Complaint to CVC on IACCS Project

Dear Sir, Defence Public Sector company M/s Bharat Electronics-BANGALORE  is involved in massive corruption  and act of compromising national security in Indian Air Force confidential underground project worth Rs 7900 Crore. The project names as Integrated Air Command and Control System (IACCS) is basically “ Construction of underground bunkers across 10 strategic locations in the country in which all communication system which is going to command and control all RADARS and other communication infrastructure related to Indian air force in all the time and specially in war time can act as a complete safe house for all VIP/VVIPS as well as IAF Officials .

The whole project is being executed through an consultancy firm ( bogus/ shell company) named M/S R D KONSULTANTS DELHI , incorporated just 3-4 months before awarding the project related work started in 2010-11  with all false and fabricated certificates diluting the pre-qualifications norms just to make him accommodative violating all CVC norms/ BEL MANUALS  for tendering and contract. Further, this consultancy firm awarded major construction related works to its sister concerns having wife and other relatives as directors through a chain of shell / interrelated companies. 

Further Plant and Machinery Infrastructure items worth more than Rs 2500 crores are being procured from the foreign firms based in Germany, Finland. Interestingly, all these firms are linked to M/s RD KONSULTANTS where former BEL officials are also working. Even the CVO of the company SHRI SHIVA KUMAR, IAS in MARCH 2019 ,has endorsed  all findings of inquiry committee and mentioned serious violations involving criminal intent through violation of procedure, misrepresentation of facts, favourism to place order to prefixed vendors through vested interest, collusion of interest and attempt to make corporate losses  details of full CVO report is mentioned.

Unfortunately CMD, Mr MD Gowatma not forwarded the CVO recommendations to CVC which is mandatory as per CVC Guidlines and time to time orders

Mr Shiva Kumar, CVO, BEL  has finally recommended heavy punitive actions against BEL officials , and consultant firm with police case for recovery of money , before going  for his retirement as CVO of BEL on 29 March 2019, with advance copy of his REPORT & Recommendations to SECRETARY CVC and CVO MOD DELHI( as mandated as per CVC  guidelines and circulars no. 000/VGL/166 DATED 16 JAN 2001 & NO. 06/VGL/065 DATED JULY 2006 ). Also as per these circulars CMD Of the company also should send report to concerned CVO MOD and put up to the company board.

It is observed that CVC is not done any steps towards this serious corruption which is directly involved in serious compromise with our national security and hampered the defence preparedness, as the over ground Air force command has to complete operational in March 2018 but still the software’s etc are not ready. And underground command centres should be ready in coming October 2019 but the work is not completed even 30% only object to procure things for minting money and infrastructure are not ready or some are not started yet.

As amount is huge in tune of Es 7900 crs so all machineries are  working to buried the issue.

This whole act of massive corruption and irregular practices in such a highly sensitive and strategic national importance project has put the complete national security related to IAF operations and intelligence at Risk & Danger. Many of the project teams members of BEL some  of which have retired and now the present management team consisting of CMD (MR GOWTAMA), DIRECTOR (OU)- MR NATRAJ KRINAPPA, Director Finance Mr khosy ALEXXANDER   & GM-NCS MR JAYDEEP MAJUMDAR) are directly involved in these corruption and are openly supporting all this mal practices.

A direction was issued by BEL CMD MR GAUTAMA to cease and confiscate all Personal Computers of internal enquiry committee members which shows fear of corrupt BEL officials.  

Air Force’s (IAF) highly sensitive Integrated Air Command and Control System (IACCS) project to establish the 10 underground nodes in entire country Air Force site and knowingly under the command of MR GOWTAMA the all irregularities in constructions and procurements were overlooked and due collapse in three sites, the heavy losses worth several crores was born by BEL and protected the contractors/vendors interests and no penalty was made against design consultant even it is in terms and condition. All approvals were done by Mr Goawatma with vested interest and loss to poor public tax payers.

