The Indian Railways need to buy 3,350 truckloads of cow dung at Rs 42 crore in 2018 to “recharge”–add bacteria to activate degradation–leaky, malfunctioning ‘bio-toilets’ that it has fitted on 44.8% of trains and hopes to expand to all trains by 2018, according to IndiaSpend projections of data released by the national auditor to Parliament.

Bio-toilets are small-scale sewage-treatment systems beneath the toilet seat: Bacteria in a compost chamber digest human excreta, leaving behind water and methane. That’s how they were supposed to work.

The Comptroller and Auditor General’s (CAG) report on these bio-toilets echoes the findings of our November 2017 investigation into their widespread malfunctioning: The CAG found 199,689 defects in 25,000 toilets.

Responding to the CAG findings, the railway ministry said its criticism was “not correct” and that “some problems of choking were occurring on account of misuse of toilets by passengers”. An official note from December 20, 2017, said: “These issues are being dealt with promptly.”

“By November 2011, the performance issues of each design of bio-toilets were clearly showing up,” the note said. “Therefore, the ministry did not wait until the end of the trial period to make the decision (to order the procurement of bio-toilets from private manufacturers).”

Our November 2017 story quoted studies from the Indian Institute of Technology (IIT) Madras and IIT Kanpur that said the bio-toilets were no better than “septic tanks” and the water they let out no better than “raw sewage”.

Each bio-toilet requires 60 litres–or three large bucketfuls–of inoculum, a mix of cow dung and water, according to the December 19, 2017, CAG report. This inoculum begins the process of breaking down 3,980 tons of human excreta that is released untreated by trains on rail tracks nationwide every day.

The bio-toilets originally used a bacterium found in Antarctica by a defence scientist, who cultured it in 2005 and 10 years later, got a patent on its use. Over seven years to 2017, 97,761 such toilets were fitted in new coaches or retrofitted in existing Indian trains.

The railways went ahead with the toilet installation even though the flaw in the basic model designed by the Defence Research and Development Organisation (DRDO) had been pointed out by an expert panel in 2007. In an interview (to be published tomorrow), Vinod Tare, an IIT professor of environmental engineering, who headed this panel, told us that these bio-toilets had been found ineffective at two venues: Kumbh Mela, the massive gathering of Hindu pilgrims held every 12 years at a river bank, and the army base-camp at Siachen glacier.

The panel’s two-year study was completed in November 2017 by IIT Madras, as IndiaSpend reported on November 23, 2017.

The railways sent a rejoinder to our story–you can read it here–and soon after announced they were exploring airplane-style vacuum toilets.

The railways bought 3,600 litres of inoculum for Rs 68,400 in May 2016, said the CAG report. Based on this cost, we estimate that to recharge the 97,761 bio-toilets currently in use, the railways will need 23.46 million litres–or 3,350 truckloads–of cow dung.

With the railways failing to produce enough bacteria, the cow dung will be sourced from private sector at Rs 19 per litre. The railways have a workshop–with an installed capacity to generate 30,000 litres of bacteria each month–in Nagpur, but no action has been taken on a 2011 proposal to set up two more facilities, at Kapurthala and Perambur.

No clarity on funds or manpower for bio-toilet project

There is no clarity on two other critical issues relating to bio-toilets on trains: The infrastructure costs involved in installation, including procurement and installation of evacuation machines and hydraulic lifts, and anticipated expenses on training and deployment of manpower.

Further, if all 54,506 rail coaches are to be fitted with vacuum toilets atop the bio-toilets being installed–as is being planned–there will be an additional cost of Rs 10,900 crore. The current market price of a vacuum toilet unit is approximately Rs 200,000.

The additional expense might have been worth it if the bio-toilet scheme, 24 years in the making, had been efficient. But the CAG has amplified concerns about its performance and has endorsed the findings of the IndiaSpend investigation.

