Tag Archives: report

Army causes Rs 13.48 cr wasteful expenditure for HEMRL: CAG

Sakal Times

SHASHWAT GUPTA RAY 
Monday, December 24, 2012 AT 12:14 PM (IST)

PUNE: The Army’s refusal to accept a modular charge system developed by the city-based DRDO lab High Explosive Materials Research Laboratory (HEMRL) has resulted in wasteful expenditure of Rs 13.48 crore for the DRDO, a recent report by the Comptroller and Auditor General (CAG) has said.
The modular charge system helps to enhance functioning of Artillery guns. The chapter titled ‘Unfruitful expenditure on development of modular charge system for field guns’ said that the DRDO undertook a Technology Development (TD) project for development of the modular charge system for 105 mm and 130 mm guns based on a request by the Director General of Artillery. This project was handed over to Pune-based DRDO lab HEMRL.
In the field of artillery guns, modular charge system was considered desirable over the existing bagged charge system in view various advantages.
“HEMRL developed the systems by spending Rs 13.48 crore and after successful technical trials offered both the systems (105/130 mm) in September 2010 for user trials. However, at that stage DG Artillery showed disinterest in the system since the field guns were nearing the end of their life cycle and were likely to be de-inducted from service over next seven to 10 years. This rendered the entire efforts and expenditure of Rs 13.48 cr unfruitful,” the CAG report said.
In reply to audit observation, the DG Artillery stated (May 2012) that DRDO had been asked to undertake the project at no cost implication to the Army and the systems were not accepted as the DRDO did not adhere to the timeline.
On the contrary, the DRDO Headquarters stated (July 2012) that the Army had been associated at each stage of development and kept informed of progress.
“The finger pointing by two organisations both under the Ministry of Defence, DRDO which is responsible for indigenisation and Army which is expected to put such indigenous weapons system to use, indicates that both the organisations within the same Ministry have been operating in silos,” the report said.
While the Army headquarters did not respond to a Sakal Times query on the matter, Director of Public Interface, DRDO Headquarters Ravi Kumar Gupta said that after the establishment of technology, R&D work was undertaken to apply it to field guns of the other caliber like 105 mm and 130 mm field guns.

CAG pulls up DRDO for irregularities in new projects

Agencies : New Delhi, Thu Nov 29 2012, 20:41 hrs The Indian Express

The CAG has pulled up the DRDO pointing out “deficiencies” and “procedural irregularities” committed by it in taking up new projects and splitting sanctions for them to bring it within financial powers of the organisation head.

“Scrutiny of project sanctions issued by DRDO revealed procedural irregularities relating to misleading nomenclature of sanction issuing authorities, absence of data base of sanctions and splitting of sanctions,” the CAG said in its report tabled in the Parliament today.

“The above audit findings underscore that the efforts of the Ministry of Defence to bring in transparency and objectivity in functioning of its departments remain unachieved as of now,” the report said.

The CAG noted that financial powers of Director General, DRDO and Secretary, Defence Research and Development were enhanced to the range of Rs 25 crore to 50 crore and Rs 60 crore to 75 crore respectively and both these offices are held by one person only.

“Audit of sanctions revealed non-adherence with established norms and procedures for issue, circulation and recording of sanctions authorising expenditure out of public funds for various purposes,” the report said.

On the splitting of sanctions, the Government auditor said, “We observed that after the enhanced delegation of financial powers in July 2010, sanctions were spilt up to bring them within the delegated financial powers of the DG R and D (DRDO Chief) that is up to Rs 50 crore in consultation with the Integrated Financial Advisor.

” “DRDO splitting such sanctions is tantamount to selecting financial advisor which clearly erodes the integrity and independence of financial scrutiny of expenditure proposals,” the report said.

The CAG noted that in some cases, the cost of DRDO projects was brought down below Rs 50 crore by reducing the number of deliverables and curtailing its scope enabling the DG, DRDO to issue the sanction within his delegated powers.

“Clearly projects were being split up to keep the sanction below Rs 50 crore,” it said.

The report said, “instead of obtaining the revised sanction for existing projects by approaching the competent financial authority at the next higher level, fresh projects were sanctioned.”

The project cases cited by the CAG included the Project Akashdeep of DRDO for developing indigenous Aerostat radars and Project ADITYA for the vehicles mounted high power laser directed energy weapons.

The report said the enhancement of delegated financial powers has resulted in concentration of financial powers with the DRDO headquarters which has a “tendency to split projects to avoid reference to higher CFAs.

” The CAG also noted that the DRDO “did not maintain a control register of sanctions issued and there excited no mechanism to track the number and total amount of sanctions issued for projects.”

“In absence of minimum control records, the possibility of sanctions being issued in excess of funds, splitting of sanctions, issue of multiple projects for the same objective could neither be ruled out nor noticed in normal course,” the report observed.

In the recent past, an internal audit report of the Defence Ministry had made similar observations there which were refuted by the DRDO saying they were only preliminary in nature.

 

Defence audit raises questions about scientific adviser’s grants

The CGDA has pointed out several infirmities in the grants sanctioned by V.K. Saraswat.

ABHINANDAN MISHRA NEW DELHI | 6th Oct 2012 – The Sunday Gaurdian

he Comptroller General of Defence Audit (CGDA) has raised questions about certain research grants and aids given by the Defence Minister’s Scientific Adviser, V.K. Saraswat, to undeserving societies headed by scientists. These questions have been raised during an audit of the Defence Research Development Organisation (DRDO), ordered by the Ministry of Defence. The projects are all part of the DRDO.

According to the report, Saraswat, the scientific adviser, sanctioned a grant of Rs 288 lakh to Professor V.U. Reddy of C.R. Rao Advanced Institute of Mathematics, Statistics and Computer Science (AIMSCS), Hyderabad for a project on a futuristic radar.

The CGDA has pointed out several infirmities in this sanction. Since Saraswat is the president of the society’s governing body, it was wrong on his part to sanction any grants to the society. More importantly, the society is known for its achievements in mathematics, statistics and computer science and “is not even generally connected with research relating to futuristic radars”. The society also does not have the necessary equipment to carry out such research and did not have the expert manpower when it was given the grant.