All above shows a case of massive corruption, fraud and abuse of power with criminal intent and a huge loss to Government public money by BEL senior management persons in connivance with chief consultant, EX DRDO and some IAF officials. The whole investigation report findings are finally found true of the fact that as it is learnt from top BEL & DRDO sources last week M/s RD Konsultant has written to BEL MANAGEMENT that as his chief designer has left the specifications and whole scheme of the project BEL management has already spend thousands of crores of public money and suppose its design does not work then who will own the responsibility of whole scam. Now the news that the firm M/S RD KONSULTANT is running out of project the reason could only be because his fraud has come out in media and BEL current management instead of taking legal action against the corrupt, trying to harass and victimize the honest and brave investigation team.  

Hope CVC will act on CVO, BEL recommendations and sent to this case to CBI for thorough investigation to save the public money

Regards

Complaint dated 15-07-2019 has been successfully received in CVC. For status/action taken on your complaint no. 131351/2019/vigilance-9 

Enclosed

  1. Details of Investigation of CVO, BEL on Air force IACCS Project irregularities
  2. Copy of BEL, CVO recommendations after investigation
  3. Copy email by site engineer who exposed the corrupt practices going on   Air force IACCS Project sites

MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

To.                                                                                           3rd June 2019

Shri Rajnath Singh Ji

104.  South Block

New Delhi – 110011

Dear Sir,

Congratulations for great victory and taking charge of big responsibility of Defence Ministry.

MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

In an unprecedented move the defence public sector undertaking Bharat Electronics Limited (BEL) has suspended three senior officials, who unearthed massive irregularities in the Indian Air Force’s confidential IACCS project- underground bunkers- at 10 strategic locations. The three officials were part of Inquiry committee set up by the BEL’s Chief Vigilance officer (CVO) in July 2018 . The team exposing the role of high ranking officers and manipulation of awards of contracts in Rs.8000 Crore project had submitted the report in October 2018. Instead of taking action against the corrupt officers, BEL management led by its Chairman MV Gowtama, who himself is under the scanner in IACCS project, acted with vengeance and suspended the investigation team members.

It is pertinent to mention that after three-member probe committee submitted the report, BEL CVO , a senior IAS officer MR S.SHIVA KUMAR  1987 BATCH in his note dated 29 March 2019 exposed the deep-rooted corruption recommending strong action against erring officers and firms. Yet, the CMD , who is likely to be arrested if a probe is ordered, cracked the whip against inquiry committee members for doing honest job. This crackdown is in spite of  the fact that the CVO of the company as appointed by CVC of India had established and validated each point of the investigation report  and strongly recommended to management of BEL for immediate police and civil criminal action against concerned BEL officers and chief consultant of the project M/s RD KONSULTANT.  The role of senior DRDO officers is also under the scanner since it was DRDO which recommended and fully supported the name of RD Konsultant to BEL although it was done informally and BEL surreptitiously avoided DRDO role in the files. The role of DRDO officers was brought out and exposed by the BEL vigilance probe team which was suspended on 17 May 2019.  To distract the government’s IB report, CMD, BEL created suspension drama of three personal of BEL, 2 GM Vigilance and one manager to fooling the country. This shows the clear mockery of BEL management.

M/S RD KONSULTANT – DELHI  , which came out to be a shell company in investigation report , incorporated just 3-4 months before the award of PPR consultancy project with all false  and fabricated documents, and was wrongly  awarded DPR consultancy project also violating BEL own manual procedures as well CVC guidelines with a criminal intent of having control over all future activities of civil contract as well infrastructure/ Plant and machinery  items procurement worth more than Rs 3500 crores, as recorded in noting files  and  many senior management personals of M/S BHARAT ELECTRONICS , which is continuously being done since UPA CONGRESS REGIME 2011.

One very interesting fact of the whole case is that the two BHARAT ELECTRONICS senior management personals named Mr N.K. SHARMA DIRECTOR( MARKETTING) and MR CHANDERPRAKASH EXECUTIVE DIRECTOR (D&E) GAD, who were the chief &key persons for co ordinating the IACCS project getting approved from Indian air force, joined  a company named “OIS ADVANCE TECH” – 90% OWNDED BY MR SANJAY BHANDARI – famous arms dealer & power broker  and close associate of ROBERT WADRA immediately after their retirement from BEL in 2010 and 2011, and immediately after this this project got formally started by BEL . 

