Tag Archives: CBI

Antony recommends CBI probe into DRDO recruitment scam

INDIAN EXPRESS

PTI : New Delhi, Sun Nov 17 2013, 18:20 hrs
Defence Minister A K Antony has recommended a CBI probe into an alleged recruitment scam in DRDO where several senior officers including two of its former chiefs are under the scanner.

The Defence Minister has recommended a CBI probe into the alleged recruitment scam in which two former DRDO chiefs and a former Chief Controller of the organisation are under scanner for allegedly giving jobs to their kins in alleged violation of rules and regulations, sources said on Sunday.

The vigilance wing of the Defence Ministry had been investigating the alleged wrongdoings in recruitment in the premier defence research agency for over a year.

Recently, a Director-rank officer of the DRDO was under scanner for his alleged role in an appointment made against the laid down procedures and was suspended hours before his retirement from service in May.

The official, a senior scientist, was suspended by the department as an inquiry was pending against him in a recruitment-related case where he allegedly recruited his own daughter in the organisation.

The matter had come to light after the Central Vigilance Commission (CVC) recommended action against two DRDO officials for their alleged role in the case.

The official suspended was involved in promotion and selection of scientists in the organisation.

The CVC had also recommended review of the appointment of the scientist’s daughter who is now working in DRDO as a ‘Scientist C’.

Defence estate officer gets 2-yr RI for accepting bribe

Express News Service : Pune, Tue Sep 03 2013, 01:58 hrs

A special CBI court on Monday sentenced a former defence estate officer (DEO), Pune Circle, to two-year rigorous imprisonment (RI) for accepting a bribe of Rs 50,000 from a retired chartered account who wanted his son’s name entered on government land records in 2009.

Special judge (CBI) Sudhakar Yarlagadda also imposed a fine of Rs 50,000 on Nadikattu Srinivasa Reddy (51), a resident of Pune Camp.

The case was investigated by CBI inspectors N M Parab and Alok Sinha. Special Public Prosecutors Vivek Saxena and Ayyub Pathan examined 10 witnesses to prove the charges against the accused. Retired chartered accountant Shapoor Homi Irani, a resident of Kondhwa Road, had lodged a complaint.

As per Irani’s complaint, Reddy had demanded Rs 5 lakh to enter his son’s name with respect to their two bungalows on Castellino Road in the Camp area.

Following his mother’s death, Irani had filed an application in February 2009 seeking mutation entry of the bungalows in favor of his son Bahram. However, the process was delayed and Irani met Reddy who asked for bribe on October 6, 2009. Irani lodged a complaint with the Anti-Corruption Bureau (ACB), CBI, Pune. A verification of the bribe demand made by Reddy before witnesses revealed he had asked Irani to pay Rs 3 lakh as the first installment and Rs 2 lakh later. The conversation was also recorded for evidence.

CBI officials, who had laid a trap near Reddy’s office-cum-residence on Rajendra Sinhji Road, caught him receiving bribe red-handed from Irani.

A case was registered against Reddy under the relevant sections of the Prevention of Corruption Act. A search at his residence had led to the recovery of about Rs 3.67 lakh in cash, documents of immovable properties owned by him and wife, a locker key, gold and silver ornaments worth over Rs 10 lakh and investment certificates of over Rs 4 lakh.

TWO YEARS RIGOROUS IMPRISONMENT TO THEN DEFENCE ESTATE OFFICER OF PUNE IN A BRIBERY CASE

TWO YEARS RIGOROUS IMPRISONMENT TO THEN DEFENCE ESTATE OFFICER OF PUNE IN A BRIBERY CASE
Press Release
New Delhi , 13.09.2013

The Special Judge, Pune has convicted Sh. N.Srinivasa Reddy, the then Defence Estate Officer, Pune and sentenced him to undergo two years Rigorous Imprisonment with fine of Rs.25000/- for demanding & accepting a bribe of Rs. 50,000/- from the Complainant.
This case was registered on 06.10.2009 on a complaint wherein it was alleged that Sh.N.S.Reddy while working as Defence Estate Officer had demanded a bribe of Rs.50,000/- from the complainant for recording/adding the name of his son in the Property card of two Bungalows at Castilno Road, Pune, as per the will of Complainant’s Mother. CBI laid a trap and caught Sh.N.S.Reddy, while demanding & accepting bribe of Rs.50000/- on 09.10.2009 from the Complainant.
The Trial Court found the accused guilty and convicted him.

Antony defends fired DRDO staff

By Gautam Datt in New Delhi   Saturday May 25, 2013

ak antony

A DRDO employee, sacked on the grounds that he was a perpetual troublemaker after blowing the lid off alleged irregularities in the recruitment procedure, has sought protection from the Central Vigilance Commission ( CVC) claiming he was harassed for being a whistleblower.

The CVC had sought response from the defence ministry’s vigilance wing before taking any action on the complaint filed by Prakash Singh, an administrative officer, who has been at loggerheads with the DRDO for some time now.

Singh was forced to go on premature retirement last year for alleging that his boss A. K. Maini had indulged in malpractices in the recruitment process. He had forwarded the complaint to the CBI. The DRDO claimed that Singh was sacked because the allegation levelled by him was baseless and caused embarrassment to the organisation and defamation to his senior. It also said the officer had “ acquired a habit of complaining against his colleagues, superior officers and other agencies like DCDA.” The other charge against Singh was that “ he had been involved in creating problem to the organisation by the hostile attitude towards his colleagues and officers that shows, he has not been performing his duties with the requisite quality”. In its reply to the CVC, the defence ministry said that Singh has sought defence minister A. K Antony’s intervention for getting reinstated.