The DRDO sanctioned another grant-in-aid project costing Rs 298.17 lakh to another scientist from the same society, S.B. Ra, who is a co-principal investigator for the above project. The CGDA has questioned the sanctioning of large grants-in-aid to institutes that do not have the required number of researchers or even basic facilities like computers.

The audit has also questioned the way various DRDO chairs are being given to ex-DRDO employees. S.K. Salwan, an ex-laboratory director, was appointed to the Dr B.D. Nag Chaudhari DRDO chair for three years at a cost of Rs 83.064 lakh. Kota Harinarayana, former director of Aeronautical Development Agency (ADA), a DRDO sponsored society, was awarded the Dr D.S. Kothari-DRDO chair for three years at a cost of Rs 83.064 lakh.

As per the audit, no public notice was issued seeking applications for these highly paid positions. The appointment was made by DG, DRDO in a discretionary manner on the basis of nomination. Further, instead of paying a monthly remuneration, the DRDO released a sum of Rs 27.688 lakh each to both of them without deducting tax at source.

The grant to S.K. Salwan was released even before he joined the Dr B.D. Nag Chaudhari DRDO chair. The audit has recommended appropriate recoveries. It has further questioned the rationale behind leaving the ownership of intellectual property rights generated by research performed under this grant with the experts and not with the government.

MoD restricts DRDO chief’s fiscal powers

Josy Joseph, TNN | Sep 23, 2012, 12.16AM IST

NEW DELHI: The government has taken an unprecedented decision to impose severe restrictions on the financial powers of Defence Research and Development Organisation (DRDO) chief Dr VK Saraswat after an internal audit report and an ongoing CAG scrutiny raised red flags over many of his decisions.

The move is unprecedented in many ways since DRDO chiefs enjoy exalted position —one of them Dr A P J Abdul Kalam even went on to become the President. DRDO also enjoys a huge amount of autonomy because of the strategic nature of its work and is rarely questioned on its financial decisions.

The government has taken an unprecedented decision to impose severe restrictions on the financial powers of DRDO chief Dr VK Saraswat after an internal audit report and an ongoing CAG scrutiny raised red flags over many of his decisions.

However, all this has changed. Sources said the ministry of defence (MoD) has issued an order saying that the DRDO chief would have to take all financial decisions in consultation with the finance division of the ministry. Until now, DRDO chief could grant financial approvals of upto Rs 50 crore on his own, without having to consult with MoD finance.

The financial powers of DRDO chief were upped in mid-2010 through an order, which now the government believes was against the norms. The enhancement of his powers, especially as DG (DRDO) of upto Rs 50 crore where he only needed the concurrence of the financial advisor within DRDO, has now raised hackles in the government. The DRDO financial advisor reports to the DRDO chief.

Sources said the enhancement of DRDO chief’s financial powers went against the recommendations of an MoD panel headed by present Chief Vigilance Commissioner Pradeep Kumar when he was the defence secretary. They even allege that defence minister A K Antony may have been misled into approving the enhanced financial powers for DRDO chief in 2010.

Dr Saraswat holds three positions concurrently—scientific advisor to the raksha mantri, DG (DRDO), and secretary defence (R&D). Under the enhanced provisions, as DG (DRDO) Dr Saraswat can approve contracts upto Rs 50 crore without referring it to MoD. While, as secretary defence (R&D) Dr Saraswat has financial powers upto Rs 75 crore but would MOD finance approval. Over the last two years, Dr Saraswat had been approving most contracts in his role as DG (DRDO) without referring them to MoD finance.

The Comptroller and Auditor General (CAG) is believed to have sent a draft para of its ongoing audit, raising questions over the way many financial decisions within the Rs 50 crore limit was approved by DRDO chief, without enough oversight.

According to the new order issued a few days ago by the M0D with the approval of Antony, Dr Saraswat has been asked to exercise his financial powers, ranging between Rs 25 crore and Rs 75 crors, “with consent” of MoD (finance).

Chief Comptrollers (CCs) of DRDO have financial powers upto Rs 25 crore. They would continue to exercise their authority in consultation with the financial advisor of DRDO, sources said.

A special audit of the DRDO on the orders of Antony has also found that the powers to sanction projects delegated to DG (DRDO), CC (R&D)s and lab directors was granted on the condition that the projects should be cleared by the Defence Research Council. “There is no government letter constituting the DRC, its functions and powers. The DRC meetings are not formal. There does not seem to be any system of circulating Agenda Briefs to members,” the audit said.

The report pointed out that in many cases the expenditure incurred on scientists and other manpower deployed on a project is not included in the project cost estimates to keep the total budget under the financial powers available to Dr Saraswat and his other officers.

A project titled “product support and product improvement of Nag weapon system” at a cost of Rs 28.35 crore was sanctioned by Dr Saraswat “even though the CCS (cabinet committee on security) approved Integrated Guided Missile Development Programme is still not closed in so far as NAG missile is concerned,” the report says.

Dr Saraswat approved a project worth Rs 49.82 crore for design and development of elctro-optical sensors for air-borne platforms such as UAVs and Aerostats. This was done “by reducing the cost proposed by the Lab (Rs 70 crore) so as to bring it just under Rs 50 crore, which is his sanctioning power,” the audit said.

DRDO chief sanctioned a facility for electro-optical system testing at a cost of Rs 35 crore by “DG DRDO to create a facility, which is essentially required to meet the objectives of an already sanctioned project. However, the old project’s cost was not revised with the approval of appropriate CFA,” it added.

The DRDO report card

By Yatish Yadav and Nardeep Singh Dahiya 02nd September 2012 12:00 AM

CGDA secret audit blows the lid off several other projects

Nirbhay missile

Aeronautical Development Establishment (ADE BANGALORE): In December 2010, a project for ‘additional development flight trials of Nirbhay’ was sanctioned costing Rs 18.1 crore . This was overlapping with an ongoing project codenamed Nirbhay sanctioned in 2004 at a cost of Rs 48 Crore.