The detailed and very exhaustive investigation done by fact verification team in early 2018 and further investigation team in end 2018 and subsequently report by CVO of M/s Bharat Electronics has established the details of  massive corruption and mal practices done by M/S RD Konsultant, its associate/related firms and senior management persons of BEL  ( since 2011 onwards till now), by abusing their powers and violating all BEL manuals as well as documented CVC guidelines for tendering for award of civil project works and procurement of items worth more than 3500 crores.

These civil contract worth more than 1000 crores have been given of paper to reputed firms like M/S L&T but at almost 30 % higher and inflated rates (as also mentioned by then Director (Finance) Mr PRABHAT ACHARYA in file noting about more than 100 crore loss as well as violation of BEL Contract manual conditions as well as CVC guidelines) and after some period he resigned from company. After this project given to m/s L&T are being done by M/S RD consultant sister concern named M/S CS CONSTRUCTIONS at sites ( even MD- Mr Rahul Baucher  of M/S CS Construction used to come to BEL-Ghaziabad unit  for regular review meeting on behalf of L&T) – A serious violation of CVC  guidelines as well contract conditions of BEL & M/S RD KONSUL) , which seriously compromise the quality , as it is a very small petty company which in no way  has a technical capability and skill to deal such highly technical and secured project. This fact as validated by the fact that some sites were shown as collapsed during construction and crores of rupees were further approved by BEL management in name of deviation with fixing the responsibility on contractor.

The detailed design which was submitted by M/s R.D. Konsultants specified vendors for all the sub-systems which are used in the blast proof underground buildings. It is seen that these vendors are the same which they had brought out to be their partners during presented made by then during the Pre-qualification bid. The Order which was placed on BEL by Air Force was also based on the detail design report submitted by M/s R.D. Konsultants and hence all these vendors called in the order from Air Force were the same which were defined by M/s R.D. Konsultants.BEL has in turn placed many orders for the sub-systems based on the vendors defined by M/s R.D. Konsultants. A visit was made to the works of many of these European vendors by a team of engineers from BEL along with Air Force personnel. But is it said that the team was accompanied by a rep from M/s R.D. Konsultant and the visit was coordinated by M/s R. D. Konsultant. These foreign companies were allowed to supply materials on a single tender basis by the BEL chairman MV Gowtama. He in fact overruled his own officials and approved qualification of several firms despite they had failed to submit bid details during prescribed time. Such gross violation was similar to the ones seen during 2G scam. BEL Chairman violated the laid down norms by allowing these foreign firms despite objections duly recorded by the finance division.

All above shows a case of massive corruption, fraud and abuse of power with criminal intent and a huge loss to Government public money by BEL senior management persons in connivance with chief consultant, EX DRDO and some IAF officials. The whole investigation report findings are finally found true of the fact that as it is learnt from top BEL & DRDO sources last week M/s RD Konsultant has written to BEL MANAGEMENT that as his chief designer has left the company and now on this bogus consultancy company’s  design, specifications and whole scheme of the project BEL management has already  spend thousands of crores of public money  and suppose its design does not work then who will own the responsibility of whole scam. Now the news that the firm M/S RD KONSULTANT is running out of project the reason could only be because his fraud has come out in media and BEL current management instead of taking legal action against the corrupt, trying to harass and victimize the honest and brave investigation team members ( in name of media leak- which even our prime minister call  as a strong pillar of democracy) .

The team which is suspended and currently facing all type of harassment, victimization and humiliation of suspension, but in spite of all pressures and threats, have unearthed this scam just to keep the spirit of national security and defence importance   and demand only for justice but calling for a detailed CVC/CBI/ED enquiry outside BEL management preview immediately and immediate intervention of MINISTRY OF DEFENCE for action on some BEL senior management for their misdeeds

A honest and sincere appeal to all  concerned officials of PMO/MOD /CVC/PRESS/JUDITARY that please take immediate action in this regard to keep “CHOKIDAR “ alive in our souls  by safeguarding the honour of investigation team officials.

