Category Archives: Drdo

Bio-toilet Issues

Posted by: Clean India Journal – Editor May 10, 2016 in News

Having received a number of complaints on non-functioning of installed bio-toilets like choking of pipes, improper ventilation in toilet, incursion of non-biodegradable materials, use of excessive acid, usage of more people than the prescribed limit, bio-toilets remained unutilized for more than six months required seeding with fresh bacteria and so on, DRDO has rectified all the problems and the same has been updated to all the concerned channels. This was informed by the Defence Minister, Manohar Panikkar in Parliament.
The IR recently allotted Rs195 crore for the current fiscal as part of a larger Rs2,450 crore plan to install 40,000 toilets in 24,500 coaches, spending Rs10 lakh for each coach.

Disadvantages caused due to Bio-toilets introduced in the passenger coaches of Indian Railways – NFIR

National Federation of Indian Railwaymen
3, CHELMSFORD ROAD, NEW DELHI – 110 055

No.II/34/Pt.12

Dated: 10.8.2015

The Member Mechanical,
Railway Board,
New Delhi

Dear Sir,
Sub: Disadvantages caused due to Bio-toilets introduced in the passenger coaches of Indian Railways reg.

The concept of bio-toilets in passenger carrying coaches was given shape by the Railway Ministry some time in the year 2011 when in a few coaches of’ passenger carrying mail/express trains, the bio-toilets were first introduced. NFIR understands that the Railway Ministry plans to fit bio-toilets in all passenger coaches by 2021.

Federation has been receiving number of complaints from the C&W Staff on malfunctioning vis-a-vis disadvantages of the bio-toilets. In this connection, NFIR having gone into the complaints received from the C&W Staff, noticed the following problems which may cause serious health hazards to staff.

The bio-toilet system is very sensitive. It has more than 100% chances of choking even with a bit of ‘Pan Gulka’ spitted in the toilets by the passengers knowing or unknowingly if not flushed properly by the passenger in the moving or stationary trains. Choking in these toilets also takes place due to throwing of Napkins, Cigarette buds, Gutka Pouch, Ladies pads, Plastic Water Boltles or their covers, liquor boltles and garbage of food stuff by the passengers resulting toilet pans and leading to public complaints. This situation has been causing tremendous pressure on staff for no fault of theirs.

The ball-valve provided which should function to drain out the waste to the ground by operating a connected pedal, never works due to faulty design. It is also reported that designs differ from one manufacturer to another, causing problems in procurement of spares.

The RDSO designed simplified standard mechanism to operate the ball valve be not compatible with old designs.

It has been further complained that improper trials of revised versions/modifications before implementation has been the real problem in procurement of spares and has been creating confusion among the Supervisors and Staff in the course maintenance.

The C&W Supervisors and staff working in pit lines have been facing lot of inconvenience during under gear maintenance, examing brake beam, brake
block hanger, brake shoe assermbly, brake blocks, Safety wire rope & their pins, bogies frames and also facing serious inconvenience in piston stroke brake cylinder which faces tank of quite a big size and leaves narrow gap.

Bio-toilets required inspection & maintenance to ensure working of Ball-Valve & its operation linked with p-trap and Hose Connector, mounted and fitted in the narrow gap of the top surface of the tank and trough floor of the coach. C&W Engineers and Staff have been put to lot of difficulties during maintenance and have been subjected to more physical mental stress in day-to-day working. While working are being compelled to inhale foul smells emanating from the choked tanks containing human waste and have started acquiring diseases.

The process of draining out or the choked tanks generates unbearable filthy smell creating inconvenience to other technical staff working on other under gears and at times diverts their attention and Compels to ignore the necessary safety repairs due to bad work environment.
At present we have this system only on 10% of the coaches, causing serious problems. ‘The height of the problems can be measured when 100% coaches will have this system and will it be possible for staff to function? The C&W Supervisors and Slaff are reported to have become like human scavengers. It is worth-mentioning that the Government of India had banned scavenging in the year 1993 consequent to the directions given by the Apex Court through various judgements.