“Old projects PDC has not been extended nor has it been successfully closed. The sanction of Rs 18.1 crore as a new project was inappropriate,” the audit said.
In one of its observation on the same project, the audit said “The case also raises questions on the way project proposals are put up for sanction. How original proposal to develop NIRBHAY exclude its trial? No research and development project can be sanctioned without inclusion of trial of the developed products.”
Arjun tank
Integrated Arjun tank program was sanctioned to CVRDE in November 2010 at a cost of Rs 69.90 crore. However, several small projects have been sanctioned under ‘buildup’. Audit reports reveal that it was done to avoid going through competent financial authority, which is contrary to financial regulations.
NAG missile
DRDO sanctioned another project at a cost of Rs 28.35 crore while cabinet committee on security approved programme to develop NAG missile is still going on.
UAV Aerostat project
It was sanctioned by DRDO at a cost of Rs 49.82 crore by reducing the cost proposed by the lab (Rs 70 crore) so as to bring it just under Rs 50 crore, which is its sanctioning power.
Facet
Facility for Electro-Optical System Testing (FACET) was sanctioned at a cost of Rs 35 crore by DG DRDO to create a facility, which is essentially required to meet the objectives of an already sanctioned project. However, the old project’s cost was not revised with the approval of appropriate CFA.
Flop show
Akash, NAG & Trishul missiles
The troika of integrated Guided Missile Development Plan (IGDMP) failed to fire after burning thousands of crore taxpayer’s money for almost 30 years. Akash which started in 1983 failed to meet requirements of army but after some hard bargaining Air force inducted it in its arsenal.
NAG, failed the 53rd test in August 2012. The project was started at an original cost of Rs 388.83 Crore in 1983, which was later revised to Rs 1,771.43 Crore. Indian army was forced to buy costly Javelin missile from USA in 2009 after DRDO failed to develop the project even after 29 years. After successive failures, Trishul was officially shelved in 2008. It is now reduced as a technology demonstrator by the DRDO.
AGNI
The AGNI project was launched in 1983. The DRDO borrowed ISRO’s PSLV rocket to enhance firepower after it failed the initial tests before 1994. AGNI series of Missiles AGNI I and AGNI II with a range of 700 km and 2,500 km were inducted in the armed forces after successful tests. AGNI III with a range of 3,500 km is expected to be inducted in the army soon.
Parliamentary Standing Committee on Defence in its report in March 2012 observed that the maximum range of the missiles that have been handed over to the army is 25 km only. Government in its reply to the committee had stated that the Indian army is currently in the process of procurement of advanced long range missile system and upgradation of certain existing weapon platform.
LCA
The LCA project, launched in 1983,is still waiting for final flight. The DRDO failed to develop promised indigenous engine even after spending over Rs 17,000 crore. It is expected to achieve the lasted deadline by December 2013.
Consider the three biggest projects: developing a Main Battle Tank (MBT), a nuclear-powered submarine, and an advanced Light Combat Aircraft (LCA). The MBT project was launched in 1974. But the tank has failed to meet service-requirement tests. It is reportedly too heavy and undependable to be used in combat. The Indian Army prefers Russian tanks and says it will use MBTs for training, not operations. The nuclear submarine project, launched 31 years ago, is not yet finished despite an estimated Rs 3,000 crore spent on it. The reactor is apparently ready, but not tested with the vessel’s hull.
Kaveri Engine
The CAG in its annual report 2010-11 noted that government had already spent Rs 1,892 crore on Kaveri Engine development programme launched in 1986 to power the Light Combat Aircraft, Tejas. In 2005, the GTRE had indicated that it would not be able to develop the Kaveri engine on its own. Defence Minister AK Antony has told Parliament that the DRDO still has no time-frame to fully develop its Kaveri engine. He also said that the engine will be used in UAVs and marine applications.

The secret world of DRDO – The New Indian Express

By Yatish Yadav and Nardeep Singh Dahiya 02nd September 2012 12:00 AM

India is at war. Tejas fighters wheel over a smoke dark battleground, taking down enemy aircraft with their superior radar and missile capabilities. Lower still, Indian-designed helicopters are giving hell to enemy armour and troop formations with missiles and machine-gun fire. On the ground, mighty Arjun tanks lumber slowly across dunes, sure of their inpenetrable Kanchan armour even as they spew death through their 120 mm guns. Jawans crouch and advance with the tanks, firing three-round bursts from their INSAS rifles and lobbing bhut jholokia grenades at their foes. They are tireless, having imbibed performance-enhancing pills, and well-fed, having had spoil-proof parathas and self-heated packaged meals before battle.

This is what a DRDO dream looks like. However, a nightmare was revealed recently when Defence Minister A K Antony ordered the Comptroller General of Defence Audit (CGDA) to do a secret audit of India’s equivalent of the futuristic workshop of James Bond’s ‘Q’ — the Defence Research and Development Organisation that goes by the handle DRDO.

The highlights of the report are frightening. Here are some of them:

* DRDO has been developing equipment which is either sub-standard or have extended deadlines and additional budgets;

* Many of the projects have been sanctioned without the requisite government approval. Only 10 per cent of projects have come to the ministry for clearance;

* Corruption and nepotism exists in the upper echelons;

* There is an exodus of qualified scientists;

DRDO has challenged the findings but the Ministry of Defence (MoD) has taken cognisance of them. It will be ordering a review of the agency’s approval processes as well as that of the recent proposal to enhance the financial powers for DRDO chief V K Saraswat.

Waste products

Crores of rupees are spent on research that mostly flops

The CGDA audit findings raise serious questions on the capability of this defence outfit, which has an annual budget of Rs 10,500 crore. Established in 1958, it has a network of 52 laboratories nationwide, employing 5,000 scientists with about 25,000 support staff. But only 29 per cent of the products developed during the last 17 years are being used by the Armed Forces. The audit notes that in several cases, DRDO bought equipment from other companies after spending crores on R&D. For instance, the CGDA found that after spending two years and Rs 29.96 crore to develop satellite signal monitoring, DRDO ultimately bought the same from a public sector undertaking on a single tender basis for Rs 24.50 crore in April 2011. “If such technologies are indeed commercially available, where was the need of a development project by DRDO?” the audit asked. DRDO also spent Rs 6.85 crore to develop explosive detectors, which were offered to the army for Rs 30 lakh each. Foreign versions of these are available off the shelf for Rs 9.8 lakh per piece, a price that also includes repair and maintenance.