It also said that allegations made by Singh about a scam in the recruitment exercise were being investigated by a high level committee in DRDO on the direction of the defence ministry.

The defence ministry has instructed DRDO to submit its report within a month.

The officer had complained to the CBI against some officers occupying key positions in the defence scientific establishment claiming irregularities in recruitment. But his identity was disclosed after the CBI referred his complaint to the DRDO’s vigilance wing.

Singh had approached the CVC earlier this year seeking protection under Whistleblower Resolution. The CVC on March 18 sought response from the vigilance wing of the defence ministry which came up with the reply on April 25.

DRDO employee sacked after blowing lid off alleged irregularity in recruitment procedure

‘ BASELESS’ ALLEGATIONS

The DRDO claimed that Prakash Singh was sacked because the allegation levelled by him was baseless and caused embarrassment to the organisation and defamation to his senior

Singh has sought defence minister A. K. Antony’s intervention for getting reinstated

High- level committee in the DRDO, on the direction of the defence ministry, will investigate the allegations made by Singh

 

Punished for highlighting corruption?’ DRDO officer ‘who knew too much’ sacked

By GAUTAM DATT PUBLISHED: 20:51 GMT, 2 November 2012 Mail Today

The Defence Research and Development Organisation (DRDO) on Thursday took the unprecedented action of sacking an officer who claimed to be a whistleblower.

Senior administrative officer Prakash Singh, posted at the Defence Science Centre at Metcalfe House in North Delhi, was served with compulsory retirement order.

Singh was due to retire on December 31, 2023. But a DRDO team visited his house at Timarpur and pasted the retirement notice on the wall. Sources said Singh, who had taken leave from work on medical grounds, was not at home at that time. Singh plans to challenge the move in court.

Building of Defence Research and Development Organisation (DRDO) office in New Delhi, India

He claimed the action against him was taken by officiating DRDO head H. Selvamurthy in the absence of scientific advisor to the defence minister, V.K. Saraswat, who is on leave.

Serving compulsory retirement notice is the harshest punishment that can be given to a government servant. DRDO sources said the action was taken strictly in adherence to the government rules.

The administrative officer is responsible for the functioning of a laboratory, but Singh had remained absent from work for two years in his previous assignments, they alleged.

The sources said Singh had a history of non-performance and trouble making.

He had made complaints against his seniors in the past which were found to be false, they added.

However, reliable sources said Singh was ‘punished’ for highlighting widespread corruption in DRDO.

The officer had filed a complaint with the CBI against three senior functionaries: Manas Kumar Mandal (director, institute of psychological research), Dr Anil Kumar Maini (director, Laster Science and Technology Centre) and Dr Arun Kumar (director, personnel, at the headquarters).

The CBI referred his complaint to the vigilance department of DRDO. One of these officers – Arun Kumar – was indicted in a recruitment scam by the Central Vigilance Commission that recommended penalty against him in August.

But the DRDO inquiry dismissed the charges of irregularities levelled against the three officials and recommended disciplinary action against Singh for making false complaints.

Misuse of the financial powers by the DRDO officers / Scientist. Can you fix accountability & responsibility for recovery?

Dated : 12-06-12

From-                                                                                                                                             Rajiv Chauhan;                                                                                                            1053/3,Shastri nagar,Meerut(U.P)                                                                09412628314;09258045938;

To,                                                                                                                                             Hon’ble  Defence Minister;                                                                                                     Govt.of India,  New Delhi,

 

Subject :   Misuse of the financial powers by the DRDO officers / Scientist. Can you fix accountability & responsibility for recovery?

Respected Sir,

CAG reports clearly is showing the financial losses by the DRDO officers / Scientists in different projects as attached for your perusal. Head of the department of the DRDO failed to fix the accountability & responsibility for these losses. Can you fix it for recovery?

I am unable to understand that why Head of the DRDO fail to fix the accountability & responsibility for these Billions losses which is clearly indication of the misuse of DRDO office and financial powers. A high level corruption after pecuniary arrangement is possible.

I will be highly obliged for your kind consideration and necessary action to fix the accountability & responsibility for recovery.

With high regards,

Your,  Sincerely.

 

ACA(Rajiv Chauhan)

COPY TO THE :   1- Hon’ble President of India for kind consideration and necessary action.

2- Hon’ble Prime minister of India for kind consideration and necessary action.

3- Director, CBI, New Delhi  for kind consideration and necessary action.

 

(Rajiv Chauhan)

 

CAG Report on DRDO

No.12 of 2010-11 (Defence Services)

 

CHAPTER VI :

DEFENCE RESEARCH AND DEVELOPMENT ORGANISATION

6.1 Injudicious creation of assets

An expenditure of Rs 8.92 crore incurred by Defence Research and Development Organisation (DRDO) for creation of assets to draw power from a power supply corporation became infructuous due to DRDO’s failure to assess the corporation’s ability to supply stable and uninterrupted power required for operation of highly sensitive equipment and machines.