ABOVE ALL MATTER IS COVERED IN DETAILS BY  A REPUTED NEWPAPER

“FIRSTPOST”  IN ITS ARTICLE DATED 02 APRIL, 09 APRIL & 26 April 2019

Before publishing in media the matter was available with AF Intelligence, CVO, CBI, North Block, Chairman, DRDO, IB in March itself but god knows why any agency not take-up this matter seriously.

Hope you will take up matter seriously as you are responsible Chairperson, Audit Committee of BEL and may be aware of all developments from side of BEL management who are posing that matter is mare deviation of 50/60 lakhs as a bonafide fighter against defence corruption since more than 20 years I am fully aware of nexus. This nexus was designed by Retired Scientist of DRDO with ex DRDO chief because the U/G work of services was sole right of DRDO via SPIC, but when retirement stage these corrupt DRDO official gang create the scene and diverted this activity to BEL which doesn’t have any type construction division like DRDO have, U/G plant machinery experience either trading nor manufacturing in this tender only 500 cr electronics involvement can BEL claimed. As per investigation and observation it is clearly visualize that few greedy BEL official trapped in vicious DRDO official and for sake of few bucks they compromised with national security as well as their organization’s dignity. Please ask the vigilance report prepared by these three suspended BEL employees, Report is not an eye opener but will help govern to expose UPA era nexus who are responsible to siphon the defence budget under shadow of secrecy. 

Regards

Prabhu Dandriyal,

21-Sunderwala, Raipur,

Dehradun-248008

Phone – 0135-2787750 | Mobile – 9411114879

Email – prabhudoon@gmail.com | website – www.corruptionindrdo.com

Bharat Electronics in the dock for ‘compromising’ confidential IAF project, favouring one vendor, BEL’s internal inquiry report reveals

Yatish Yadav Apr 02, 2019 – Firstpost

New Delhi: Defence public sector undertaking Bharat Electronics Limited (BEL) is under the scanner for allegedly compromising national security by awarding a highly sensitive air command and control contract of the Indian Air Force to an ill-equipped and newly formed private design firm in 2011. The project was worth Rs 7,900 crore.

An internal inquiry report of BEL has exposed massive irregularities in the way the contracts were awarded and how the Integrated Air Command and Control System (IACCS) was implemented at 10 locations across the country.

IACCS is an automated command and control system for air defence operations that integrates all ground-based and airborne sensors. BEL is the executing agency for the highly-sensitive project.

BEL’s internal investigation report — exclusively reviewed by Firstpost — also highlighted a conflict of interest of a BEL officer, who was instrumental in the hiring of a private vendor to put together the Preliminary Project Report (PPR) of the coded system, in joining the same private company after retirement. The report also suggested that the investigative team looking into the irregularities was not provided with crucial project documents allegedly to bury the scam.

The defence PSU’s internal inquiry report was prepared in October 2018. It flagged discrepancies at various stages of the execution of the project. To begin with, the report questioned the move to hire M/s RD Konsultants to prepare the PPR in 2011 and then bringing the same company on board as the design consultant in 2013, violating the norms in place during UPA regime. The inquiry report also red-flagged other serious issues, including monumental lapses in ordering the execution of the contracts at all 10 sites across the country and deviations in the implementation at certain project sites where BEL had to bear additional expenditure.

After Firstpost mailed a detailed questionnaire to MV Gowtama, chairman and managing director (CMD) of BEL, Ranjit Karamchandani from the CMD’s office denied the findings of the firm’s own inquiry report.”BEL follows a transparent process in selection of its vendors/partners,” he said. “Prima facie, BEL does not see any irregularity, as alleged.”

Questionnaires sent to RD Konsultants seeking its comment on findings of the inquiry report went unanswered.