The CGDA report criticised the ‘joint development’ technology initiative of DRDO, calling it “import of older, foreign technology under the disguise of joint development.” The CGDA accused DRDO of promoting Israeli company M/S SCD without the mandatory formal transfer of technology agreement. Commenting on a DRDO deal to develop a higher format uncooled detector, the CGDA said: “DRDO shall be financing the development expenditure of `19.90 crore by releasing it direct to M/S SCD Israel. Basically, instead of doing development itself, DRDO is funding a foreign agency’s development effort, that too, without any explicit arrangements being finalised about ownership of intellectual property generated from such financing,” noted the CGDA. “Neither the production agency nor the users — mechanised forces of army — have been kept in the loop,” the CGDA report says.

With a chaotic record of arms experiments and eccentric choices of spending money on pickles and automated idli and dosa makers for aircraft carriers, the very reason for DRDO’s existence seems dubious. Says V K Mittal, a former senior scientist with the agency, “DRDO technology is almost two decades old. Two projects, namely Samyukta and Sangraha electronic warfare equipment, were partially inducted in the armed forces, but users felt these were outdated and more expensive than the latest technology available.” Meanwhile, the agency has developed many products that is meant for the soldier at the front: DRDO pickles made of semi-ripe berries and spices such as red chilli powder, cinnamon, cumin, cardamom, black pepper powder, and clovers, spicy potato parathas, instant kadhi mixes, cashewnut barfi, mutton vegetable korma, instant halwa mix, egg biscuits and instant upma mix are among its culinary achievements. The agency also successfully bred a region-specific hybrid goat using technology that mixed the genes of adaptive and meat traits through cross-breeding breeds such as Changthangi and Gaddi and Sirohi and Black Bengal goats. DRDO has also developed ‘Lukoskin’, a herbal care product for leucoderma and the performance enhancing drug Perfomax which is meant to “improve physical and mental performance in high altitude and hypoxic conditions.” In true 007 style, it has also developed a car coolant that will not freeze in extreme temperatures. The crores of rupees wasted in innumerable half-baked projects add up to quite a sum. In a separate report by CAG in 2011-12, the DRDO is criticised for spending crores on random research projects. In 2011, out of 55 high priority projects based on user-requirements, only thirteen went into production. A modular bridge, being developed for the army was shelved in 2010, after eight years of experiments and spending Rs 21.46 crore. Six months later, Rs 13.25 crore was sanctioned for another modular bridge project. The initiative to produce next generation laser weapons was closed down within a month after equipment was procured.

“We are dangerously behind our adversaries. China is far ahead in indigenous technology in both tanks and missiles sector. DRDO’s claim of modern technology is too old when it is delivered to armed forces. It is a big disappointment”, observes security analyst Major General (Retd) Afsir Karim.

Flop wonders

Institutions without qualifications are promoted

Defence minister Antony had asked the CGDA to investigate after receiving complaints on suspected manipulation in DRDO contracts, undue favor to some external vendors, and irregular appointments in the agency which runs a vast network across the country. Its annual budget has no audit verified document to show what value has been generated so far through its technologies. Under a very personal cloud is DRDO chief V K Saraswat. The CGDA has questioned why he granted Rs 2.88 crore to a mathematics institute to develop a futuristic radar when its scientists are not even remotely connected with research relating to the project. Incidentally, Saraswat is the president of the institute’s governing body. The audit also stated that the institute lacked expert manpower, and started recruitment only after getting DRDO funds that were released without due diligence. A Dehradun scientific lab was granted Rs 14 crore to develop a communication link, while the institute headed by Saraswat was also sanctioned Rs 2.98 crore to develop the same technology — it doesn’t have even basic facilities like computers for individual researchers. “It shows that the radar development project is being split in different parts to avoid going to the ministry and users with a proper full scope development programme,” the CGDA said. The DRDO understandably refutes the findings. “These are only observations. The laid down procedure of audit was not followed, and it was issued without authorisation. It is a one-sided report. We will give a point by point reply of audit findings. DRDO has achieved several milestones and that nobody is talking about, ” retorted Dr Ravi Gupta, DRDO’s official spokesperson. However, the CGDA report says that DRDO has tried to camouflage its failures in the name of secrecy and national security.

Says Commodore (Retd) Uday Bhaskar, former head of the Institute for Defence Studies and Analyses (IDSA), “The Government is not willing to discuss the Rama Rao committee report that talks about reforming DRDO. It shows that they are not serious about the decaying of a government institution, which in the last 30 to 40 years has completely disappointed the users. Money is being spent without any effect on indigenous programmes. I will appeal to Indian Parliament to take this matter and discuss the issue.”

Project black hole

DRDO has been spending fresh money on its own failed projects

The CGDA accuses the DRDO of functioning in a non-transparent manner. “There is no comprehensive database to find out the details of projects sanctioned for execution by the DRDO and how many has been declared as successful,” it said. Antony was also informed that DRDO has been operating as an authority unto itself, bypassing the MoD where many crucial expenses are involved: the agency comes under the ministry and its main objective is to develop a modern technology base and equip the defence forces with internationally competitive systems and weapons. During 2009-2010, DRDO sanctioned 702 projects costing above `50 lakh but only 102 research projects were referred to the ministry. The audit body also questioned the grounds on which DRDO authorities sanctioned new projects in the name of completing failed projects with questionable changes in scope to avoid ministry’s nod. For example, DRDO took up a project for development of counter mine flail (CMF) for T-72 tanks at a cost of `8 crore in December 2002. CMF is a device that creates a safe passage through a minefield by deliberately detonating land mines in front of the vehicle that it is mounted on. Army HQ revised the requirement in 2004, but DRDO continued with the old parameters and in 2008, the product failed tests. In spite of this, it was not closed and in February 2011, another new project costing Rs 49.85 crore was sanctioned for the same CMF project.

Armaments apart, the DRDO has been splurging 10 per cent of its annual budget on construction of offices and auditoriums. CGDA also indicted DRDO for unauthorised sanction of Rs 49.15 crore to develop a vehicle testing facility in Pune — mainly for civilian use — disregarding approval rules.

“There is a lack of transparency and accountability in the name of defence research. For decades, DRDO has been promising a lot to the armed forces but have failed to deliver. The top brass should be made accountable. Unless this happens, money will be squandered away on technologically outdated projects and the armed forces will be cheated,” says Mittal.