DRDO imported various sensitive equipment and machines for creation of technical facilities for a programme of strategic importance at a station. These facilities required uninterrupted and high quality stable power supply. Based on the recommendations of a Board of Officers, Ministry of Defence accorded sanction in March 2000, as amended in December 2001, for provision of external electrification at the station at a total cost of Rs 9.54 crore, to be executed by a Chief Construction Engineer, Research and Development (CCE R&D). The CCE R&D completed the works for power

supply receiving and distribution to each of the sites within the station, under the supervision of the State Power Supply Corporation, in November 2001 at a cost of Rs 9.15 crore including expenditure of Rs 0.23 crore for power distribution to living accommodation. The corporation had agreed to supply 4500 KVA of power, in a phased manner, as sought by DRDO. However, before creating the assets for drawing power from the corporation, DRDO did not get firm assurance from the Power Corporation for supply of the quality of power required by DRDO for operation of the sensitive

equipment/machines of the programme. Due to excessive variations in voltage/ frequency/current in the power supplied by the corporation, the imported equipment procured under the programme did not function properly. This along with frequent interruption in power supply forced DRDO to procure DG Sets, separately at a cost of Rs 3.57 crore for the facility. Only the living/ administrative accommodation which required meager quantity of power could use the power received from the corporation. The contract demand was therefore reduced from 4500 KVA to 600 KVA by September

2004 for the day to day operation of the site and other technical facilities including the living/administrative accommodation. Further, a sum of Rs 1.80 crore was spent during 2002-09 for maintenance of the 66 KV line and associated facilities to avoid deterioration. Thus the expenditure incurred on establishing a sub station to support the 66 KV line was rendered infructuous. The Ministry admitted in September 2009 that DRDO had relied upon the State owned power corporation to adhere strictly to the quality specifications as laid down in the Indian Electricity Rules 1956, which they didn’t do.                                                                                     

TheMinistry also stated that such a complex technical facility, which is of strategic importance to nation’s security, was being established for the first time in the country and DRDO could learn its complex requirements from this experience and argued that the expenditure should not be treated as wasteful as the experience learned from this project was utilized in the next project where they did not seek the provision of electricity from state Electricity Board and had commissioned required DG sets directly. The Ministry added in February 2010 that a new Radar system planned for Air Force requirement would be assembled at the station in a period of two to three years and there would

therefore be higher usage of the substation in the future. The Ministry’s statement about the likely utilization of the assets when the planned radar system for the Air Force comes up in the next two-three years does not validate the creation of the assets in the year 2001 and keeping them idle for over a decade. Thus, the failure of DRDO to assess the ability of state power corporation to supply to the required specifications for operation of sensitive equipmentresulted in an infructuous expenditure of Rs 8.92 crore, besides burdeningitself with a recurring liability of maintaining the redundant assets

6.2 Loss due to damage to imported equipment DRDO suffered a loss of Rs 6.91 crore as an imported equipment was damaged due to mishandling by the Air Consolidation Agent.

The Director of a Defence R&D Laboratory placed purchase order on a UK based firm in October 2006 for a machine required for a project at a cost of Rs 18.46 crore. As per terms of the purchase order, 70 per cent payment (Rs 12.23 crore) was made to the firm on shipment of the machine. Remaining 20 per cent of the amount was to be paid after installation and 10 per cent after the end of the warranty period. The machine was to be delivered by end of July 2007 at the laboratory premises through an Air Consolidation Agent (ACA)17 having Air Consolidation Contract with the Defence Research and Development Organisation (DRDO). As per terms and conditions of the contract, the ACA was responsible for all losses or damages to the equipment due to any cause whatsoever from the time they receive the shipment till delivery at consignee’s end. It was also stipulated in the contract that in case of losses to stores occasioned on account of Agent’s negligence, the amount spent on account of ACAs negligence will be recovered from the Agent’s pending bills. The machine arrived at Delhi Airport on 8 August 2007 and was locally transported by the ACA on 9 August 2007. One package consisting of the main equipment of heavy weight and size was damaged as it fell down while unloading at the laboratory premises due to mishandling for which the ACA was responsible. 17 M/s Balmer  Lawrie and Company Limited: responsible for Air Consolidation Services, custom clearance and carrying of machine/stores being imported by DRDO Laboratories.

The Court of Inquiry (COI) constituted by the Director of the laboratory, to assess the loss and circumstances leading to damage found that the damage to the equipment was caused by the ACA while unloading. It was also revealed that the machinery and tools used by ACA while unloading were insufficient. The COI further recommended that pending settlement of the claim for liability of loss, the damaged component be got replaced from the supplying firm. Accordingly, the Director of the laboratory placed order on the same firm in January 2009 for supply of a new equipment for replacing the damaged one at a cost of Euro 960,000 (Rs 6.21 crore) excluding customs duty of Rs 0.70 crore which was to be paid by the Laboratory separately. The equipment was to be delivered by October 2009. Audit observed that despite contractual obligations, the laboratory did not raise any claim for the loss against the ACA though on behalf of the laboratory the ACA had lodged a claim of Rs 9.04 crore in February 2008 with the Insurance Company. The Insurance claim had however, not been finalized by the Insurance Company as of October 2009. The case reveals that DRDO has not only lost time but also suffered a loss of Rs 6.91 crore on account of damage to the equipment due to mishandling by ACA, which was yet to be made good as of October 2009 for which even the

claim has not raised against the transporting agency. In their reply of October 2009, the Ministry stated that they were making best efforts to recover the money to make good the loss. 

6.3 Avoidable expenditure due to poor planning of a work service Poor planning of a work service by the Programme Director and Chief Construction Engineer, led to an additional expenditure of Rs 1.39 crore towards payment of compensation to the contractor.

