MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

To.                                                                                           3rd June 2019

Shri Rajnath Singh Ji

104.  South Block

New Delhi – 110011

Dear Sir,

Congratulations for great victory and taking charge of big responsibility of Defence Ministry.

MASSIVE CORRUPTION IN AIRFORCE UNDERGROUND STRUCTURE, IMPLEMENTATION AGENCY DEFENCE PSU BHARAT ELECTRONICS SUSPENDS ITS OWN INVESTIGATING OFFICERS FOR UNEARTHING ROLE OF CMD & TOP OFFICERS

In an unprecedented move the defence public sector undertaking Bharat Electronics Limited (BEL) has suspended three senior officials, who unearthed massive irregularities in the Indian Air Force’s confidential IACCS project- underground bunkers- at 10 strategic locations. The three officials were part of Inquiry committee set up by the BEL’s Chief Vigilance officer (CVO) in July 2018 . The team exposing the role of high ranking officers and manipulation of awards of contracts in Rs.8000 Crore project had submitted the report in October 2018. Instead of taking action against the corrupt officers, BEL management led by its Chairman MV Gowtama, who himself is under the scanner in IACCS project, acted with vengeance and suspended the investigation team members.

It is pertinent to mention that after three-member probe committee submitted the report, BEL CVO , a senior IAS officer MR S.SHIVA KUMAR  1987 BATCH in his note dated 29 March 2019 exposed the deep-rooted corruption recommending strong action against erring officers and firms. Yet, the CMD , who is likely to be arrested if a probe is ordered, cracked the whip against inquiry committee members for doing honest job. This crackdown is in spite of  the fact that the CVO of the company as appointed by CVC of India had established and validated each point of the investigation report  and strongly recommended to management of BEL for immediate police and civil criminal action against concerned BEL officers and chief consultant of the project M/s RD KONSULTANT.  The role of senior DRDO officers is also under the scanner since it was DRDO which recommended and fully supported the name of RD Konsultant to BEL although it was done informally and BEL surreptitiously avoided DRDO role in the files. The role of DRDO officers was brought out and exposed by the BEL vigilance probe team which was suspended on 17 May 2019.  To distract the government’s IB report, CMD, BEL created suspension drama of three personal of BEL, 2 GM Vigilance and one manager to fooling the country. This shows the clear mockery of BEL management.

M/S RD KONSULTANT – DELHI  , which came out to be a shell company in investigation report , incorporated just 3-4 months before the award of PPR consultancy project with all false  and fabricated documents, and was wrongly  awarded DPR consultancy project also violating BEL own manual procedures as well CVC guidelines with a criminal intent of having control over all future activities of civil contract as well infrastructure/ Plant and machinery  items procurement worth more than Rs 3500 crores, as recorded in noting files  and  many senior management personals of M/S BHARAT ELECTRONICS , which is continuously being done since UPA CONGRESS REGIME 2011.

One very interesting fact of the whole case is that the two BHARAT ELECTRONICS senior management personals named Mr N.K. SHARMA DIRECTOR( MARKETTING) and MR CHANDERPRAKASH EXECUTIVE DIRECTOR (D&E) GAD, who were the chief &key persons for co ordinating the IACCS project getting approved from Indian air force, joined  a company named “OIS ADVANCE TECH” – 90% OWNDED BY MR SANJAY BHANDARI – famous arms dealer & power broker  and close associate of ROBERT WADRA immediately after their retirement from BEL in 2010 and 2011, and immediately after this this project got formally started by BEL . 

The detailed and very exhaustive investigation done by fact verification team in early 2018 and further investigation team in end 2018 and subsequently report by CVO of M/s Bharat Electronics has established the details of  massive corruption and mal practices done by M/S RD Konsultant, its associate/related firms and senior management persons of BEL  ( since 2011 onwards till now), by abusing their powers and violating all BEL manuals as well as documented CVC guidelines for tendering for award of civil project works and procurement of items worth more than 3500 crores.