Meanwhile, there has been a huge exodus of scientists from the agency. Last year, 86 scientists took VRS. Says Gen Karim, “The functioning of DRDO is improper. In the next five years, the difference between our adversaries and us would be glaring. The MoD is not serious about reforming DRDO. A national blueprint is required for this.”

The swadeshi trap

Unplanned indigenisation leads to losses and aborted projects

In this situation, how efficacious are the agency’s multimillion-dollar projects? India purchases arms worth $6.9 billion from the US, making it America’s second largest defence client after the Saudis. The Congressional Research Service’s annual survey of global arms sales written by Richard Grimmett and Paul Kerr says India is fast upgrading its equipment from its Soviet-era arsenal. In late 1993, a committee headed by then Scientific Adviser to the Defence Minister and DRDO chief APJ Abdul Kalam had set the goal of 70 per cent of indigenisation in weapons production by 2005; DRDO has not moved beyond the 30 per cent it had reached in 1995. The passion for swadeshi is the principle behind the money being spent by the Indian government on DRDO. But most of DRDO equipment malfunctions or the projects themselves are yet to take off or are delayed, sucking in more and more money.

Rifle recoil: The mass produced INSAS rifle, meant to be the main rifle for the Indian Army has been known to malfunction in extreme conditions. The first known debacle was on August 7, 2005. As the evening shadows grew longer at the Royal Nepal Army’s Pili camp in western Kalikot district, about 550 km northwest of capital Kathmandu, Maoist fighters massed silently outside. The roads connecting the camp that housed about 200 soldiers — mostly employed in the construction of a new highway — had been mined. A little before 6 pm, over 1,000 Maoists attacked the camp. Armed with INSAS rifles, the Nepalese soldiers fought back, but in vain. By 4 pm, the Maoists had captured 100 soldiers, and executed 40 of them. Nepal blamed INSAS malfunctions for the disaster: “The rifles are okay if you fight for an hour or two, but are not appropriate for long battles. If we had better weapons, our casualties would have been much less,” said a Nepal government spokesman. In November 2011, the Ministry of Defence issued a tender for 66,000 assault rifles to replace the INSAS. The MoD wanted the new rifles to be able to switch calibres between the small, high-velocity 5.56 mm rounds the INSAS fires and the devastatingly powerful 7.62 mm rounds of the older FAL rifles.

The story of this short-lived rifle epitomises the drift in the way the DRDO works, and also between it and the armed forces. The DRDO took a decade to design the INSAS. A few years later, it was supplied to the Army throughout the later half of the 1990s. But the Army did not put all its eggs in the desi basket; it bought 100,000 AK-47s from Bulgaria in 1995 for its frontline units in Kashmir. The INSAS began rolling off the lines soon after, at a cost several times that of the Kalashnikov. When war broke out in Kargil in 1999, INSASs jammed; the transparent polymer magazines cracked. Its ammunition-conserving three-round burst went virally fully automatic. An oil spray glitch was detected. By 2002, the Army had ordered the Israeli Tavor 21 rifle for its special forces and the Galil for its snipers. This year, the Special Forces will induct US-made M-4 rifles, the Vietnam-era M-16’s newer version that US soldiers now use in Afghanistan. “DRDO products are half imported and half prepared here, which is dangerous. Defence is too serious business to be left to one party. It is the user — our armed forces — who will decide which product is useful. DRDO cannot claim success of a product sitting in the workshop,” says Gen Karim.

Air disaster: In the early 1980s, the Indian Air Force was over-reliant on Soviet-made MiG-21s, which would be phased out, beginning in the mid-90s. In 1984, the Aeronautical Development Agency (ADA), a national consortium of over 100 defence laboratories, industrial organisations, and academic institutions with HAL being the principal contractor, was created specifically to manage the Light Combat Aircraft (LCA) programme. The DRDO was to develop the plane’s flight control system, hi-tech radar, and engine. DRDO delivered on the flight control system. However, the radar was the one that was to be developed by Ericsson and Ferranti Defence Systems Integration for the Gripen, a topline Swedish fighter plane. DRDO decided to develop the radar at home, and started in 1997. In 10 years, cost escalations, delays and other serious problems grounded the project, which is now being developed with help from the Elta group, an Israel Aerospace Industries subsidiary. Kaveri, the engine of the LCA — christened Tejas by former PM Atal Behari Vajpayee — was to be developed by the Gas Turbine Research Establishment, Bangalore using prototypes made by General Electrics, USA. By 2003, it had to be abandoned for an upgraded version of the GE engine used in the prototypes selected to power the first pre-production Tejas. The Kaveri had, in the meantime, failed high-altitude tests carried out in Russia, and by 2008, was officially declared unsuitable. GE was selected to provide 99 engines that were even better than the ones used in the first LCAs. Mysteriously, 15 actuators of the aircraft that were part of the LCA’s integrated flight control system went missing in December 2008 from Heathrow, London. The Tejas has flown, and well, but with an Israeli radar and American engine. The Kaveri programme alone cost the nation about Rs 2,800 crore over 23 years; the cost overrun of the entire LCA programme is estimated at about 3,000 per cent.

Tanked hopes: It took 35 years to make India’s main battle tank Arjun. In 1974, DRDO’s Combat Vehicles Research and Development Establishment at Chennai started designing the tank expected to be ready for war in 10 years. The Arjun was to weigh 40 tonnes with a 105 mm main gun. By the time it was finished in 2000, the tank had grown in size to 58.5 tonnes with a 120 mm gun that can fire rockets. In terms of cost overrun, the Arjun is the champion of delay and drift: it has cost 20 times the initial estimate to make an Indian tank with a German engine. It is so big that ordinary Indian rail wagons, the ones that have been transporting our older Soviet- and British-origin tanks had to be redesigned to accommodate its bulk. Military planners say bridges will collapse under Arjun’s weight. The Army and DRDO have been at loggerheads over the Arjun. Field tests have varied wildly: some have given the Arjun a junk rating, and others say it’s the best thing to have happened to the Armoured Corps. The tank is a ‘jugaad’ queen. South African howitzers have been mated to its chassis to make a self-propelled field gun that DRDO calls Bhima. The army will, at last, add to its ranks about 250-odd Arjuns, and 1,000 T-90s. The next Indian tank, the Futuristic MBT, may well come from a joint initiative with Russia.