The flaws in bio-toilets, according to the CAG

In an evaluation of 25,000 toilets for the period under review (2016-17), the CAG detected 199,689 defects and deficiencies. Here are some major issues, according to the report:

Highest number of problems/ defects (41,111) found at the Bengaluru coaching depot, followed by Gorakhpur (24,495) and Wadi Bunder (22,521);
Complaints per bio-toilet were highest at the Bengaluru coaching deport (98), followed by Wadi Bunder (32), Rameshwaram (28) and Gwalior (17);
Of the 102,792 instances of choking, 10,098 (10%) cases reported in March 2017;
Of the 102,792 cases of choking in 25,080 bio-toilets, the highest (34%) were reported from Bengaluru. This implied that one bio-toilet got choked 83 times a year;
Choking incidents have risen from 2015-16: One bio-toilet got choked four times a year during 2016-17.
Quantity and quality of material used criticised by CAG

In an email dated May 21, 2016, to then defence minister Manohar Parrikar, Y Ashok Babu, a scientist at the DRDO, had alleged that a “nexus of bureaucrats and industrialists” was pushing for what was “nothing but gobar gas plants involving no technology”.

The CAG report too slammed the railways for the “quality and quantity” of material being procured.

As the report observed, there were complaints pending against seven of the nine firms against with which the Railway Board placed orders. These are: Ms JSL Life Style Limited, Ms Omax Auto Limited, Ms Mohan Rail Components Limited, Ms Rail Fab, Ms Amit Engineers, Ms Hindustan Fiber Glass Works and Ms Rail Tech.

In July 2017, the railways ministry barred three companies (Ms Rail Tech, Ms Rail Fab and Ms Hindustan Fiber) from being considered for railway contracts for an unspecified period. The ministry also proposed that the contract of another company, Ms Mohan Rail, be cancelled.

Negligence in testing of effluents and bacteria culture

The CAG report found that 12 coaching depots of nine railway zones had not finalised the annual maintenance and operating contracts (AMOCs) for bio-toilets.

“Evaluation of performance is a continuous process resulting in addition or deletion from the approved list,” the railways ministry said in a press note in response to the CAG report. It added that “all major coaching depots now had the AMOC contract, while this was progressively being extended to other depots”.

As the CAG found, Indian Railways have not adhered to the guidelines on testing the effluents released by bio-toilets. The tests had not been conducted at all at the Dhanbad coaching depot and records of the samples sent for testing and the results of these tests were not maintained at five coaching depots.

At the Lower Parel workshop in Mumbai, 18 drums of bacteria procured at a cost of Rs 68,400 in May 2016 had been lying unused even after their shelf life had expired.

After 2011, the railways placed bulk orders for the supply, installation and commissioning of approximately 80,000 bio-toilets. The CAG criticised the railways for failing to come up with a “standardized design” for these units. It also pointed to the “large scale proliferation” of 10,000 tanks in November 2011 “before test results of trials on seven different variants had been analyzed”.

Earlier news reports had suggested that the land-based variants of these toilets were unsuccessful.

This is the first of a two-part series. You can read our November 2017 report on railway bio-toilets here.

Next: ‘Railways Went Ahead With A Failed Bio-Toilet Model’

(Jha is a New Delhi-based freelance journalist.)

Tweets

‘Railways Went Ahead With A Failed Bio-Toilet Model’ IndiaSpend

Tech solutions to train-toilet problem exist, but ‘the intention to find a lasting solution is not there’. Bureaucrats only interested in fulfilling targets, ensuring tenures are trouble-free: IIT engineer & professor Vinod Tare tells us. http://bit.ly/2CIZKAY

Some yrs back Jairam Ramesh took initiative & DRDO installed some bio toilets in the villages near Wheeler Island. No one used them.
Biotoilets don’t work in Indian context

द.ध्रुव से आयातित खास बैक्टीरिया से लैस करवाए गये हमारी रेलों के बायो- टायलेट करोड़ों खर्च करके भी नारकीय क्यों बने हुए हैं? जानकारी ।

So much for biotoilets http://www.indiaspend.com/cover-story/why-indian-railways-need-to-buy-3350-truckloads-of-cow-dung-for-rs-42-cr-78722 

Wow, that’s some sh*t!

On-board treatment of human excreta in trains is difficult; evacuation facilities & treatment plants–for compost or biogas–can be set up in the rail yards: IIT’s Vinod Tare, head of 2007 team that studied bio-toilet project in Indian trains.

http://ift.tt/eA8V8J’Railways  Went Ahead With A Failed Bio-Toilet Model’ – IndiaSpend http://ift.tt/2CN31jx

Who took decision to install bio-toilets in Railway, it appears that decision was taken decades back but installed during UPA regime but NDA is blamed

Failed bio-toilet model?