These civil contract worth more than 1000 crores have been given of paper to reputed firms like M/S L&T but at almost 30 % higher and inflated rates (as also mentioned by then Director (Finance) Mr PRABHAT ACHARYA in file noting about more than 100 crore loss as well as violation of BEL Contract manual conditions as well as CVC guidelines) and after some period he resigned from company. After this project given to m/s L&T are being done by M/S RD consultant sister concern named M/S CS CONSTRUCTIONS at sites ( even MD- Mr Rahul Baucher  of M/S CS Construction used to come to BEL-Ghaziabad unit  for regular review meeting on behalf of L&T) – A serious violation of CVC  guidelines as well contract conditions of BEL & M/S RD KONSUL) , which seriously compromise the quality , as it is a very small petty company which in no way  has a technical capability and skill to deal such highly technical and secured project. This fact as validated by the fact that some sites were shown as collapsed during construction and crores of rupees were further approved by BEL management in name of deviation with fixing the responsibility on contractor.

The detailed design which was submitted by M/s R.D. Konsultants specified vendors for all the sub-systems which are used in the blast proof underground buildings. It is seen that these vendors are the same which they had brought out to be their partners during presented made by then during the Pre-qualification bid. The Order which was placed on BEL by Air Force was also based on the detail design report submitted by M/s R.D. Konsultants and hence all these vendors called in the order from Air Force were the same which were defined by M/s R.D. Konsultants.BEL has in turn placed many orders for the sub-systems based on the vendors defined by M/s R.D. Konsultants. A visit was made to the works of many of these European vendors by a team of engineers from BEL along with Air Force personnel. But is it said that the team was accompanied by a rep from M/s R.D. Konsultant and the visit was coordinated by M/s R. D. Konsultant. These foreign companies were allowed to supply materials on a single tender basis by the BEL chairman MV Gowtama. He in fact overruled his own officials and approved qualification of several firms despite they had failed to submit bid details during prescribed time. Such gross violation was similar to the ones seen during 2G scam. BEL Chairman violated the laid down norms by allowing these foreign firms despite objections duly recorded by the finance division.

All above shows a case of massive corruption, fraud and abuse of power with criminal intent and a huge loss to Government public money by BEL senior management persons in connivance with chief consultant, EX DRDO and some IAF officials. The whole investigation report findings are finally found true of the fact that as it is learnt from top BEL & DRDO sources last week M/s RD Konsultant has written to BEL MANAGEMENT that as his chief designer has left the company and now on this bogus consultancy company’s  design, specifications and whole scheme of the project BEL management has already  spend thousands of crores of public money  and suppose its design does not work then who will own the responsibility of whole scam. Now the news that the firm M/S RD KONSULTANT is running out of project the reason could only be because his fraud has come out in media and BEL current management instead of taking legal action against the corrupt, trying to harass and victimize the honest and brave investigation team members ( in name of media leak- which even our prime minister call  as a strong pillar of democracy) .

The team which is suspended and currently facing all type of harassment, victimization and humiliation of suspension, but in spite of all pressures and threats, have unearthed this scam just to keep the spirit of national security and defence importance   and demand only for justice but calling for a detailed CVC/CBI/ED enquiry outside BEL management preview immediately and immediate intervention of MINISTRY OF DEFENCE for action on some BEL senior management for their misdeeds

A honest and sincere appeal to all  concerned officials of PMO/MOD /CVC/PRESS/JUDITARY that please take immediate action in this regard to keep “CHOKIDAR “ alive in our souls  by safeguarding the honour of investigation team officials.

ABOVE ALL MATTER IS COVERED IN DETAILS BY  A REPUTED NEWPAPER

“FIRSTPOST”  IN ITS ARTICLE DATED 02 APRIL, 09 APRIL & 26 April 2019

Before publishing in media the matter was available with AF Intelligence, CVO, CBI, North Block, Chairman, DRDO, IB in March itself but god knows why any agency not take-up this matter seriously.