As the MoD prepares to review DRDO’s financial procedures, the news is not all bad on the achievement front. Last week, the 350-km range surface-to-surface Prithvi II missile was successfully flight tested at the Integrated Test Range, Chandipur in Odissa. Saraswat, a multitude of rings embedded with various stones flashing on his fingers celebrated by feeding laddoos to the army commander present. However, the question for him is, after the ministry’s review, what’s for just desserts.

Comments(1)
Sir, Compliments to the authors for a candid and ‘no-nonsense’ expose. Speaking from personal experience in the ‘Silent Service’, I would say that DRDO Projects that were headed by the ‘USER’ and had a multidisciplinary team under him – ACHIEVED SUCCESS. Examples : Sonar APSOH (1984) – and now the mainstay of the ASW fitment on surface combatants, and ‘AJANTA’ – an EW suite for surface ships. And, let me put it squarely – For the Navy, ‘indigenisation’ is an Article of Faith. Yet, the output of the three DRDO labs, attached with the Navy – NPOL (KOCHI), NSTL (VIZAG) & NCML (MUMBAI) have been MODEST, to say the least. Good show Sirs !! Regards
Posted by Capt.(retd) H.Balakrishnan, I.N. at 09/02/2012 09:35

DRDO spending crores, but no positive outcome

http://bit.ly/TymtzY 

http://ibnlive.in.com/news/drdo-spending-crores-but-no-positive-outcome/282007-3.html

Bhupendra Chaubey, CNN-IBN

New Delhi: The Defence Research and Development organisation, country’s premier body for development of defence related technology, has allegedly spent crores of rupees in the name of expenditure on technology, but there has been no positive outcome.
A top secret audit of DRDO ordered by Defence Minister AK Antony has revealed that there is virtual lack of transparency in decision making mechanism in the organisation, which was created to look after country’s defence needs. With a budget of over Rs 10,000 crore DRDO has enjoyed full mandate from successive governments for over six decades.
The audit accessed by CNN-IBN reveals that financial sanctions are being split so that they don’t have to go to higher authorities. Programme for development of main battle tank Arjun was sanctioned at Rs 69.99 crore. However, the entire programme was split into smaller sub-heads so that higher ups within the system could be avoided.
The fact that projects under DRDO have been delayed extensively is well known. Now the report also raises questions about how the DRDO is taking decisions.
Product support and product improvement of NAG weapon system was sanctioned at a cost of Rs 28.35 crore, despite the fact that the Cabinet Committee on Security approved similar programme was still in the pipeline.
The cost of UAV and aerostat was brought down just to ensure that no higher authority could question the financial approval given.
Several split sanctions were also issued for renovation of DRDO Bhawan while unauthorised sanction of Rs 49.15 crore to develop vehicle testing facility from public accounts mainly for civilian use was also granted.
The report further says that a project for development of satellite signal monitoring was sanctioned at a cost of Rs 29.96 crore without any formal requirement from the defence services. While the project was still on, a sanction of Rs 24.5 crore was given for procurement of a similar technology.
There have been several arbitrary costing of products under garb of development like sanction of Rs 14.5 crore for development of four stroke cylinder engine technology. But the parties chosen by the DRDO didn’t have adequate research capabilities. The report goes on to say that the DRDO has facilitated entry of foreign companies in certain areas and the projects being undertaken are not for development but for the entry of foreign vendors.
The report says that Dr VK Saraswat gave an improper approval for a grant of Rs 2.8 crore to a society which he heads himself. Further scrutiny even revealed that the body which got the aid didn’t have expert manpower.
Several irregularities have also been detected in appointment of chairpersons of different organisations with huge amounts being spent on it.
However, the defence minister has refused to react to these findings.
On the other hand the DRDO has refuted the allegations.
“DRDO strongly refutes observations made in the report and is in the process of compiling its responses despite the fact that the findings of audit already stand vitiated. Since laid down procedure was not followed and the report was issued without authorisation, the matter is under examination and correspondence with the concerned. All laid down procedures are being followed by DRDO in a transparent manner and interests of the State are the sole consideration during the process of decision making,” said DRDO Director Ravi Gupta.
Now through this report questions are being raised about how DRDO is taking decisions.

Secret audit reveals DRDO irregularities

Secret audit reveals DRDO irregularities

TNN Aug 14, 2012, 03.14AM IST

NEW DELHI: A confidential internal audit ordered by the defence ministry has found several financial and other irregularities in the functioning of the Defence Research and Development Organization (DRDO), which has a network of 50 labs and an annual budget of over Rs 10,500 crore.

 

This comes a day after TOI reported that none of the main recommendations — first by the Rama Rao Committee in 2008 and then a watered-down version by a committee headed by the defence secretary in 2010 — has been implemented to revamp DRDO to ensure that advanced weapon systems are developed for the armed forces without huge time and cost overruns.

The fresh internal audit, conducted by the finance wing of the defence ministry, has raised serious questions about the lack of transparency in DRDO’s functioning, including the alleged sanctioning of Rs 2.80 crore by DRDO chief V K Saraswat to a mathematical society headed by him.

 

DRDO spokesman Ravi Gupta, on being contacted, said the issues raised in the report were “essentially in the nature of preliminary observations” and the audit itself was “vitiated by a faulty process”. “None of the points raised in the audit report stands scrutiny… We are giving a point-wise rebuttal to the baseless conclusions,” he said.

 

The audit report also pointed out that DRDO was splitting sanctions for its projects to avoid seeking approvals from “competent financial authorities”.

Readers comments

Polachan Vm (Egypt)

8 days ago

….if all the black money and the corrupt money is confiscated, we can buy USA three times. ..luckily our leaders and judges are thieves..wishing all poor Indians a very happy Independance day…  9249850342 ..former thief justice..

myalmightygod (India)

9 days ago

God bless india.