In January 2006, Chief Construction Engineer (CCE) Research & Development (R&D) Secunderabad entered into a contract with a firm for construction of accommodation for System and Test Integration RIG (STIR) at the cost of Rs 18.78 crore, to be completed by July 2007. A Board of Officers had earlier assembled in May 2005 to consider the requirement of work services for STIR of a Defence Research and Development Programme at Bangalore and recommended construction of the facility on top priority and also that the work relating to the shifting of 66 KV power (HT) line running right through the middle of the selected site, be taken up and executed separately to facilitate the construction. The Programme Director (PD), STIR was to make the site available to the contractor within four weeks of conclusion of the contract. However, action was not taken by the PD to get the HT line shifted. In March 2006, the PD and CCE decided that the work for shifting the line would be executed through the CCE. As clear work front was not made available to the contractor for eight months after the award of work in January 2006 the contractor could not proceed with the work. The CCE concluded a separate contract in June 2006 with the same contractor for shifting the line and got it completed in October 2006. The CCE granted extension of time for completion of work from July 2007 to March 2008. Against a compensation of Rs 3.67 crore claimed by the contractor to offset the expenditure incurred on idle machinery/manpower and increase in cost of material/labour due to the delay in commencement of work, DRDO had to pay an extra-contractual amount of Rs 1.39 crore. On being pointed out, the CCE informed Audit in November 2007 that it was initially planned that the programme authorities would shift the HT line and make the site available for construction. The task was later transferred to CCE only in June 2006. After transferring the responsibility, the CCE concluded the contract in June 2006 without further loss of time for shifting the HT line. These statements of CCE were not totally correct as in March 2006 itself, the

PD and the CCE had decided that the shifting of HT line would be undertaken by the CCE. However, the CCE took another three months to award the contract for shifting the HT line. Thus due to poor planning of the work services by the PD and the CCE and their failure to ensure shifting of HT line before award of the contract for the work services resulted in an avoidable payment of Rs 1.39 crore to the contractor, besides delaying execution of the work. The case needs to be investigated so as to fix responsibility for the lapse. The Ministry stated in January 2010 that partially clear site was made

available to the contractor and the work on piling was commenced on date in the areas/locations other than 66 KV HT line shadow. It was further stated that delay of eight months was beyond the control of DRDO. The facts, however, remain that the contractor could not progress with the work for eight months due to non-shifting of HT line for which additional payment of Rs 1.39 crore had to be made to the contractor, which could have been avoided had the HT line been shifted in advance.

6.4 Loss due to lack of coordination in procurement of a life saving item An expenditure of Rs 93.09 lakh incurred on procurement of drugs proved infructuous as the drugs could not be issued to users within their shelf life. Although the life saving item was accepted in September 2004 for use in the Army, it remained undistributed for nearly five years predominantly due to the lack of coordination between the developer and the user.

The Autoject Injector (AJI) set consisting of two individual autoject injectors, one containing Atropine Sulphate and the other containing PAM Chloride was developed by Defence Research and Development Establishment, Gwalior (DRDE) of Defence Research and Development Organisation (DRDO) to treat and counteract nerve agents poisoning. On exposure to nerve agents, these are to be used by individuals for immediate treatment by self administered injection. Based on the requirement projected by Army HQ, the Ministry of Defence (MOD) issued sanction in September 2004 for production and supply of Autoject Injectors along with equal number of Atropine Sulphate and PAM

Chloride drug through DRDO. The sanction stipulated that the terms of supply of equipment would be determined and monitored by Army HQ/MOD in consultation with DRDO. DRDE procured from private sector firms 32,400 AJI for injecting Atropine Sulphate and 32,400 AJI for PAM Chloride along with 33,000 each of Atropine Sulphate drug cartridges and PAM Chloride drug cartridges at a cost of Rs. 2.80 crore, of which Rs 93.09 lakh was for the drug cartridges. Shelf life of AJIs was five years, that of Atropine Sulphate drug was two years, and it was only one year for PAM Chloride drug. The AJI and drug Cartridges were received during May/December 2005 and September 2005/January 2006 respectively. However, Army HQ did not intimate the consignee details to DRDE. In response to a request by DRDE, Army HQ (Additional Director General Weapons and Equipment) advised them in February 2006 to obtain consignee details from Dy. Director General Perspective Planning (Nuclear Biological and Chemical Warfare) and to deliver the consignments only after the items were duly inspected and certified fit in all respects by the representatives of the users. In the Joint Inspection, which was not attended by the user’s representative, held in April 2006 it was found that 25700 AJIs of Atropine Sulphate and 27,689 AJIs of PAM Chloride were acceptable. The remaining were defective and therefore rejected. The date of expiry of the drug PAM Chloride varied from June 2006 to October 2006 and that of the Atropine Sulphate varied from May 2007 to October 2007. In view of the early expiry of the drugs, the Joint inspection team recommended that process be initiated to replenish the drug cartridges. DRDE informed Army HQ in April 2006 about the acceptance in inspection of AJIs and sought consignee details. In July 2006, Army HQ asked DRDO HQ to send these to the Central Ordnance Depot Kandivli. Army HQ simultaneously informed DRDO HQ that the drug cartridges of PAM Chloride with balance shelf life of less than 75 per cent and Atropine Sulphate with shelf life expiring before 01 October 2007 should be replaced. In July 2006, DRDE issued 25,000 AJIs along with drug cartridges to Armed Forces Medical Store Depot Mumbai as later advised by Army HQ. However, the supplied stores could not be used due to non-availability of adequate shelf life of drug cartridges. DRDE placed supply orders for 8000 each of for AJI (Atropine Sulphate and PAM Chloride) and drug Cartridge 33000 each at a cost of Rs 0.12 crore and at a cost of Rs 1.35 crore respectively. Joint inspection was carried out for Atropine Sulphate and PAM Chloride drug cartridge received between July and September 2008. However, these were rejected by DGQA in October 2008 due to detection of butyl fragments in the injected content of drug, less injection of drug than the stipulated therapeutic dose making it ineffective and weak plastic bodies of reusable injectors. Army HQ in June 2009 formed a study group to analyse the complex issue in its totality. Based on the recommendations of the Study Group suggestions of Director General Armed Forces Medical Services and reassurance of DRDO about the efficacy of the drugs, Army HQ agreed to accept the AJIs and the drugs in their present condition for use during emergencies only, with the condition that DRDE would develop improved version at the earliest. The overriding consideration for the acceptance of the AJI/drug was that the advantage of the AJI outweighed the potential risks associated with the deficiencies pointed out by DGQA in October 2008. The Ministry of Defence stated in November 2009 that there was no loss since the Army had accepted the AJIs and drugs. The fact remains that the procurement of drug cartridges at a cost of Rs 93.09 lakh during 2005-06 was clearly a loss since their shelf life expired before the AJIs were accepted for use by the Army. Although the sanction issued by the Ministry in September 2004 stipulated that the terms of supply of equipment would be determined and monitored by Army HQ/MOD in consultation with DRDO, the above events are symptoms of lack of coordination and understanding among DRDO HQ, Army HQ and DRDE. Resultantly, the AJIs and their drugs developed for use in emergencies as life saving items remained without any use for nearly five years with associated financial repercussions such as loss on account of expiry of their shelf life. The case points to the need for a better coordination and communication between the associated agencies