Hope you will take up matter seriously as you are responsible Chairperson, Audit Committee of BEL and may be aware of all developments from side of BEL management who are posing that matter is mare deviation of 50/60 lakhs as a bonafide fighter against defence corruption since more than 20 years I am fully aware of nexus. This nexus was designed by Retired Scientist of DRDO with ex DRDO chief because the U/G work of services was sole right of DRDO via SPIC, but when retirement stage these corrupt DRDO official gang create the scene and diverted this activity to BEL which doesn’t have any type construction division like DRDO have, U/G plant machinery experience either trading nor manufacturing in this tender only 500 cr electronics involvement can BEL claimed. As per investigation and observation it is clearly visualize that few greedy BEL official trapped in vicious DRDO official and for sake of few bucks they compromised with national security as well as their organization’s dignity. Please ask the vigilance report prepared by these three suspended BEL employees, Report is not an eye opener but will help govern to expose UPA era nexus who are responsible to siphon the defence budget under shadow of secrecy. 

Regards

Prabhu Dandriyal,

21-Sunderwala, Raipur,

Dehradun-248008

Phone – 0135-2787750 | Mobile – 9411114879

Email – prabhudoon@gmail.com | website – www.corruptionindrdo.com

Disadvantages caused due to Bio-toilets introduced in the passenger coaches of Indian Railways – NFIR

National Federation of Indian Railwaymen
3, CHELMSFORD ROAD, NEW DELHI – 110 055

No.II/34/Pt.12

Dated: 10.8.2015

The Member Mechanical,
Railway Board,
New Delhi

Dear Sir,
Sub: Disadvantages caused due to Bio-toilets introduced in the passenger coaches of Indian Railways reg.

The concept of bio-toilets in passenger carrying coaches was given shape by the Railway Ministry some time in the year 2011 when in a few coaches of’ passenger carrying mail/express trains, the bio-toilets were first introduced. NFIR understands that the Railway Ministry plans to fit bio-toilets in all passenger coaches by 2021.

Federation has been receiving number of complaints from the C&W Staff on malfunctioning vis-a-vis disadvantages of the bio-toilets. In this connection, NFIR having gone into the complaints received from the C&W Staff, noticed the following problems which may cause serious health hazards to staff.

The bio-toilet system is very sensitive. It has more than 100% chances of choking even with a bit of ‘Pan Gulka’ spitted in the toilets by the passengers knowing or unknowingly if not flushed properly by the passenger in the moving or stationary trains. Choking in these toilets also takes place due to throwing of Napkins, Cigarette buds, Gutka Pouch, Ladies pads, Plastic Water Boltles or their covers, liquor boltles and garbage of food stuff by the passengers resulting toilet pans and leading to public complaints. This situation has been causing tremendous pressure on staff for no fault of theirs.

The ball-valve provided which should function to drain out the waste to the ground by operating a connected pedal, never works due to faulty design. It is also reported that designs differ from one manufacturer to another, causing problems in procurement of spares.

The RDSO designed simplified standard mechanism to operate the ball valve be not compatible with old designs.

It has been further complained that improper trials of revised versions/modifications before implementation has been the real problem in procurement of spares and has been creating confusion among the Supervisors and Staff in the course maintenance.

The C&W Supervisors and staff working in pit lines have been facing lot of inconvenience during under gear maintenance, examing brake beam, brake
block hanger, brake shoe assermbly, brake blocks, Safety wire rope & their pins, bogies frames and also facing serious inconvenience in piston stroke brake cylinder which faces tank of quite a big size and leaves narrow gap.

Bio-toilets required inspection & maintenance to ensure working of Ball-Valve & its operation linked with p-trap and Hose Connector, mounted and fitted in the narrow gap of the top surface of the tank and trough floor of the coach. C&W Engineers and Staff have been put to lot of difficulties during maintenance and have been subjected to more physical mental stress in day-to-day working. While working are being compelled to inhale foul smells emanating from the choked tanks containing human waste and have started acquiring diseases.

The process of draining out or the choked tanks generates unbearable filthy smell creating inconvenience to other technical staff working on other under gears and at times diverts their attention and Compels to ignore the necessary safety repairs due to bad work environment.
At present we have this system only on 10% of the coaches, causing serious problems. ‘The height of the problems can be measured when 100% coaches will have this system and will it be possible for staff to function? The C&W Supervisors and Slaff are reported to have become like human scavengers. It is worth-mentioning that the Government of India had banned scavenging in the year 1993 consequent to the directions given by the Apex Court through various judgements.