Raghubir Singh (Pune)

9 days ago

Internal audit is one of the healthy procedures to have financial checks and balances in place and every government department has such auditing as a matter of routine even in ops units in forward areas. There is nothing secret about it. As a first step there are preliminary observations-majority of which get settled after the explanations are given at working level showing relevant file/documents/authority etc. We can delve on two point’s including MBT Arjun being overweight which has also found mention in the preliminary observation. Best MBT’s of the world like US’s Abram, UK’s Challenger, Germany’s Leopard & Isarel’s Merkava having crew of four all weigh in the region of 62-65 tons as compared to 58 tons that of Arjun with four crew which is great feat in weight management! MBT Arjun has withstood enough flak for decades & proven its merit in the desert trials pitted against blue eyed T-90. But eventually DRDO would have to develop newer third generation tank as China has done. Splitting the sanctions is generally to win race against time for projects which otherwise would get stuck up in red tapes -for which there should be red carpets to roll on smoothly? Splitting by remaining within limit is permissible and let us not grudge this financial authority bestowed on authorities like Directors.

spot on (Paris) 9 days ago

DRDO Chief V K Saraswat was first one to vouch for the Tetra Trucks performance and suitability when former Army gen VK Singh blew the scam in the open. Once scam thickened and stink ed too much, this guy faded in the air. CBI and media doing good work for the khangress family. My friend worked for many year for DRDO and he told me that most of the project engineers outsource work to companies formed by their own family members. Please probe middle management too to show the rot.

dasg (NY) replies to spot on 8 days ago

No wonder the morons continue to buy 70% of the weapons, unmatched by any nation with even 50 million let alone 1200 million. VK Singh remarks must have sent shiver down this crook Saraswat’s spine. But nothing will happen, whole edifice is rotten, and as a result honest people like VK Singh are cast as vilians and crooks like Saraswat are applauded.

dasg (NY) 9 days ago

Ha ha ha Mathematical Society! Good one. Corruption thy name is Indian. But then he is thinking if Sonia, Kamadi, Kanimozi, Raja, Laloo, Pawar and almost everyone why not me. ISRO Nair too made enough. The whole edifice has become rotten to the core.

Mohan (London) replies to dasg 8 days ago

I will like to share my personal experience about DRDO. I have an international reputed Masters in science from one of top European university.I studied from top 10 Indian engineering college. I am working abroad in a research lab, applied for a job @DRDO; they didn’t even select me. While most of the scientists who work in DRDO are below average, lack any capability to produce anything substantial, they wont choose NRI candidates as they believe in corruption. Dumb engineers and scientists want to maintain their status quo without delivering any result!!

bg (hyd) replies to Mohan 6 days ago

“yet another these are sour grapes story”

dasg replies to Mohan 7 days ago

Well Indian or for that matter local recruitment is based solely on your abilities, in India foremost your contacts. That is 1200million people, have not single University among top 100 let alone top ten in the world. They are now being beaten black and blue by China. You have dull people and lazy people, dull people vote along caste/parochial line people like Laloo, Maya, Mulayam, Kuruanidhi, Raja who support crooks like Sonia, Rahul. So its is dullness of mind that they adhere to divisive, highly detrimental and dangerous casteism. Lazy people are middle class who cant up their fat backside to participate in the electoral process even to the extent of casting vote.

DNA special: MoD audit questions DRDO functioning

DNA special: MoD audit questions DRDO functioning

Published: Wednesday, Aug 15, 2012, 10:00 IST

By Pradip R Sagar | Place: New Delhi | Agency: DNA

Years after the CAG tore into DRDO and its functioning, a special audit has once again exposed the organisation and its chief, VK Saraswat, blaming him for passing on funds to a society in a clear case of conflict of interest.

The audit, conducted on the orders of defence minister AK Antony, has come down on the ‘arbitrary’ functioning of the DRDO (Defence Research and Development Organisation).

The audit has highlighted questionable approval by scientific advisor to defence minister, Saraswat, of grant- in-aid of Rs2.9 crore to an academic institution he heads.

According to the report, accessed by the DNA, Saraswat sanctioned a grant of Rs2.88 crore to Hyderabad-based Advanced Institute of Mathematics, Statistics and Computer Science (AIMCS) for research of futuristic radar systems.

Raising infirmities in the sanction, the audit report says, “AIMCS comprises scientists known for their achievement in mathematics, statistics and computer sciences and is not even generally connected with research relating to futuristic radars. And it (AIMCS) does not have any equipment and other wherewithal to undertake such research and development.”

The report says DRDO’s Bangalore-based LRDE (Electronics and Radar Development Establishment) is specifically meant for the evolution of the technologies relating to radars and has required number of scientists and equipment for conducting research of radars.

“It was thus strange to entrust this work to a Hyderabad-based academic institute. Further scrutiny has revealed as the grantee body did not have expert manpower, it started recruiting them after getting money from DRDO, which was liberally disbursed on annual basis.”

The report claims that release of advance payment to the society even for salary in respect of non-existent manpower blocks government funds and provides an opportunity to private society to earn ‘interest income’.

“DRDO is hiring a consultant and the consultant is also planning to hire consultants. This does not seem to be reasonable. Whether recruited personnel had DRDO connection needs to be seen further.”

The internal audit report prepared by senior additional controller general of defence account (ACGDA-Internal audit) maintained that DRDO has undertaken research project relating to radars and part of this research project was offloaded to a private society.

“As such it is only a sub-project of a main project. These facts were not however brought out in the file concerned.”

Interestingly, the report has also questioned another grant-in-aid of Rs3 crore to Dr SB Rao of the same institute, who is co-principal investigator under this radar research project. “A comparison of cost estimates between two projects suggested the possibility of different norms being adopted for costing and possible duplication.”

Comments

Raghubir Singh from Pune

Mathematics and statistics are much relevant like computers in radars as should be evident from some books on the subject. As such on the face of it Advanced Institute of Maths, Statistics & Computer Sciences (AIMCS) seems to have adequate credentials to carry out research in these areas relating to radar engineering? Generally research scholars are hired only after funding is available. For achieving self- reliance in defence , which should be our top priority now , it would be essential to encourage academic and other reputed institutions to take up research in areas which can have military applications. This is the model for defence research followed in other advanced countries including in the US which should suit us too? Now that DRDO is notching successive successes on daily basis–discomfiture of import lobby is understandable and this leakage of secret audit report hopefully is not to slow down the momentum?