Bio-toilet model used in Indian trains failed to work at 2013 Kumbh Mela and Siachen but railways still pushing for use in all trains. Our interview with engineer & prof Vinod Tare, head of 2007 IIT study on train bio-toilets. http://bit.ly/2CIZKAY

Huge waste of your and mine..The Indian taxpayers money

Cc @PiyushGoyal @PiyushGoyalOffc

A 2007 study, jointly conducted by the Lucknow-based Research Designs and Standards Organisation (RDSO) and IIT Kanpur, also concluded that excreta wasn’t being treated in the bio-digesters. The railways has not made this report public. http://www.indiaspend.com/cover-story/railways-went-ahead-with-a-failed-bio-toilet-model-17151 

they planted the septic tank in the coaches.

Dr @PiyushGoyal ji ये हो क्या रहा है

Almost 2 lakh complaints of choking, foul smelling bio-toilets in trains: CAG

PTI|Dec 19, 2017,The Economic Times
NEW DELHI: Almost two lakh complaints regarding choking, foul smelling and non-functional bio- toilets in trains were received from the public in 2016-2017, a report of the Comptroller and Auditor General of India (CAG) said today.

The CAG, in its report on ‘Induction of bio-toilets in passenger coaches in Indian Railways’, has said that out of the 613 trains being handled in 32 coaching depots it audited, 160 trains did not have bio-toilets.

“In the remaining 453 trains having 25,080 bio-toilets, 1,99,689 instances of deficiencies or complaints were noticed,” the report stated.

With 1,02,792 complaints, choking seemed to be the most common problem for passengers regarding bio-toilets, the report said, followed by complains of foul smell (16,375), non-functional toilets (11,462), non-availability of dustbins (21,181), non-availability of mugs (22,899) and other complaints like ball valve failure and wire ropes (24,980).

The report has said that 1,02,792 cases of choking in 25,080 bio toilets imply “that one bio-toilet got choked four times in a year during 2016-2017.” During 2015-2016, for 24,675 bio toilets, 61,088 cases of choking were seen.

“This shows that instances of choking of bio-toilets increased in 2016-2017 and needs to be addressed,” it said.

The report said that 33.89 per cent of the choking cases were noticed in Bengaluru coaching depot in South Western Railway alone, which handles only 1.6 per cent of the total bio-toilets, implying that one bio-toilet got choked 83 times in a year.

The report which is based on audit for the period 2014- 2015-2016-2017 and was submitted in Parliament today, also provided Railways’ view on the stinking and choking bio- toilets.

Comments
S.K.
Bio-toilets are a very dumb idea. FEKU should have learned the best practice of rlys in the West.

Bio-vacuum toilets will keep the stench away in trains

Bio-toilets like these will be replaced by bio-vacuum ones

By Richa Sharma | Express News Service | Published: 04th December 2017
NEW DELHI: Stinky toilets in trains will soon be flushed away. Starting January 2018, Indian Railways will roll out first 100 coaches with bio-vacuum toilets like the ones in passenger airplanes. The bio-toilets in trains will be odour free, cut down water usage by one-twentieth and will have much lesser chances of getting blocked.

The Railways has been grappling with upkeep of bio-toilets as there were several complaints of them getting blocked due to dumping of waste such as plastic bottles, paper, cardboard boxes in the pot. Trials of bio-vacuum toilets were done in the Railways’ newly-launched premium train Tejas, and it has now been decided to install them out in other trains.

“To start with, Chennai-based Integral Coach Factory (ICF) will roll out 100 coach sets fitted with bio-vacuum toilets starting January 2018. Initially, these toilets will be fitted in AC-I and AC-II tier coaches of select trains

like Rajdhani, Shatabdi and Duronto,” said a senior Railway ministry official. Foul odour and high water consumption were also major reasons that made Railways decide to replace existing bio-toilets with the bio-vacuum ones. Typically, a conventional toilet or bio-toilet uses 10-15 litres of water per flush, whereas the vacuum toilet consumes only approximately 500 ml of water for flushing.