Federation has further been given to understand that as per Railway Board’s guidelines effluent test is required to be conducted to over 5% population of each type of coaches at an interval of 3 months and is to be conducted by the expert laboratory Staff. Unfortunatety, the Railway Authorities, instead of using Lab Staff for the said purpose, have been pestering C&W Staff to collect effluent from Bio-Tanks for conducting test in some Depots like Gwalior, despite the fact that this job is not related to C&W staff.

Federation notes with disappointment that the ‘Bio-toilet’ system introduced on the I.R. is claimed to be environment friendly but it is not so. particularly for the C&W Supervisors & Technical Staff of Mechanical Department.

NFIR, therefore. requests the Railway Board (MM) to kindly see that thorough review is conducted before proceeding further for introducing Bio-toilets in coaches.

Yours faithfully,
sd/-

(Dr M. Raghavaiah)
General Secretary
Source: NFIR

Toilets on trains: Some issues that need attention

October 18, 2014, Economic Times Blog
Ever since the Railway Committee started its work, whenever people run into me, even if it is at a social occasion, they buttonhole me and offer suggestions about what should be done to improve the Railways. This is understandable and desirable, since it is a manifestation of interest in the Railways. Often, though not always, these are complaints about passenger amenities, or their lack, and suggestions about improving these. Passenger amenities are only one aspect of improving the Railways, though this is visible, and is representative of most citizen interface with the Railways. Toilets figure towards the top of any average complaint list, toilets in stations and toilets on trains. For the moment, let me confine myself to toilets on trains. As everyone knows, Indian trains began to function from 1853. But toilets on trains had to wait till 1909. There is an oft-quoted, and therefore somewhat clichéd letter, written by Okhil Chandra Sen to the Deputy Superintendent of Sahibganj in 1909, familiar to all those who know about Indian railway history. The original letter is in the National Railway Museum, Delhi. This led to the introduction of toilets on trains.
Here is that self-explanatory letter. “Dear Sir, I am arrive by passenger train Ahmedpur station and my belly is too much swelling with jackfruit. I am therefore went to privy. Just I doing the nuisance that guard making whistle blow for train to go off and I am running with LOTAH in one hand & DHOTI in the next when I am fall over & expose all my shocking to men & female women on platform. I am got leaved Ahmedpur station. This too much bad, if passenger go to make dung that dam guard not wait train minutes for him. I am therefor pray your honour to make big fine on that guard for public sake. Otherwise I am making big report to papers.” Sahibganj (in Jharkhand) has seen better days, from the Railway point of view. It is no longer on the Howrah-Delhi main line. Ahmedpur is in West Bengal and Mr Sen must have travelled along the Bardhman-Sainthia section of what is called the Sahibganj loop.
IR (Indian Railways) has around 50,000 passenger coaches, a little less than 50,000 if you exclude EMUs (electric multiple units), a little more than 50,000 if you include EMUs. So these have to be fitted with toilets, say 4 per coach. This blog is only about toilets, not about cleaning and maintaining them. If it’s a short-distance train, you might legitimately argue you don’t need 4 toilets per coach. 2 might do and you might make them even more basic than those required for long-distance. Traditionally, IR toilets have provided for water and the waste has been discharged onto tracks. That’s a terrible idea from the sanitation point of view, especially when on a train is at a station. Tracks are corroded and so are fittings on the under-carriages. Why can’t we have toilets on trains that are like those in the West? What about the West? In some places in the West, you have what are called controlled discharge toilets (CDTs). These store waste in tanks and discharge them when the train attains a minimum speed. Three problems with these. First, you are still discharging on tracks, which is what you want to avoid. Second, these require trains to attain a minimum speed. Sometimes, trains don’t pick up that minimum speed at all.
Alternatively, at the other end, when a station has a long platform, the discharge begins before the train has left the station. Third, CDTs don’t work well when people use water, as opposed to toilet paper. Hence, no CDTs, though they have been used on Rajdhani, Shatabdi and Duranto. Almost 3000 coaches have actually been fitted with CDTs. Moving on, at best, on better trains (where people don’t use that much water), you can have tanks that don’t discharge, but have tanks that are cleaned. This is what happens with planes. However, with the large number of passengers who travel on trains, this won’t work except on short-distance trains, and those where people are unlikely to use water. Even if this were to be attempted, coaches need redesigning.
Therefore, IR has now veered around to bio-toilets, designed with DRDO collaboration. Bacteria decompose the waste. Some stuff is released as carbon dioxide and methane into the atmosphere. Whatever is left is chlorinated and disinfected liquid that can be released onto the tracks. In tests, the effluent hasn’t had any toxic effects on rats and fish. Since 2011, almost 5,000 coaches have been fitted with these bio-toilets, on Express trains like GWL-BSB Bundelkhand, GHY-MAS Egmore, Indore-Gwalior, Lucknow-Mumbai Pushpak, Jammu Tawi-Indore, NZM-Indore Malwa, NZM-Indore Intercity, Mumbai-BSB Mahanagri and Kochuveli-Bangalore. These are like trial runs, though you may not have noticed them. There is a decision that all new coaches will have bio-toilets, a decision that will effectively be implemented from 2016-17. Sounds good, but there are a couple of problems. First, for a new coach (with 4 toilets), bio-toilets cost Rs 3 lakhs per coach. But for an old coach, which has to be retroactively fitted, it costs Rs 15 lakhs per coach. Among other things, because these toilets add to weight, and ordinary coaches are heavily loaded, the weldings/mountings fail. The coaches have to cut open, so that these can be reinforced. Assuming you can spare the coaches, that’s quite a sum of money. But there is a decision that from 2021-22, all coaches will have bio-toilets.
The second problem is more serious. People stuff other things into toilets – polythene bags, sanitary napkins, diapers, bottles, pouches. These aren’t always bio-degradable. In those trial runs, one coach per train has come back with this kind of problem. Sure, there are waste-bins outside toilets. But passengers don’t always use them. For sanitary napkins/diapers, you can’t reasonably expect passengers to come out and use those bins. You need bins inside toilets, like aircraft. But bins inside toilets stink, unless they are regularly cleaned. Therefore, you realize the broad problem. There are multiple kinds of passenger segments. It’s one thing to lick a problem for a train that travels for no more than 24 hours (even easier for 8 hours). It is another thing to lick a problem for a train than travels for 72 hours.