Deep-rooted nexus exposed

According to the inquiry report, BEL first hired RD Konsultants in September 2011 to prepare the PPR for IACCS. The report pointed out that the firm was barely one and a half years old when it was hired, having come into existence on 1 April, 2010, on 50-50 partnership between Ruby Kant and Suresh Kumar Anand. The BEL top brass approved the proposal to award the contract to the company on 6 September, 2011, with a note that made it amply clear that “as per corporate vigilance guidelines, if ‘M/s RD Konsultants’ is hired as a consultant for preparing the PPR, then it cannot be considered for similar requirements in the future”. The note added that for the IACCS project, BEL would have to look for new consultants for “future requirements of consultancy”.

The inquiry report also flagged the way RD Konsultants was hired to prepare the PPR. “…No norms of Request for Proposal or tendering were followed, but it was selected just based on a recommendation by the Defence Research and Development Organisation (DRDO) with no written correspondence from the DRDO,” it said.

But BEL officers went a step ahead to allegedly favor RD Konsultants in the second stage of the project while hiring a consultant to prepare a Detailed Project Report (DPR), the inquiry report suggested. As per the rules in place in October 2012, BEL formed a committee to select consultants to prepare the DPR along with a detailed design for 10 sites of IACCS nodes. That RD Konsultants should not have been allowed was clearly mentioned in the file initiated by BEL’s Network Centric System (NCS-Strategic Business Unit) on 28 July, 2011, and cleared by the top brass on 6 September, 2011. But that did not happen.

RK Handa, who was the general manager of the NCS at the time, was part of the committee that selected the vendors and hired RD Konsultants in 2011, the report noted.

“In fact the file raised in October 2012 should have been in continuation to the file initiated on 28 July, 2011. Why it was not done needs a detailed investigation with respect to malafide intentions to violate the Central Vigilance Commission’s guidelines for hiring of consultants,” it added. “Even in the selection of M/s RD Konsultants for the second time, there were a lot of deviations from the norms laid down.”

The inquiry report further highlighted that had a financial criterion been put in place, RD Konsultants would not have qualified for the job.

The defence PSU signed the second contract with the firm in September 2013 to prepare the DPR of all 10 IACCS sites. The inquiry report noted that RD Konsultants was paid Rs 13.5 lakh for consultancy charges to prepare the PPR but Rs 15.94 crore for the DPR, alleging that someone was pulling the strings to favour the company, and that the financial criterion was changed twice during the course of selection of vendors.

“M/s RD Konsultants’ had been established in April 2010, but to show a turnover in the last three years as required, they showed a turnover in 2009-10, also verified by a chartered accountant. This clearly shows that false information was provided. Also, a company that came into existence on April 2010 showed that its employees had an experience of five years in 2013. This again is false information. It is interesting to note that another company, M/s Systems Dynamics, was rejected by the committee on the criterion that it had shown a turnover for only two years (2010-11 and 2011-12),” the inquiry report said.

The chartered accountant certificate enclosed with the inquiry report does not mention a telephone number. The letterhead of the CA firm merely shows an address of Shakarpur in New Delhi.

Raising concerns over the track record of RD Konsultants, the inquiry report recommended further investigation to find out whether it has actually completed the big ticket projects as it claimed to BEL. Raising suspicion, the report said RD Konsultants had mentioned that by March 2013, they had completed 30 projects worth Rs 1,266 crore, with consultancy charges of Rs 36 crore, whereas they had 45 works worth Rs 1,743 crore underway, with consultancy charges of Rs 52.29 crore.

“How was a company, which came into existence in April 2010, awarded 75 projects within three years (when as per DRDO rules, any company without requisite experience and turnover cannot be awarded contracts). What was the timeline in which these projects were completed? These need detailed investigations to find the ground reality. As per the BEL Works Contract Manual, it is mandatory that all vendors who qualify submit proof of the works they claimed to have done. RD Konsultants took the plea that they could not share details of the works since they were for the DRDO and confidential in nature, though another vendor, ‘M/s Systems Dynamics’, submitted documents related to the DRDO as well as the integrated headquarters of the army to confirm the work they did. There is no secrecy in the order copy or listing of the works carried out for the DRDO. Non-submission of the details (by RD Konsultants) itself casts doubts on the validity of the claims made,” the inquiry report said in its scathing observation.