to accomplish value for money and the Research and Development efforts. 

  No. 24 of 2011-12 (Defence Services)

6.1 Blockage of public money due to take over of unusable land Imprudent decision to acquire forest land by DRDO at a cost of ` 73.26 crore which could not be used for other than forest purpose not only delayed the completion of project but also blocked Government money

as land was not used for the project.

The Ministry of Defence in June 2003 sanctioned a project for ‘Development of Vehicle Mounted energy System’ by Defence Research and Development Organisation (DRDO) at a cost of ` 97.40 crore. The project was to be completed by June 2010. An ‘Integration and Test Facility’ was to be created under the project in a vast area of approximately 700 acres of land for testing purpose.DRDO initiated action in February 2004 for acquisition of 700 acres of land at Faridabad for the facility. The requirement was increased to 1100 acres in August 2005. The identified land belonging to Faridabad Municipal Corporation was covered under the Forest Conservation Act, 1980 and notifiedas such by Haryana Government in August 1992 under Section 4 of Punjab Land Preservation Act, 1900 (PLPA) which prohibited erection of buildings on the land. DRDO enquired from the Conservator of Forests, Haryana regarding the formalities to be completed for diversion of forest land for nonforest use and compensatory afforestation charges to be paid under Forest Conservation Act, 1980. Conservator of Forests, Haryana informed in November 2005 that out of the total 1104 acre of proposed land, 1091 acres of land was forest land. He also informed that Hon’ble Supreme Court in its order dated 18.3.2004 clarified that land notified under Section 4 & 5 of PLPA 1900 would be treated as forest and diversion of this land for non-forestry use would invoke Forest Conservation Act, 1980 under which this land cannot be put to use for nonforestry purpose without obtaining permission from the Government of India. Despite this, the Haryana Government in August 2006 on reconsideration offered 1100 acres of Forest land at Faridabad to the DRDO at the rate of ` 18 lakh per acre. DRDO in May 2007 reduced their requirement to 407 acres of land. In July 2007, the Commissioner, Faridabad Municipal Corporation informed DRDO that the Haryana Government had approved the proposal for allotment of 407 acres land at the rate of ` 18 lakh per acre to DRDO on the condition that DRDO will take necessary action for de-notification of land from the purview of PLPA 1900 from the Forest Department. Pending clearance of Forest Department, DRDO paid ` 73.26 crore in three instalments from October 2007 to April 2008 to State Government and took possession of land in April 2008. In June 2008 the Forest Department, Haryana informed DRDO to seek prior permission of Central Empowered Committee (CEC) for use of land. On an application filed by M/s R.D. Consultants on behalf of DRDO for seeking permission for non-forestry use of 407 acres of land allotted to the DRDO, the CEC filed a report in August 2009 in Hon’ble Supreme Court in pursuant to the Hon’ble Court order. The CEC recommended that the permission for use of land for setting up of the Centre by the DRDO may not be accepted. CEC also recommended that an alternative site jointly identified by the DRDO with Haryana Government may be used by DRDO and State Government should take immediate steps for acquiring the alternative identified land. However DRDO is yet to get the alternative land. Meanwhile, the Apex Review Board for the Project in December 2008 directed to use Terminal Ballistics Research Laboratory (TBRL) Ramgarh range by creating infrastructure at a cost of ` 38 crore, as Faridabad test range was not ready. The PDC of the main project was extended from June 2010 to June 2013. DRDO HQ stated that the test range to test the system was planned at Faridabad but the acquired land could not be utilized in view of non-clearance by CEC. TBRL Ramgarh has been identified as alternative site and development cost on this land for carrying out permanent facility for testing would be around ` 38 crore for which sanction was under process as of April 2010. The fact that subject land was under Punjab Land Preservation Act, and also that Supreme Court judgement prohibited use of forest land for non-forest purpose was well known. Hence decision of DRDO to acquire the subject land from State Government which could not be used for creating facility as CEC refused permission to use the land for other than forest purpose was imprudent and resulted in blockage of Government money to the tune of ` 73.26 crore. The Ministry stated in December 2010 that with the past experience, DRDO was confident and sure to get forest clearance for carrying out construction on the said land. But case for diversion for non-forest use was not accepted by the CEC as the area falls in the catchment area of two lakes posing serious environmental impact on ground water and flow of water to lake and Aravalli range. The case for refund of ` 73.26 crore had already been recommended by CEC and forwarded to Hon’ble Supreme Court of India on 22 September 2010. The fact, however, is that an amount of ` 73.26 crore paid from Defence Grants during October 2007 – April 2008 remained blocked with the State Government and this could have been avoided had the DRDO examined the likely legal implications beforehand.