“A bio-vacuum toilet has a suction pump that sucks waste without need for much water to flush it. This will also help in containing the foul smell as bio-digesters will eat up the waste,” the official added.
Initially, the Railways will have to shell out more money to for bio-vacuum toilets as they will have to be imported. A bio-toilet costs Rs 2.5 lakh, while a bio-vacuum one is for Rs 3.25 lakh.

“The cost is likely to come down once we plan to have bio-vaccum toilets in all coaches. The manufacturers have assured us they will set up manufacturing units in India to meet the demand of these units,” the official added.

Over 79,500 bio-toilets have been fitted in more than 22,400 coaches till June this year. In the budget, Indian Railways was allocated Rs 1,155 crore for bio-toilets in passenger trains as part of the Prime Minister’s Swachh Bharat Mission.

In the loo-p

A bio-toilet uses 10-15 litres of water per flush while a bio-vacuum toilet consumes only around 500 ml
A bio-toilet costs Rs 2.5 lakh, a bio-vacuum one is for Rs 3.25 lakh.
Railways was given Rs 1,155 crore for bio-toilets in trains.

New toilets in trains no better than septic tanks: IIT-M study

By Srinand Jha The Economics Times, Nov 23, 2017
A new kind of toilet using bacteria to break down human excreta has been deployed in Indian trains over four years to 2017, at a cost of Rs 1,305 crore, but this toilet is no better than a septic tank, the Indian Institute of Technology-Madras (IIT-M) has concluded after a two-year long study.
As many as 93,537 “bio-digesters” — as the toilets are called –have been installed in mainline express and mail trains by the Indian Railways. These are small-scale sewage-treatment systems beneath the toilet seat: Bacteria in a compost chamber digests human excreta, leaving behind water and methane. Only the water, disinfected later, is let out on the tracks.
However, sanitation experts and various studies — including those commissioned by the railways — have pointed out that most of the new “” are ineffective or ill maintained and the water discharged is no better than raw sewage.
“Our tests have found that the organic matter (human waste) collecting in the bio-digesters do not undergo any kind of treatment,” IIT professor Ligy Philip, who headed the latest study, told IndiaSpend. “Like in the septic tanks, these bio-digesters accumulate slush (human excreta mixed with water).”
The IIT-M study was sponsored by the Bill and Melinda Gates Foundation and submitted last week to the Union Ministry of Urban Affairs.
Despite the criticism, an additional 120,000 coaches are to be fitted with these bio-toilets, jointly developed by the Defence Research and Development Organisation (DRDO) and the Indian Railways, by December 2018. This is likely to cost Rs 1,200 crore, the railways revealed on November 2, in response to a Right to Information (RTI) request.
The bio-digester project began during the previous United Progressive Alliance regime. But the project has been speeded up under Prime Minister Narendra Modi’s Swachh Bharat campaign. The idea is to meet this target in time for the celebration of Mahatma Gandhi’s 150th
Indian Railways is often described as the world’s biggest toilet: It ejects around 3,980 tonnes of faecal matter — the equivalent of 497 truck-loads — onto rail tracks every day, according to a report released by the Comptroller and Auditor General (CAG) in 2013.
The network has 9,000 passenger trains with 52,000 coaches with toilets that discharge human waste on to rail tracks. Covering 65,500 km across the country, these trains transport 24 million passengers every day, the equivalent of the population of Australia.
Since 1993, the Indian Railways have been experimenting with a host of technologies used worldwide to replace the open discharge system. This included vacuum toilets based on suction, commonly seen in aircraft; “controlled-discharge” toilet systems (CDTS) which allow waste to be dropped only after a train acquires a speed of 30 kmph, thus keeping stations clean; and “zero-discharge” toilets, in which solid waste is stored, evacuated and then dumped in pits for composting and the liquid filtered for recycling.
In 2008, the railways decided to install the bio-digester model developed by the Gwalior-based Defence Research and Development Establishment (DRDE).
Responding to the criticism of the bio-toilet, government officials said that the flaws are being fixed. “The issues regarding the bio-digesters are of a minor nature and are being effectively addressed. Some changes (in design or execution strategies) are inevitable, as this is a continuous process,” said Saxena.
