for your consideration and action. I want the following information’s as under-

S.No INFORMATION SOUGHT REPLY
1. Pl. provide name of the officers / scientist who availed the facility of the guest house and get / benefited with HRA before issue this above noted letter of DRDO. Pl. provide name of the officers/ scientist.

2. Pl. provide name of the officers / scientist who availed the facility of the guest house and get / benefited with HRA and after issue this above noted letter of DRDO deposited / returned the HRA. Pl. provide name of the officers/ scientist.

3. After knowing this financial irregularity / cheating by the officers / scientist, has DRDO taken any action against the corrupt officers as per the law / CCS conduct rule. Pl provide authentic reply.

I state that the information sought does not fall within the restriction in section 8 & 9 of the Act and to the best of my knowledge it pertains in the DRDO office contained & record. Above required information is directly related to corruption and not come under scheduled –II. I request to you please provide me the information by the speed post.

8. Brief facts of the case:-

I submitted my RTI application before the CPIO, DRDO, New Delhi on dt.29-10-2011. Cause for put up this application was the allegation of the corruption / misuse of the office for HRA benefits in their own financial interest after corrupt practices because “ It has been observed that some officers posted to a lab have stayed / are staying in DRDO transit facilities / Guest house from the date of their reporting to that station. Officers, if have stayed / staying in the DRDO transit facilities / Guest house for more than a month and have simultaneously claimed / claiming HRA for the said period of stay, is against govt orders / regulations.” So that financial losses occurred to govt. funds by the corrupt officers / scientists. CPIO reply is not satisfactory and not as per the law because the RTI is related with the allegation of the corruption and not exempted under section 24(1) of the RTI Act-2005.

In his reply FAA mislead to me with the reference of Supreme Court civil Appeal no – 6454. However in this Supreme Court civil Appeal no – 6454,clearly mentioned that- “37. The right to information is a cherished right. Information and right to information are intended to be formidable tools in the hands of responsible citizens to fight corruption and to bring in transparency and accountability. The provisions of RTI Act should be enforced strictly and all efforts should be made to bring to light the necessary information under clause (b) of section 4(1) of the Act which relates to securing transparency and accountability in the working of public authorities and in discouraging corruption.”

I was not satisfied with the reply of CPIO,DRDO HQ, New Delhi, after that I submitted an appeal before FAA to take the information but the FAA of DRDO dismissed the appeal and failed to provide the information with the ref. of second schedule of the RTI Act & section 24(1) of the RTI Act-2005.

9. Reasons/grounds for this appeal:-

1- That this information is directly related with the corruption and misuse of the office and not come under section 24(1) of the RTI Act because Director of Personnel for DG(R&D) issued a recovery of HRA letter no-DOP/03/31000/M/05 DT-17 Aug.2011 . It seems that a financial irregularity are carried out by the officers / scientist in DRDO. So that financial losses occurred to govt. funds by the corrupt officers / scientists.

2- That the main object to take this information is to provide as an evidence before High Power Investigating Officer/ Commissions / High Courts in the interest of law and justice.

10. Any other information in support of appeal:-

CPIO reply against the CIC decision dt-29 Jun 2011on file no-CIC/LS/A/2011/000412 is a clear cut evidence in support of my RTI application related with corruption.(Encl)

11. Prayer/relief sought for:-
I request your honor to pass an order to concern authority to provide the following information’s as under-

S.No INFORMATION SOUGHT REPLY
1. Pl. provide name of the officers / scientist who availed the facility of the guest house and get / benefited with HRA before issue this above noted letter of DRDO. Pl. provide name of the officers/ scientist.

2. Pl. provide name of the officers / scientist who availed the facility of the guest house and get / benefited with HRA and after issue this above noted letter of DRDO deposited / returned the HRA. Pl. provide name of the officers/ scientist.
3. After knowing this financial irregularity / cheating by the officers / scientist, has DRDO taken any action against the corrupt officers as per the law / CCS conduct rule. Pl provide authentic reply.

I state that the information sought does not fall within the restriction in section 8 & 9 of the Act and to the best of my knowledge it pertains in the DRDO office contained & record. Above required information is directly related to corruption and not come under scheduled –II. I request your honor to pass an order to concern authority to provide the information’s by the speed post.
(2)- I request your honor to pass an order in favor of the applicant as deemed fit as an any relief .

Personal Presence at hearing:- — YES

Declaration:-

I hereby state that the information and particulars given above are true to the best of my knowledge and belief. I also declare that this matter is not previously filed with this commission nor is pending with any Court or tribunal or authority.
Place: MEERUT

Date: —————-                                                                             Signature of appellant

Appeal to clean DRDO of corrupt and Anti national officials

Dear friends,
 With the support of the true Indians we can save our premier defense organisation (DRDO) from the corrupt officials. I am appealing all my friends from DRDO to please support this blog and give your valuable inputs. It is required that we clean the problems of DRDO like nepotism and corruption. They are the root cause of DRDO’s failure in all fields. Friends, I have tons of evidences related to corruption, misinterpretation of rules and misappropriation of funds in DRDO.  I am fighting against corruption in DRDO, since 2000. I have submitted a series of evidences to all government agencies, but till date neither DRDO nor any government agency claimed that they are wrong. Now the RTI acts as the right tool to clean up corruption. With your blessing, I will post all evidences, letters and correspondences with all concern departments. The information from replies to the RTI’s I filed will be available for all the citizen of India. They can analyze the level of corruption in DRDO with the façade of secrecy.     

Fighting Corruption in DRDO