6.2 Procurement/receipt of equipments after the closure or at the fag end of a project Defence Materials and Stores Research & Development Establishment (DMSRDE) procured equipments worth ` 1.52 crore after technical completion of the project or at the fag end of a project. The project was completed with the facilities available in DMSRDE and other Labs implying that the procurement was avoidable.

Ministry of Defence in February 2005 sanctioned a project on “Development of New Generation Polymers” (DRM 546) at an estimated cost of ` 8.50 crore for completion by February 2010. The project was technically completed in December 2009 and closure report was submitted in February 2010 with completion cost of ` 6.13 crore which included procurement of machinery and equipments worth ` 2.83 crore. Audit scrutiny indicated that the DMSRDE procured/received equipments worth ` 1.15 crore after technical completion of the project, i.e. December 2009 and equipment worth ` 0.37 crore at the fag end of the project. This was in contravention of DRDO Headquarters instructions to DMSRDE Kanpur in October 2004 to procure equipments at least six months before probable date of completion of the project to utilise these for production of some data or results which was expected from them. The time taken in procurement of five equipment i.e. from user demand to supply order ranged from 72 weeks to 142 weeks against the prescribed time of 26 weeks stipulated in Defence Procurement Manual 2005. In response to the audit query DMSRDE clarified that the facilities available in the Lab (DMSRDE), IIT Kanpur and other R&D Labs were used for the project and hence the project could be completed without the equipments. The said equipments procured under the project were being utilised even after the completion of the project for other ongoing projects and are essential for future projects. The Ministry in reply stated that most of the procurement delay in these specific cases were circumstantial, viz couple of cases were refloated twice, cases converting to resultant single tenders etc. These are the basic equipments having life span of around 15 years required for regular research work and were being utilised even after completion of the project. The value for money was partially achieved during the project. In order to overcome delays in procurement, a new schedule of delegation of financial power was issued in

July 2010 which had bestowed higher power for procurement for the project Directors/Lab Directors. The fact that equipments can be used for regular R&D activities being basic equipment is no justification to procure them for this project after it was completed. It could be procured from build up grant when required. It would appear that the cost estimates for the project was highly exaggerated as the project could be completed even without equipments worth `1.52 crore. Toovercome abnormal delay in procurement, inherent weakness in the system of procurement also needs to be looked into. 

6.3 Development of a Modular Bridge below requisite specification Non execution of Project for Modular Bridge on specification recommended in statement of case based on which sanction was accorded resulted in wastage of assets created for ` 21.46 crore as users did not accept the bridge.

A feasibility study on Modular Bridge was carried out by Defence Research and Development Establishment (Engineers) (R&DE) (E) in August 2002. The study was based on the requirement projected by Army in General Staff Policy Statement (GSPS) of 1993. The salient feature of the bridge was single span up to 46 metre with Military Load Class 70 (MLC 70). Based on the recommendations given in statement of case for Modular Bridge 46 metre with MLC 70, the Ministry of Defence accorded sanction in October 2002 for execution of the project at a total cost ` 24.25 crore. The work was to be completed by R&DE(E) within 4 years from the date of allotment of project i.e. by October 2006. In May 2006, R&DE (E) sought extension of probable date of completion (PDC) of the project by two years, i.e. up to October 2008 due to technical difficulty in execution. Ministry accorded sanction for extension up to October 2008. In October 2007, the R&DE(E), against the 46 metre span and MLC 70 bridge, submitted Trial Report to Defence Research & Development Organisation Headquarters (DRDO) for 20 metre bridge with 40 MLC, which was not acceptable to the users and as such in March 2008 E-in-C Branch requested Directorate of Interaction with Services for Business (DISB) of DRDO HQ to accept proposal of 10 Modular Bridge ‘Buy Global’ at a cost of ` 600 crore to fill the operational voids as R&DE(E) had not developed requisite specification Bridge. Again the PDC of the project was revised in two spells upto December 2009.During this time the R&DE (E) developed 40 metre MLC 70 Modular Bridgenand technical trials were held from January 2008 to December 2009 and the bridge was found ready for traffic but the user requirement of 46 metre MLC 70 was not fulfilled. R&DE (E) confirmed that know how developed for Modular Bridge would be useful in future development. In March 2010 R&DE(E) submitted Closure Report of the project to DRDO HQ and closed the project after having incurred an expenditure of ` 21.46 crore with the proposal to develop a 46 metre MLC 70 bridge to meet the requirement of General Staff Qualitative Requirement (GSQR) issued in September 2007. Hence, another project was sanctioned in January 2010 at a cost of ` 13.25 crore to develop 46 metre MLC 70 Bridge which is to be completed by July 2012. Thus, instead of adhering to the specification given in the feasibility study for Modular Bridge upto 46 metre MLC 70, R&DE (E) Pune developed Modular Bridge of 40 metre MLC 70 which was not required by users. The end result of development of Modular Bridge at 40 metre MLC 70 was that after incurring expenditure of ` 17.89 crore excluding cost of five carrier vehicles being used in next project, the requirement of the user could not be served. In February 2011 Ministry stated that as per feasibility study report the modular bridge was projected for MLC-70. But later on it was changed to MLC-40 on user requirement during quarterly interaction meeting held in August 2002 and clarification made by user in December 2002. The bridge can also take MLC-70 loads upto 40 M. Since the system was to be developed on an in-service high mobility vehicle which was tatra 8×8 at that time, only MLC-40 was possible due to counter weight problems during launching. While the development of MLC-40 was at an advanced stage the requirement of 46 M MLC 70 was projected in the final GSQR issued in June 2007. In the meantime tatra 10×10 vehicle got introduced in the services and DRDO is confident to develop 46 M MLC 70 system on tatra 10×10. After seeking clarification on this issue from user (E-in-C) it was stated that their requirement stands for 46 M MLC 70 but load class of bridge for spans of 46M to be MLC-40 and MLC- 70 upto span of 38 M may be possible because of technology limitation. Ministry’s reply and user clarification, both expressed limitation of technology for development of bridge 46M MLC-70. The details of the case, Ministry’s reply and clarification given by users reveal the fact that both the user and DRDO were aware that the bridge was being built for 40 M MLC 70 /46M MLC 40. Further DRDO had its limitations for construction of bridge 46 M MLC-70. Even though both the user and the designer were aware of the limitations of the project, neither of them took the initiative to foreclose the project. As a result even after incurring government expenditure of ` 17.89 crore, excluding cost of carrier vehicles to be used in next project, the users requirement of modular bridge after lapse of nine years remains unfulfilled.