Federation has further been given to understand that as per Railway Board’s guidelines effluent test is required to be conducted to over 5% population of each type of coaches at an interval of 3 months and is to be conducted by the expert laboratory Staff. Unfortunatety, the Railway Authorities, instead of using Lab Staff for the said purpose, have been pestering C&W Staff to collect effluent from Bio-Tanks for conducting test in some Depots like Gwalior, despite the fact that this job is not related to C&W staff.

Federation notes with disappointment that the ‘Bio-toilet’ system introduced on the I.R. is claimed to be environment friendly but it is not so. particularly for the C&W Supervisors & Technical Staff of Mechanical Department.

NFIR, therefore. requests the Railway Board (MM) to kindly see that thorough review is conducted before proceeding further for introducing Bio-toilets in coaches.

Yours faithfully,
sd/-

(Dr M. Raghavaiah)
General Secretary
Source: NFIR

Toilets on trains: Some issues that need attention

October 18, 2014, Economic Times Blog
Ever since the Railway Committee started its work, whenever people run into me, even if it is at a social occasion, they buttonhole me and offer suggestions about what should be done to improve the Railways. This is understandable and desirable, since it is a manifestation of interest in the Railways. Often, though not always, these are complaints about passenger amenities, or their lack, and suggestions about improving these. Passenger amenities are only one aspect of improving the Railways, though this is visible, and is representative of most citizen interface with the Railways. Toilets figure towards the top of any average complaint list, toilets in stations and toilets on trains. For the moment, let me confine myself to toilets on trains. As everyone knows, Indian trains began to function from 1853. But toilets on trains had to wait till 1909. There is an oft-quoted, and therefore somewhat clichéd letter, written by Okhil Chandra Sen to the Deputy Superintendent of Sahibganj in 1909, familiar to all those who know about Indian railway history. The original letter is in the National Railway Museum, Delhi. This led to the introduction of toilets on trains.
Here is that self-explanatory letter. “Dear Sir, I am arrive by passenger train Ahmedpur station and my belly is too much swelling with jackfruit. I am therefore went to privy. Just I doing the nuisance that guard making whistle blow for train to go off and I am running with LOTAH in one hand & DHOTI in the next when I am fall over & expose all my shocking to men & female women on platform. I am got leaved Ahmedpur station. This too much bad, if passenger go to make dung that dam guard not wait train minutes for him. I am therefor pray your honour to make big fine on that guard for public sake. Otherwise I am making big report to papers.” Sahibganj (in Jharkhand) has seen better days, from the Railway point of view. It is no longer on the Howrah-Delhi main line. Ahmedpur is in West Bengal and Mr Sen must have travelled along the Bardhman-Sainthia section of what is called the Sahibganj loop.
IR (Indian Railways) has around 50,000 passenger coaches, a little less than 50,000 if you exclude EMUs (electric multiple units), a little more than 50,000 if you include EMUs. So these have to be fitted with toilets, say 4 per coach. This blog is only about toilets, not about cleaning and maintaining them. If it’s a short-distance train, you might legitimately argue you don’t need 4 toilets per coach. 2 might do and you might make them even more basic than those required for long-distance. Traditionally, IR toilets have provided for water and the waste has been discharged onto tracks. That’s a terrible idea from the sanitation point of view, especially when on a train is at a station. Tracks are corroded and so are fittings on the under-carriages. Why can’t we have toilets on trains that are like those in the West? What about the West? In some places in the West, you have what are called controlled discharge toilets (CDTs). These store waste in tanks and discharge them when the train attains a minimum speed. Three problems with these. First, you are still discharging on tracks, which is what you want to avoid. Second, these require trains to attain a minimum speed. Sometimes, trains don’t pick up that minimum speed at all.
Alternatively, at the other end, when a station has a long platform, the discharge begins before the train has left the station. Third, CDTs don’t work well when people use water, as opposed to toilet paper. Hence, no CDTs, though they have been used on Rajdhani, Shatabdi and Duranto. Almost 3000 coaches have actually been fitted with CDTs. Moving on, at best, on better trains (where people don’t use that much water), you can have tanks that don’t discharge, but have tanks that are cleaned. This is what happens with planes. However, with the large number of passengers who travel on trains, this won’t work except on short-distance trains, and those where people are unlikely to use water. Even if this were to be attempted, coaches need redesigning.
Therefore, IR has now veered around to bio-toilets, designed with DRDO collaboration. Bacteria decompose the waste. Some stuff is released as carbon dioxide and methane into the atmosphere. Whatever is left is chlorinated and disinfected liquid that can be released onto the tracks. In tests, the effluent hasn’t had any toxic effects on rats and fish. Since 2011, almost 5,000 coaches have been fitted with these bio-toilets, on Express trains like GWL-BSB Bundelkhand, GHY-MAS Egmore, Indore-Gwalior, Lucknow-Mumbai Pushpak, Jammu Tawi-Indore, NZM-Indore Malwa, NZM-Indore Intercity, Mumbai-BSB Mahanagri and Kochuveli-Bangalore. These are like trial runs, though you may not have noticed them. There is a decision that all new coaches will have bio-toilets, a decision that will effectively be implemented from 2016-17. Sounds good, but there are a couple of problems. First, for a new coach (with 4 toilets), bio-toilets cost Rs 3 lakhs per coach. But for an old coach, which has to be retroactively fitted, it costs Rs 15 lakhs per coach. Among other things, because these toilets add to weight, and ordinary coaches are heavily loaded, the weldings/mountings fail. The coaches have to cut open, so that these can be reinforced. Assuming you can spare the coaches, that’s quite a sum of money. But there is a decision that from 2021-22, all coaches will have bio-toilets.
The second problem is more serious. People stuff other things into toilets – polythene bags, sanitary napkins, diapers, bottles, pouches. These aren’t always bio-degradable. In those trial runs, one coach per train has come back with this kind of problem. Sure, there are waste-bins outside toilets. But passengers don’t always use them. For sanitary napkins/diapers, you can’t reasonably expect passengers to come out and use those bins. You need bins inside toilets, like aircraft. But bins inside toilets stink, unless they are regularly cleaned. Therefore, you realize the broad problem. There are multiple kinds of passenger segments. It’s one thing to lick a problem for a train that travels for no more than 24 hours (even easier for 8 hours). It is another thing to lick a problem for a train than travels for 72 hours.