BEL’s inquiry report further alleged that RD Konsultants had claimed to have provided design consultancy to a few well-known brands that specialise in equipment used for structures similar to IACCS, such as Temet Oy Finland and Pro-Hub Germany. It added that RD Konsultants was also into civil construction “with direct/indirect control on a lot of companies like SR Ashok & Associates, CS Construction etc.”

“Being the designer agency, which got the order for all 10 sites, they have a huge influence on the selection of vendors for various sub-systems of the project. A detailed investigation is needed to find out where orders have been placed with companies where RD Konsultants has direct/indirect influence. (There was a case wherein SR Ashok & Associates had applied for civil execution of underground structures and CS Construction was hired by L&T for execution of work at sites). Also, Temet Oy Finland and Pro-Hub Germany have been given orders for sub-systems to be installed inside the IACCS structures,” the report observed.

Moreover, the file to hire consultants for IACCS structures was initiated with the mandate that one agency will not get the order for all 10 sites. Even the newspaper advertisement and qualification document clearly mentioned that a consultancy firm could be given a contract for five sites. However, the inquiry report alleged that the entire process was manipulated. Further alleging serious charges of conflict of interest, the report said BEL officer PK Bhola, who was instrumental in having RD Konsultants cleared to prepare the PPR for the IACCS project in 2011 joined the same company after retiring from the defence PSU. The report said he might have passed on crucial information to benefit the company.

“How come the order for all sites was finally awarded to only one vendor, which violated the tender document? The quote given by RD Konsultants was nearly the same as that estimated by BEL, which leads to doubts whether the methodology of estimates was known to RD Konsultants. Mr PK Bhola (DGM of NCS-Marketing), who was the main resource in BEL for raising all the files and interfacing with the customer for the project, joined RD Konsultants after his retirement from BEL, and hence, all information was being transmitted to RD Konsultants through Mr Bhola,” the report alleged.

Firstpost reviewed two BEL notes regarding the inquiry report’s observations on Bhola. The first note from July 2011 signed by Bhola, when he was the deputy general manager of marketing at the NCS, is on hiring RD Konsultants to prepare the PPR for the IACCS project. The second note, dated 8 August, 2016, which is basically minutes of a pre-bid meeting for two tenders related to the IACCS project. In this, Bhola is mentioned as a representative of RD Konsultants.

Irregularities in ground execution

RD Konsultants is the design consultancy firm for all 10 IACCS sites, but the contract to execute the project was given to different companies. The details quoted by the inquiry report from the files related to the project suggests that after clearance, certain changes were made in the quantities, which escalated the cost of the project by Rs 106 crore to the government exchequer. The report said such changes were concurred to by the BEL director of finance vide note no 37, where it is mentioned that “this is a deviation from the works’ contract manual”.

The report further observed that L&T was awarded the execution work at three sites, but its cost per site was more than that of the other sites being constructed by other companies. The inquiry also found that L&T had subcontracted work at two IACCS sites to a private vendor, which is allegedly linked to RD Konsultants.

“L&T has further subcontracted part of the work at two sites to ‘M/s CS Constructions’, which is again a company related to RD Konsultants. The director of the company, Mr Rahul Bhuchar, has been coming to BEL and meeting the assistant general manager (infrastructure) as a representative of RD Konsultants. The sub-contracting of work by L&T to a party related to RD Konsultants is in violation to the terms of the contract. A civil engineering expert needs to go into the details of the costing for each site and the various considerations that led to the difference in the cost of various sites. As per the file on the selection of a consultant, DRDO representatives had brought out that all sites will be same, with only cosmetic differences in design. If that was so, then how come the difference in the costing between the lowest and the highest is more than two times?” the report said, flagging the loopholes in financial deviations, seeking further investigation into the entire matter.

It also said that under “para 3.2.3 of the design and engineering contract, RD Konsultants and his affiliates as well as sub-consultants have been debarred from providing any goods, works or services”. “RD Konsultants failed to make a voluntary and complete disclosure in this regard, thus violating the contract,” it concluded.