 

AK Antony seeks probe into allegations against Abhishek Verma in defence deals

Rohini Singh, ET Bureau May 7, 2012, 12.51AM IST

NEW DELHI: Defence minister AK Antony has asked investigation agencies to probe into charges levelled against Delhi-based businessman Abhishek Verma, by his former partner, accusing him of acting as a middleman in several defence deals and parking over $205 million in accounts in a bank in the US.

“I have asked the CBI and the Enforcement Directorate to investigate the allegations. The defence secretary has also been asked to take necessary action,” Antony said.
These allegations have been made by C Edmond Allen, head of a New York-based company called Ganton Limited, in a series of letters to Antony. His charges cover purported dealings between Ganton, which Allen – a non-practising attorney – said was incorporated in the US state of Delaware on Verma’s instructions, and major equipment suppliers to the Indian armed forces such as Rheinmettal, Augusta Westland, Hellenic Defence Systems and Hawker Beechcraft.

A top CBI official said the investigations were at a preliminary stage. “We are in touch with Allen and have asked him to submit the documents in original,” said the official. He also said the agency is coordinating with the Enforcement Directorate as there were allegations of large scale money laundering.

Verma, the son of former Congress leader Srikant Verma, is an accused in the naval war room leak case where several sensitive defence documents were stolen and allegedly leaked to Thales, the maker of Scorpene submarines.

He has denied all charges levelled against him by Allen, and said documents implicating him have been forged. Verma said he had received a notice from the Enforcement Directorate asking for an explanation for the money in the accounts but was unable to comment since the matter was sub judice.

“As several petitions filed by me against C Edmonds Allen are pending in various Indian and foreign courts and these cases are somehow connected to alleged foreign exchange violations in which trial is going on in India under FERA Act for ten years, it will not be possible for me to comment as matters are sub-judice,” he wrote.

According to Allen, the escrow accounts belong to Verma but he had the right to handle them as a result of agreements signed between the two in April 2000 and February 2004. Allen has alleged that the money in these accounts has been obtained through illegal means and that Verma has acted as a middleman in several defence deals. Verma, in turn, has issued legal notices to Allen to return the money and a case has been filed in a district court in New York, according to documents reviewed by ET.
Verma, the son of former senior Congress leader Srikant Verma and MP Veena Verma has business links with Jagdish Tytler, a Congress Working Committee member and the party’s Odisha in-charge. Tytler’s fashion designer son, Siddharth, is a founder shareholder in a company along with a former director of Ganton, Arjun Arora. Siddharth Tytler had also signed a joint venture agreement with Ganton India.

Confirming this Jagdish Tytler also told ET that he knew Verma as his parents were colleagues of his. He denied any knowledge of defence deals that Verma is alleged to be involved in.
Tytler also confirmed being an arbitrator in a dispute involving Ganton and another company over nearly hundred acre of land in Noida which belongs to the Yamuna Express Industrial Development Authority.

People close to Verma say that the allegations levelled against him were at Tytler’s behest, a charge that has been strongly denied by both Tytler and Allen. Allen, however, told ET in an email that Tytler and Verma were very close but had fallen out recently over the Noida land deal.

Allen has also alleged that Verma has often flaunted his links with several powerful politicians which has supposedly ensured that no enquiry is initiated against him. Allen also claims to posses several sensitive defence documents allegedly emailed to him by Verma which show his ‘easy access within the government’.

Corruption Charges

The letters to Antony paint a picture of labyrinthine corruption in defence deals with Verma allegedly at the centre. Some of the documents linked to the case, were publicly released by India Against Corruption (IAC) in late April, a group linked to activist Anna Hazare, after Allen sent the documents to lawyer Prashant Bhushan. In a blog posting in New York Times dated April 27, Allen was quoted as saying that he had approached it after Indian authorities showed no interest in his allegations.