Lokendra Singh, former director of the DRDE, had, after an expedition to Antarctica, brought home psychrophilic bacteria that can survive in extremely low temperatures. The bacteria were mixed with cow dung and normal soil, which have methogens (micro-organisms that produce methane) capable of breaking down human excreta. This was then supplied to the manufacturers of rail bio-digesters
“Because of the presence of a compound of bacteria, the bio-degradation process is set off in the toilet chambers-the bacteria eat up the organic matter (human excreta) and produce methane gas and water as byproducts,” Singh said.
But Singh’s claims of a scientific breakthrough using the bacteria from Antarctica have been questioned on several grounds, including the fact that the bacterium, as Singh admitted, has not obtained an independent or a third-party certification from an organisation such as the UIC (Federation of European Railways
Also, DRDO does not have a patent for the design or manufacture of these bio-toilets. A patent is necessary to market a commercial product. DRDO only has a patent for the design of “railway toilet tank”, as the organisation’s website reveals.
This is not the first time the railways’ bio-toilet project has been criticised. A 2009 study jointly conducted by the Lucknow-based Research Designs and Standards Organisation (RDSO) and IIT-Kanpur concluded that no treatment of human excreta was happening in the bio-digesters installed in railway toilets.
“We had found the discharge from these toilets as being no different from raw sewage,” said IIT-K professor Vinod Tare, who had headed the study, which the Railway Ministry has not made public.
On September 14, 2004, DRDO scientist Y. Ashok Babu sent a letter to the then Chief Vigilance Commissioner, Pradeep Kumar, terming the bio-toilets “farce (sic) technology”.
Singh rejected these allegations. “Frustrated scientists who have never worked on the project are raising such issues,” he said. “Of course, there are some problems but these are being addressed by the railways.”
Singh, who has assumed charge as the chairman of the Digesters and Bio-Toilet Manufacturers Association (DBMA) after his retirement from DRDE this year, said questions of “conflict of interest” did not apply in his case, as he held only an “honorary position with the DBMA”.
Documents available with IndiaSpend suggest that there are serious issues with the bio-toilet venture. These were discussed at a high-level meeting convened by the Railway Board on October 26, with functionaries from 17 zones.
During the last three years of the last government (2011-14), 9,350 bio-toilets were fitted in trains but the figure rose by 539 per cent, to 59,735, in the first three years of the NDA government (2014-17). In the current financial year (2017-18), 24,215 bio-toilets had been fitted until August 30, bringing the cumulative figure to 93,537, the railways said in its RTI reply of November 2.
In this period, the cost of manufacture and fitment of bio-toilets climbed from an average of Rs 52,000 per unit to over Rs 75,000 per unit. After the imposition of the Goods and Services Tax (GST), this cost burden has spiked further, with the railways having to absorb the 18 per cent levy.
“Cost escalation is inevitable, as manufacturing costs have been rising,” said Manoj Jha of Faridabad-based Arkin Technologies that manufactures and supplies bio-digesters to the railways.
In response to an RTI appeal from Dehradun-based activist Prabhu Dandriyal, the railways stated that the Hubli workshop of South Western Railways had been supplied 2,152 toilets at a cost of over Rs 22 crore during the financial year 2016-17. Based on this calculation, the current cost being borne by the railways works out to more than Rs 100,000 per unit.
By the time the task is completed, the railways are likely to exceed their budget of Rs 1,200 crore for additional bio-toilets. Arvind Dethe, a bio-toilet manufacturer based in Akola in Maharashtra, has been selling a similar toilet at Rs 6,000.

More SCR trains to feature bio-toilets

Staff Reporter – The Hindu HYDERABAD:, MAY 17, 2013

The bio-toilet costs about Rs.80,000 apiece and uses uses bacteria to decompose night soil. Authorities plan to install 200 of them in Padmavathi, Ajanta and other trains

After conducting a successful trial run of using bio-toilets in 17 coaches of Hyderabad-Mumbai and Kacheguda-Bangalore Express trains, the South Central Railway (SCR) has now decided to install 200 bio-toilets in a few more trains very shortly.