BEL shelled out more due to deviations in project

BEL’s internal investigation report said that at three IACCS sites, deviations in execution on the ground forced BEL to shell out more money. The report observed that at all three locations, the conditions of the sites during excavation were found to be in mismatch with those taken by RD Konsultants while designing and preparation of the Standard Operating Procedure (SOP) for excavation.

The report also revealed that a few IACCS sites under construction had collapsed. An inspection team visited one of the sites on 22 and 23 March 2018 to investigate the mishap. Although CCTV cameras were installed, the BEL fact-finding team was told by its own manager deployed at the site that the footage was not available. Interestingly, an engineer from MECON Limited, the government-owned company that blew the whistle on irregularities at a project site, was transferred. MECON Limited functions under the Ministry of Steel and is working as a project management consultant at five IACCS sites.

Firstpost is withholding the name of the whistleblower and the location of the IACCS project in the interest of national security. The inquiry report mentioned these in detail.

“There was a complaint received from ‘AAAAA’ (site engineer) posted by M/s MECON at the ‘BBBBB’ site alleging that though he had brought out that quality procedures were not being followed at the site, senior executives at BEL, in collusion with the vendor, have not responded to his calls/reports. He alleged that pressure was put on him to ignore the facts since it was more important to meet the timelines. He also alleged that he was transferred along with the local BEL site engineer because they had highlighted that procedures were bypassed. The complaints need to be pursued to find out the facts,” the inquiry report asserted.

Firstpost reviewed the engineer’s complaint dated 28 March, 2018, which was sent to two senior BEL officials. In the letter, he claimed higher officials of BEL impose a lot of unethical verbal instructions on juniors, which is damaging for a PSU of national importance.

“I was posted as the site in-charge of MECON Limited and tried my best to act as a whistleblower, being a part of a project of national importance. I had issued innumerable emails and letters regarding quality issues of the project. But the engineer in charge and other higher officials from BEL desisted me verbally to not follow quality procedures strictly on the pretext of progress of the project. They actually always blindly favored the contractor anywhere and everywhere,” the MECON Limited engineer wrote in his complaint.

“However, when we did not allow any relaxation in this regard and made deduction in bills wherever quality procedures were not followed, higher officials of BEL were not satisfied with the site in-charges (both officials of BEL and MECON Limited) for not favoring the contractor and for following the rule book strictly. For this reason, the BEL general manager and assistant general manager transferred their own site in-charge and pressurised MECON Limited to transfer its senior manager (name withheld) in September 2017 on the pretext that they did not perform satisfactorily, whereas actually it was just the opposite. This was to instill a sense of fear so that other engineers fall in line.”

The inquiry report said walls at the site of another project collapsed twice due to the soil conditions being different from what were assessed by the design consultant when the SOP for excavation was formulated. BEL had to get the soil analysed independently by the Indian Institute of Science in Bengaluru at its own expense.

“The total cost of the execution increased because of the side wall collapse and also the change in the foundation, which, once again, resulted in extra cash flow of crores of rupees. All this needs detailed investigation by some civil engineering expert,” report further added.

The report also highlighted glaring irregularities in the hiring of civil engineer Manish Goyal to look after the IACCS projects’ infrastructure as a manager. It claimed Goyal was hired despite falling short of the required 10 to 12 years’ experience and without having any exposure to highly specialised work like the IACCS project. The report expressed shock over this, saying it was quite surprising how and why the human resources division of BEL did not fully check or verify the documents Goyal’s submitted while establishing his experience as per BEL’s requirements and rules. The report said Goyal earlier worked with L&T. As the manager of NCS-infrastructure, Goyal was later given charge of the three IACCS sites that the infrastructure giant is working on and authorises L&T bills.

It is pertinent to mention that before the internal inquiry report was submitted in October 2018, a three-member BEL team had submitted an investigation-cum-site inspection report in May 2018 regarding certain allegations related to the execution of the IACCS projects. The panel, which included BEL officers AK Raheja, Sayanarayana and MM Roy, had submitted the report to BEL’s vigilance department, concluding that there were serious irregularities in the implementation of the ambitious national security project. Also, BEL’s panel report clearly said that the RD Konsultants’ capabilities were not checked before it was awarded the contract in 2011 and 2013.