In a letter to Antony dated March 28, 2012, Allen alleged that German firm, Rheinmetall AG, paid Ganton $530,000 to reverse its blacklisting by India’s defence ministry. The money was supposedly paid through the firm’s UBS account in Switzerland, according to bank statements of Ganton Limited, and an invoice generated by the company.

Emails sent by ET to Rheinmetall officials did not elicit a response.

CBI to grill MoD officials in Tatra case

New Delhi, April 26, 2012, DHNS:
The Central Bureau of Investigation (CBI) is likely to quiz Defence Ministry officials in connection to the alleged irregularities in the supply of all-terrain tatra trucks to the Army.

Sources said the CBI has zeroed in on at least six Defence Ministry officials.

Besides, the CBI is planning to question BEML CMD V R S Natarajan once again, sources said, adding that the investigating officers were not convinced with Natarajan’s responses in the previous grilling session.

Meanwhile, the CBI has once again questioned Vectra Chairman Ravinder Rishi and some of his associates in connection with the surreptitious deal. The probe agency however clarified that besides Rishi, none of the persons questioned till now, is an accused in the case. “They are being questioned just to clarify facts of the case,” CBI officials said.

Tatra Sipox UK, owned by Rishi, had inked a deal with BEML in 1997, which was in alleged violation of defence procurement rules that specified “procurement should be done directly from original equipment manufacturer only.” The central probe agency has alleged that since Tatra Sipox UK was not the original manufacturer of the all-terrain trucks, the rule for defence procurements was violated.

CBI takes Tatra trucks probe to foreign shores

Neeraj Chauhan, TNN | Apr 26, 2012, 02.43AM IST

NEW DELHI: The CBI’s probe into the Tatra scam is spreading internationally, with the agency finding clues of a far more sophisticated web of money transfers than what was presumed until now. The agency is set to issue Letter Rogatories (LRs) to Hong Kong and Singapore, where it believes NRI businessman Ravi Rishi, the key figure behind Tatra trucks’ supply to the Indian Army, had complex financial operations, and some of which could be linked to the Tatra contract.

Army chief General V K Singh in his statement to the CBI had claimed that he was offered Rs 14 crore by Lt Gen Tejinder Singh on behalf of Rishi, and he was told that officers before him have collected similar bribes. It is possible, sources admit, that Rishi could have been transferring money across secretive tax havens to pay off some of his Indian contacts. CBI has already issued LRs to Czech Republic, Slovakia, the UK and Liechtenstein, seeking details of Rishi’s companies and trusts. Sources said Rishi has been operating companies in both Hong Kong and Singapore for the past several years, and may have been transferring money from these countries to tax havens and other destinations.

ToI has already reported that he operated at least one trust in Liechtenstein since 1986, and this trust had been controlling at least one of his Hong Kong firms.

Besides, the CBI has established that the “supply of Tatra trucks to the Army was very irregular since 1997” and that “indigenization process of the Tatra was very slow”, said sources, indicating that the noose may be tightening around some BEML officials.

According to sources, BEML chief V R S Natarajan failed to give satisfactory response on both the counts during his questioning by the CBI. On Wednesday, BEML’s director (finance), J B Diwale, was questioned for several hours. The CBI is now certain, based on documents from the UK, that Tatra Sipox was just an “agent” for the manufacturing company. Indian military procurement rules do not permit dealings with agents.

Background check on Tejinder by CBI

Neeraj Chauhan, TNN | Apr 25, 2012, 05.15AM IST

NEW DELHI: Probing the Tatra trucks procurement scam, the Central Bureau of Investigation is carrying out a background check on Lt Gen (Retd) Tejinder Singh as it prepares to question him later this week. The agency, sources said, has asked the defence ministry to provide all details related to Lt Gen Singh – files, his meetings and people who frequently met him. Sources said the agency was trying to establish Vectra chief Ravi Rishi’s link with Lt Gen Singh.

“To establish the bribery offer, we have to find out Lt Gen Tejinder Singh’s link with Vectra group. We will check files of MoD to know about people who visited him and documents signed by him when he was serving in the Army,” a top CBI officer said. The agency is also expected to convert the preliminary enquiry into the alleged bribery offer to Army chief General V K Singh into a regular case soon.

The agency has, meanwhile, collected around 64 files from Bharat Earth Movers Limited (BEML) to probe the Tatra scam. These files have details of proposals, tenders papers, technical examination documents, suppliers, supply orders and payments related to procurement of Tatra trucks since 1997 in the Indian Army. To understand these documents, two colonel rank officers are helping the CBI in the probe.

The agency is also looking at the “quid pro quo” angle in the Tatra procurement deal. It is probing whether somebody in the defence ministry or Army benefitted all these years for making sure that Tatra trucks were procured by BEML through Tatra Sipox (UK) only.

Meanwhile, the CBI on Tuesday again questioned Vectra executive Anil Mansaramani at its headquarters while another Vectra employee was quizzed in Mumbai. The Vectra employees are being confronted with several documents picked up from the defence ministry and BEML.

The Army chief has provided several documents to the agency and has assured that he would give more evidence. Gen Singh had claimed that Lt Gen Tejinder Singh had offered him a bribe of Rs 14 crore in his office on September 22, 2010 for clearing a tranche of sub-standard Tatra trucks. The agency has recorded the chief’s statement.