DRDO chief is hopeful about Arjun Mark-II tank getting accepted by army

Sandip Dighe | TNN | Updated: Oct 23, 2017,
PUNE: The chairman of defence research and development organisation (DRDO), S Christopher, sounded hopeful on Sunday about the Indian Army accepting the Arjun Mark-II tank after certain modifications recommended by the army were incorporated.
Speaking on the sidelines of a function at the Defence Institute of Advanced Technology (DIAT), Christopher told TOI, “We have carried out certain modifications as recommended by the army. The tank will go through trials and there is every possibility that it will be accepted considering that the army has already agreed to induct the tank in two regiments.” 
The DRDO chief was on a visit to DIAT — a deemed university under the defence ministry — for the inauguration of the 21st batch of Post Induction Training School (POINTS), a programme for newly inducted DRDO scientists. He also held a meeting with senior scientists.
The army had recommended nearly 71 modifications to the tank and had asked the DRDO to redesign the hull and the turret structures and use new materials in order to reduce the weight. The weight of the Mark-I is 62 tonne while Arjun Mark-II is 68 tonne.
A senior army officer from the armoured corps, told TOI on Sunday, “The army has a major issue with the weight of Mark-II as it will not meet its operational requirements in the western sectors where the tank will be deployed in future. During the past trials, it had come to our notice that the tank is heavier than the existing culvert, thereby, making mobility a major issue. It was, therefore, paramount to recommend a reduction in weight of the tank from an operational point of view.”
A senior DRDO scientist closely associated with the project said, “The army had specified their operational requirement on three aspects — weight, missile firing capability and ammunition. We have addressed these issues. Besides, we have kept the agility and mobility of the tank at par with the existing one. We are confident that the tank will meet the army’s requirements in the trials.” The army has about 3,500 tanks mostly comprising the old T-72 and the improvised T-90 tanks.