Bacterial decomposition

Developed by Railway Research and Standard Organisation (RDSO) and Defence Research Development Establishment (DRDE), a bio-toilet, has six compartments and uses Inoculums (bacteria) to decompose night soil.

The night soil from commode enters into the bio-tank, where the inoculums are stored and gets decomposed by the bacteria. The decomposed human soil will next enter into chlorine tank and to get purified. Finally, the out put will be water and gas, said SCR spokesperson.

Onerous task of hygiene

Maintaining cleanliness at railway stations, especially the tracks at stations is always a task. Conventional toilets in trains discharge night soil onto the track, causing unhygienic conditions and corrosion to track and coach fittings, he said.

But with simple design and easier installation in coaches, these bio-toilets help in ensuring zero discharge of night soil on the tracks. SCR had commenced a trail run of using these bio toilets in Hyderabad-Mumbai and Kacheguda-Bangalore Express trains in January and it was found beneficial, he informed.

Each bio-toilet costs about Rs.80,000 and authorities are planning to install 200 of them in Padmavathi, Ajanta and other trains in a few months, he explained.

Bio-toilets with provision to replenish inoculums and chlorine are easy to maintain.

However, these toilets would get choked, if passengers dump bottles, plastic carry bags, cups, napkins etc into it via commode. It would choke the toilet, making it unusable, he added.

Bacteria from Antarctica or cow dung? DRDO’s bio-toilet claim questioned

By ABHINANDAN MISHRA | New Delhi | 21 August, 2016 -The Sunday GuardianDRDO_Logo_New copy

 

 

 

 

 

 

 

 

 

Some scientists working with the Defence Research Development Organisation (DRDO) have questioned the veracity of the claim that the DRDO uses bacteria brought from Antarctica in its much-talked about bio-toilets that are being installed in railway coaches and public places. According to these scientists, who have filed a complaint with the Chief Vigilance Commission seeking an inquiry into the claims being made by DRDO, the defence outfit is using cow dung in its bio-toilets.

The bio-toilets that are being developed by DRDO’s Gwalior-based Defence Research and Development Establishment (DRDE) and the Tezpur-based Defence Research Laboratory (DRL), use anaerobic microbial bacteria to decompose and convert biological human excreta into usable water and gases.

DRDO has claimed that the anaerobic bacteria used in these toilets have been imported from Antarctica and that they can effectively function in extreme conditions and temperature ranging from -6 degree Celsius to 50 degree Celsius. However, scientists with DRDO have claimed that the imported bacteria cannot survive in high temperatures.

“These bacteria need a certain amount of heat (from 0 degree C to 5 degree C) to work efficiently and this was the reason why many such bio-toilets installed at Siachen for the Army are now useless as these could not function for the lack of heat. The DRDO, which has been claiming that it was using imported bacteria, is now forced to use cow dung in its bio-toilets,” said senior DRDO scientist Dr Y. Ashok Babu, who has lodged a complaint with the Central Vigilance Commissioner (CVC) and sought a probe in the matter. Ashok claimed that the whole thing is a farce and certain people within the organisation want to make easy money by making the government believe that they were using a sophisticated technology in their bio-toilets.

Another senior scientist working with DRDE, Gwalior, told this newspaper: “They are using cow dung rather than bacteria brought from Antarctica. The Defence Minister can independently speak to any microbiologist in the country and he will get to know the entire story.”

Earlier this month, Defence Minister Manohar Parrikar, while replying to a question in the Rajya Sabha, had stated that cow dung was being used in bio-toilets to multiply the bacteria from Antarctica, which was being used primarily. His response was based on the information provided by the DRDE.

Ashok Babu, however, clarified that “DRDE is claiming that it is using a ‘consortium’ of bacteria brought from Antarctica in the bio-toilets but the truth is that it brought a single species of bacteria and is now passing off a bacteria found in cow dung as bacteria from Antarctica. The Defence Minister should ask the concerned scientists in DRDE to list out each bacterium in the ‘consortium’ of bacteria; this will bring out the truth. After their attempts to impress the Army at Siachen by building bio-toilets failed, they are now trying to sell them to Indian Railways.”parliment question

Nearly 700 scientists quit DRDO in six years, says Govt

NEW DELHI, December 5, 2012 – THE HINDU

Scientists install a DRDO-developed bio-toilet in the icy vastness of Siachen. File photo: DRDO

Nearly 700 scientists have resigned from India’s premier military research body DRDO in little less than six years from 2007, Defence Minister A K Antony said on Wednesday.