“There are evidences of work being subcontracted to CS Constructions Private Limited by L&T, the execution contractor, both on the material and labour front. The registered addresses of CS Constructions Private Limited and RD Konsultants are one and the same. The company profile of YS Anand Consultants Private Limited shows Suresh Kumar Anand (partner of RD Konsultants) and Sarita Anand (director of CS Constructions Private Limited) as its directors. This evidences the fact of RD Konsultants’ involvement with the affiliates related to persons otherwise interested in project,” the panel’s report noted.

“The soil test report as submitted by the design consultant does not match the strata found in excavation,” it added. “Evidence exists of Manish Goyal (manager, NCS-infra), a key person in the infrastructure project, being a former L&T person. The documents submitted by Manish Goyal lack transparency. A part of the work experience of Manish Goyal conflicts with the tenure of pursuing M Tech, and to that extent, his work experience falls short of the minimum eligibility criteria. After the soil collapse at YYYY site (location withheld), no independent inquiry was conducted by the management for any corrective measure. The design of the soil extraction was changed without analysing the reasons for the soil collapse. Although a CAR (Comprehensive All Risk) policy exists in the joint name of BEL and L&T, no insurance claim was lodged. Pinpoint focus by BEL IACCS-Infra is somewhere lacking, and work is being left at the mercy of site engineers and the agencies hired.”

The panel’s report further suggested that BEL officials had tried to cover up the collapse. It indicated that the non-availability of CCTV camera footage at the important sites was yet another attempt to allegedly conceal the wrongdoing.

 

 

3,600 Crores Later, Made-In-India Akash Missile Fails Tests, Says Auditor

The Akash and its newer variant, the Akash Mk-2, are a medium-range surface-to-air missile system designed to intercept enemy aircraft and missiles at a distance of 18-30 km.
All India | Written by Vishnu Som | Updated: July 28, 2017 18:41 IST NDTV

The Akash was produced by the state-run Bharat Electronics.

NEW DELHI: As many as a third of the home-made Akash surface-to-air missiles have failed basic tests, says the country’s national auditor, claiming the deficiencies of the missiles “posed an operational risk during hostilities.”

The report of the Comptroller and Auditor General (CAG) is a big setback for the Make-In-India initiative which seeks to reduce India’s dependence on imported arms. The report, given to parliament, says, “the missiles fell short of the target, had lower than the required velocity, and there was malfunctioning of critical units.”

The Air Force has refused to comment on the report.

The Akash was produced by the state-run Bharat Electronics. The auditor says that though 3,600 crores have been paid to the manufacturer, none of the missile systems are installed at the six designated sites even though it has been seven years since the contract was signed.

The Akash and its newer variant, the Akash Mk-2, are a medium-range surface-to-air missile system designed to intercept enemy aircraft and missiles at a distance of 18-30 km. Tested extensively by the Indian Air Force, the Akash, which was first handed over in December 2008, was seen as a breakthrough indigenous system and in 2010, an additional six squadrons were ordered.

These additional squadrons, composed of missile launchers, radars, associated vehicles and hundreds of Akash missiles, were meant to be deployed at six air force bases in the East for which the government approved related infrastructure including storage facilities, workshops and ramp structures. These were supposed to be constructed by Bharat Electronics on a turnkey basis at a cost of approximately 100 crores. However, this infrastructure “could not be completed till October 2016 at any of the sites.” The auditor also says though work was nearly complete at two bases, the “IAF had not taken over these buildings because of defects in the construction, which rendered them unsuitable for strategic missile system storage. In other stations, the progress was below 45 per cent as of October 2016”.

While the missiles were indeed delivered to air forces bases between April 2014 and June 2016 after a delay of between 6 and 18 months, the missiles were found to be deficient in quality. According to the auditor, “Out of 80 missiles received upto November 2014, 20 missiles were test fired during April-November 2014. 6 of these missiles, ie, 30 per cent, failed the test.”