Reply | Report abuse       Posted on: Aug 17, 2012 6:34 IST

Raghubir Singh from Pune

Mathematics and statistics are much relevant like computers in radars as should be evident from some books on the subject. As such on the face of it Advanced Institute of Maths, Statistics & Computer Sciences (AIMCS) seems to have adequate credentials to carry out research in these areas relating to radar engineering? Generally research scholars are hired after funding is available. For achieving self- reliance in defence , which should be our top priority now after revelations how the import lobby has tentacles everywhere including in our DPSU’s, it would be essential to encourage academic and other reputed institutions to take up research in areas which can have military applications. This is the model for defence research followed in other advanced countries including in the US which should suit us too? Now that DRDO is notching successive successes on daily basis–discomfiture of import lobby is understandable and this leakage of secret audit report is not to slow down the momentum-hopefully?

Reply | Report abuse       Posted on: Aug 16, 2012 8:47 IST

Raghubir Singh from Pune

It is not correct to say that there is no connection between mathematics, statistics and computer with radar. We can glance through ‘Mathematics of Radar’ by Bill Moran to feel some impact of mathematics on radars. In fact there are large number of books on mathematics of radar, synthetic aperture radar & tracking radar etc. Similarly probability of detection & statistics thereof do form important aspects of radar and need to be explored. Therefore AIMSC with its mathematics, statistics & computer credentials should be able to do research in these important areas relating to radar Futuristic radar or any other such system can see the light of the day only if we encourage academic or research institutions –not necessarily only govt labs to explore domains which have defence applications. To carry out, presumably theoretical work to begin with –the Institute would not need radar system which if required should be available in DRDO labs in Hyderabad? Research work is not production line –it needs new thinking, newer approaches and interfacing of academic, institutional and defence research work for military usage. The auditors & learned author can see

the research models in US & other countries. For sure research scholars for the project can be recruited only after funds are available

Defence ministry report slams DRDO chief

Defence ministry report slams DRDO chief

14 Aug 2012Hindustan Times (Bhopal)

NEW DELHI: Defence Research and Development Organisation chief VK Saraswat sanctioned R2.8 crore to a mathematical society headed by him, an audit report has revealed. The report prepared by the defence ministry’s finance wing has also dealt with issues of transparency and shortcomings in projects developed by the organisation.

Defence ministry audit questions DRDO functioning

New Delhi: An internal audit report ordered by the defence ministry raised questions over the functioning of the DRDO and the grant of Rs 2.8 crore by its chief VK Saraswat to a society under him.

The report prepared by the finance wing of the defence ministry raised several issues in its review and the transparency of the research agency with a budget of over Rs 5,000 crore, defence sources said in New Delhi.

The report has questioned the grant of Rs 2.8 crore by Saraswat to a mathematical society.

The report has also pointed out that to avoid seeking approvals from the competent financial authorities, the DRDO was splitting the sanctions for its projects, they said.

It has also cited shortcomings in the products developed by the DRDO such as the Arjun tank, which has been found to be overweight by the Army for operations in certain areas along the border.

However, the DRDO said the issues raised in the report “are essentially in the nature of preliminary observations” and it was “vitiated by a faulty audit process”.

“Such preliminary observations are required to be formally issued and replies to the same should be sought prior to compilation of any report. Only if the replies are not satisfactory is the next step of making a preliminary report taken.

“In the extant case, the laid down procedure was not followed and to that extent, the process of audit stands vitiated. Thus, even before seeking replies of DRDO, presumption and baseless conclusions appear to have been arrived at,” DRDO spokesperson Ravi Gupta said.

PTI

DRDO ‘develops’ blatant financial irregularities

Published: Friday, Aug 17, 2012, 9:00 IST

By Pradip R Sagar | Place: New Delhi | Agency: DNA

The ministry of defence’s special audit has found blatant irregularities in the Defence Research Development Organisation’s handling of finances.

The special audit report, accessed by the DNA, reveals that financial sanctions are being split so that they do not require approval of higher authorities.

The audit carried out by Comptroller General of Defence Audit on the direction of defence minister AK Antony has found that key projects costing over Rs300 crore were tweaked by the DRDO to get them sanctioned without approaching the concerned financial authorities.

“DRDO authorities have sometimes used delegated powers to sanction supposedly new projects to complete the work taken up under ongoing projects, instead of going to the concerned financial authority for revision of cost of the old projects,” the audit report claims.

For instance, programme for development of main battle tank Arjun was sanctioned at Rs69.99 crore in November 2010. But the DRDO authorities changed the entire programme and split it into smaller sub-heads and several procurements were sanctioned under ‘build-up’ so that higher authorities within the system could be avoided. This shows that a coordinated attempt to avoid going to higher financial authorities, which is contrary to financial regulations,” the auditors observed.

Similarly, despite having a comprehensive five-year programme sanctioned for human performance enhancement in May 2009 at a cost of Rs34.56 crore, the director of Defence Institute of Physiology & Allied Sciences (DIPAS-DRDO), has managed to get approval for additional projects over the already sanctioned project. Such practice defeats the very purpose of making projects/programmes,” the report added.

Another project called ‘Product support and product improvement of NAG weapon system’ was sanctioned at a cost of Rs28.35 crore by VK Saraswat, director general of DRDO, despite the fact that the Cabinet Committee on Security approved similar programme was still in the pipeline.

Audit report also pointed out an unjustified cost reduction by DG, DRDO for a project for design and development of electro-optical sensors for air-borne platforms (UAV and Aerostat) at a cost of Rs49.82 crore.

“Director General, DRDO has reduced the cost from Rs70 crore as proposed to Rs49.82 crore so as to bring it just under Rs50 crore, which is his sanctioning power,” the special audit report claims.

Under scrutiny of accounts, the audit also found anomalies in facility for elctro-optical system testing (FACET). “FACET was sanctioned at a cost of Rs35 crore by DG, DRDO to create a facility, which is essentially required to meet the objectives of an already sanctioned project,” the report added.

The audit report also observed several split sanctions were issued for renovation of DRDO Bhawan in New Delhi while an unauthorised sanction of Rs49.15 crore to develop vehicle testing facility in Pune from public accounts mainly for civilian use was granted by the DRDO authorities