In a written reply to a question in the Rajya Sabha on resignation of scientists from Defence Research and Development Organisation(DRDO), Mr. Antony said a total of 637 scientists resigned during 2007-2011 and 50 scientists up to October 31 this year.

Scientists who had resigned have either cited personal or domestic reasons for leaving DRDO, Mr. Antony said.

However, it is assumed that increased opportunities or incentives available in other organisations and industries are the main reason of such resignation, he added.

On incentives taken as corrective measures to restrict resignation of scientists from DRDO, Mr. Antony said excellent infrastructure facilities have been created at work places and residential complexes and two additional increments have been given on promotion to each grade.

To another question, Mr. Antony said DRDO is a subordinate organisation under Defence Ministry and does not enjoy any special powers or autonomy because of its strategic nature of work.

Asked whether DRDO enjoys a huge amount of autonomy because of its strategic nature of work, he said, “DRDO is a subordinate organisation under the Department of Defence( R&D) in Defence Ministry and is governed by central government rules and regulations.

“Therefore, DRDO as an organisation does not enjoy any special powers or autonomy because of its strategic nature of work.”

Revised delegation of financial powers of Director General of DRDO was carried out in 2010 to address a long standing requirement and was done after due process and deliberation, he said.

“The process of exercise of these powers has been further rationalised and a corrigendum has been issued by Department of Defence (R&D) on November 21, 2012 as a partial modification to the earlier financial powers,” the minister added.

____________________________________________________________

Question and Answer in  RAJYA SABHA

GOVERNMENT OF INDIA
MINISTRY OF DEFENCE
RAJYA SABHA

QUESTION NO 1295
ANSWERED ON 05.12.2012

Resignation of scientists from DRDO

1295 SHRI DILIPBHAI PANDYA

Will the Minister of DEFENCE be pleased to satate :-

(a) whether it is a fact that about 650 scientists have resigned from their posts in Defence Research and Development Organisation (DRDO) during the last five years;

(b) if so, the year-wise and post-wise details thereof;

(c) whether low emoluments in DRDO are the reasons for their resignation; and

(d) if so, what corrective steps are taken / proposed to be taken by Government to persuade the scientists not to resign?

ANSWER

MINISTER OF DEFENCE
(SHRI A.K. ANTONY)

(a) A total of 637 scientists have resigned during 2007-2011 and 50 scientists upto 31st October 2012.

(b) Year-wise and post-wise details are given below:-

Post Year
2007 2008 2009 2010 2011 2012
(as on 31st October 2012)
Scientist ‘B’ 166 78 41 38 58 35
Scientist ‘C’ 86 58 18 18 21 12
Scientist ‘D’ 13 8 2 2 5 3
Scientist ‘E’ 2 5 1 3 1 –
Scientist ‘F’ 6 1 3 2 1 –
Total 273 150 65 63 86 50

No Scientist ‘G’, Scientists ‘H’ and Distinguished Scientist have resigned during 2007-2012.

(c) Scientists who had resigned have indicated their personal / domestic grounds as the reasons for leaving DRDO. However, it is assumed that increased opportunities / incentives available in other organizations / industries is the main reason of such resignation.

(d) The following incentives have been granted as corrective measures to restrict resignation of scientists from DRDO:-

• Two additional increments on promotion to each Grade.
• Up to six variable increments on promotion granted on fast track.
• Professional update allowance to all scientists.
• Fast track promotions through assessments.
•Opportunity to acquire higher qualifications at reputed institutes viz. IIT’s / IISc, etc. as DRDO sponsored candidate.
•Young Scientists, Scientist of the Year and other DRDO Awards in recognition to their contributions, etc.
• Excellent infrastructure facilities have been created at work places and residential complexes.

Government is making all efforts to grant Performance Related Incentive Scheme (PRIS) to DRDO scientists at par with scientists of Department of Atomic Energy (DAE) and Indian Space Research Organisation (ISRO).