CAG blows holes in DRDO’s early warning planes

The auditor has said that operational requirements specified by the IAF were not met and added that there has been a 70% time overrun. (Representative image)

By Shaurya Karanbir Gurung, ET Bureau, Aug 08, 2018
After a Central Bureau of Investigation probe into corruption allegations, the Comptroller and Auditor General has also cast a shadow on an indigenous program for Airborne Early Warning and Control (AEW&C) system ordered by the Air Force.

In a detailed report, the CAG has stated that the project is yet to be fully realised even though it was conceived in 2002, leaving gaps in the IAF’s air-surveillance capability.

The auditor has said that operational requirements specified by the IAF were not met and added that there has been a 70% time overrun.

The central auditor also said selecting the Embraer aircraft as the platform created design constraints and caused the delays. It may be recalled that the CBI is probing allegations that kickbacks were paid in the Embraer aircraft deal that DRDO had struck with the Brazilian aircraft manufacturer in 2008.

The AEW&C is an airborne surveillance system which detects incoming hostile fighters, cruise missiles and drones much before ground based radars.

It also detects enemy troops build-ups, warships and directs friendly fighter jets during combat. The project for the indigenous development of the AEW&C of the IAF was approved by the Cabinet Committee on Security in October 2004 at a cost of `1,800 cr. The CAG, however, said that the project’s total cost up till August 2017 was `2,425 Crore.
Under the project, two AEW&C were to be supplied to the IAF. Banglore based Centre of Air Borne Systems (CABS) of the DRDO was the nodal agency for developing the system.

The CAG says that the IAF had accepted the first AEW&C in February 2017. “However, out of the 18 operational requirements specified by the IAF, eight parameters could not be fully achieved by the AEW&C,” said the CAG report.

Some of these operational requirements are the primary surveillance radar for scanning the airspace to detect targets, the secondary radar to identify friends and foes, and the self protection suite to warn about incoming weapons. The IAF insisted that the eight parameters should be met in the second aircraft. The DRDO agreed to meet five of them, while arguing that the remaining three would not impact operations.

Comments

Government asks CBI to probe in allegations of corruption in purchase of three Embraer aircrafts

By Express News Service Published: 15th September 2016 – The New Indian Express
NEW DELHI: The Central Bureau of Investigation (CBI) has started analyzing allegations of Brazilian aviation major Embraer hiring a UK-based agent and paying commissions to swing the $208 million deal for three Emb-145 aircraft inked with India during UPA rule in 2008.

The government had asked the agency to probe in allegations of corruption in the purchase of three Embraer aircraft for Defence Research and Development Organisation in 2008

The agency sources said officials are going through the reference and any decision to start a probe in the matter will be taken soon after analysing all the documents.

If the agency is satisfied that it has enough prima facie evidence to initiate an FIR, it will start or else it might register a preliminary enquiry to gather enough material for registering a regular case, they said.

Government had stated that the allegations were of a serious nature and the CBI will probe.

Defence Minister Manohar Parrikar had earlier this week said that, “If there is a criminal angle, then the CBI will probe as the Ministry cannot”. “If only procedural issues are involved, then the Defence Ministry can do an internal investigation,” he had said.

The deal for purchase of three Embraer aircraft during the UPA regime has kicked up dust with US authorities going into alleged payment of kickbacks. The deal has come under the scanner of the US Justice Department which has been probing Embraer for alleged payment of bribes to secure contracts.
Soon after, the reports of irregularity surfaced, the DRDO has already sought a report from the Brazilian firm, which has said it has been looking into graft allegations over the last five years.

DRDO investigation through report from Brazilian firm is a separate investigation. Parallel investigation has been started by CBI

The Special Investigation Team probing AgustaWestland bribery scandal will also probe this scam.

The deal was signed in 2008 between Embraer and the DRDO for three aircraft equipped with indigenous radars for AEW&C (airborne early warning and control systems). The first “modified” aircraft was delivered to DRDO in 2011, with the other two following later.

After several missed deadlines, the AEW&C project is now slated to be completed by December. Present DRDO chief S Christopher was the AEW&C programme director and head of the Centre for Airborne Systems (CABS) before he was chosen to head DRDO in May 2015 by the NDA government.

Sources claimed that role of the committee, comprised of officials from IAF and DRDO is also under scanner, which shortlisted the Embraer deal.

Brazil’s top newspaper, the ‘Folha de Sao Paulo’, had reported on September 8 that the possible bribery in the 2008 Indian deal was under the scanner of the US justice department, which has been investigating Embraer since 2010, after a contract with the Dominican Republic raised suspicion. The scope of the investigation has now been widened to examine Embraer’s dealings with eight other countries, including India and Saudi Arabia.