Alarming Situation in DRDO for HR Management – DOPT Great stand

To                                                                                                       12th September 2014
Shri Sanjay Kothari,
Secretary (Personnel),
Department of Personnel and Training,
North Block, New Delhi -110001

Subject:  Alarming Situation in DRDO for HR Management

Reference: DOPT letter No.14029/1/2014-Estt.(L) dated 3rd September 2014.

Dear Sir,

               With reference to above subject and in the interest of larger public interest, the case study with evidences gathered by RTI replies from DRDO was submitted to then Defence Minister which subsequently endorsed to your department by then Defence Minister.

Surprisingly, today I have received above referred letter from your under secretary Sh S G Mulchandaney, in which he attracts my attention to DOPT OM No.11013/08/2013-Estt.(A)-III. (Copy enclosed for your ready reference)

It seems that your officials sitting there dealing such serious matter/ information blindly they even not bothered that it was duly endorsed by honorable minister. Can DOPT tell me that information submitted by me is related by any means with the DOPT OM No.11013/08/2013-Estt. (A)-III dated 6th June 2013.

It is requested that please take appropriate action to theses irresponsible officials who are trying to discourage honest approach for clean governance.

Regards
 
Prabhu  Dandriyal,
21-Sunderwala, Raipur, Dehradun -248008 
0135- 2787750,   9411114879,  
prabhudoon@gmail.com    www.corruptionindrdo.com

Enclosed:

  1. Letter to Sh A K Antony Subjected Alarming Situation in DRDO for HR Management dated 31st March 2014
  2. DOPT letter No.14029/1/2014-Estt.(L) dated 3rd September 2014.
Copy to-
  1. Hon’ble Shri Narendra Modi, Prime Minister, Room No -152, PMO, South Block, New Delhi-110011   
https://corruptionindrdo.com/2014/04/01/alarming-situation-in-drdo-for-hr-management/ 
 

  1. Dopt Reply on alarming HR