‘Internal politics’ forces DRDO scientist to quit

By Pradip R Sagar | Published: 08th October 2017
NEW DELHI: With a dream to work for his country after spending a successful stint overseas, Dr Gausal Ahmed Khan applied for the post of senior scientist in the country’s premier defence research institute—DRDO—in 2009. Eight years down the line, Khan’s dreams were shattered when he was forced to resign in September owing to ‘internal politics’.
Khan, a physiologist, worked on a project to reduce the acclimatisation time of Indian Army personnel stationed at high altitude locations like Siachen. He has written a letter to Prime Minister Narendra Modi exposing nepotism, politics, and corruption prevailing in the DRDO. “Unfortunately my scientific temperament and hard work proved to be a disqualification in one of the country’s most reputed organisations—DRDO,” Khan wrote to the PM.

Dr Gausal Khan

“Bereaved, my broken and humiliated conscience prompted me to write to you and apprise you of the prevalent politics, corruption, and other work conditions in DRDO. I am writing with a hope that in future work condition in DRDO may improve and will prevent scientists from leaving the organisation,” he added.

While disclosing how he was involved in litigation after not given credit for his work, he said, “I spent the last three years in the organisation defending myself in unwanted litigations imposed on me by higher officials due to their politics, personal vengeance, and family lineage.”

Khan got some relief when he approached the Central Administrative Tribunal (CAT) against a disciplinary case imposed on him. The Tribunal in its order stated: “He has been conferred with ‘developing world scientist award’ at international level for his research of unique nature.

Assuming that there are some lapses on the applicant (scientist), the disciplinary authority should have taken a lenient view on account of the excellent scientific research by him which brought laurels not only individually for him but to the country as whole. However, the respondent (DRDO authorities) has not given due credit for his research in the scientific field. This depicts sorry state of affairs. Instead of appreciating his research work, he has been treated shabbily and awarded punishment in gross violation of law”.

When contacted Khan, who is leaving for the US, said, “I came with a vision and a dream. My working conditions forced me to leave. But before leaving, I wanted to apprise the top leaders of the poor work atmosphere. PM talks about self-reliance in defence, but we cannot achieve it unless we weed out corruption and internal politics.”

DRDO Awards – 2016 – RTI

 

To,                                                                                                                 9th August 2017

Dr. RB Sharma, CPIO,

DRDO HQ, Min. of Defence

DRDO Bhawan, Rajaji Marg

New Delhi-110011

Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of DRDO Awards 2016 vide letter No DOP/02/25003/DRDO Awards-16/M/01  dated 9 May 2017

  1. Certified copy of recommendation letter issued by Director, DMSRDE, Kanpur to DRDO HQ (thru DG NS&M) regarding DRDO Awards 2016 based on which Ms SMPP, New Delhi got Defence Technology Absorption Award from DRDO for the year 2016.
  2. Copy of the letter along with support documents forwarded by Director, DMSRDE for nomination under DRDO Awards 2016 based on which DMSRDE, Kanpur awarded with Titanium Trophy.

 

Note : DEFENCE TECHNOLOGY ABSORPTION AWARD

(Rs. 5 lakhs each, not exceeding 2 awards)

To be given to best industries (public/private) which have taken active part in productionising the systems developed by DRDO.

Nomination to be given by Lab Directors/Members DRC

(It is public money and citizen have right to know whether it is spend judiciously)  

Regards

Prabhu  Dandriyal,
21-Sunderwala, Raipur,

Phone 0135- 2787750, Mobile- 9411114879,
e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

 

Registration Number    MODEF/R/2017/51915

FCC BUSINESS IN DRDO: CORRUPTION IN R&D OF BPJ AT DMSRDE, KANPUR

To,                                                                                                                                  4th August 2017

Hon’ble Shri ArunJaitely

RakshaMantri, Bharat Sarkar

RakshaMantralaya,

South Block,

New Delhi-110011

Subject: FCC Business in DRDO- Corruption in DMSRDE, Kanpur by Dr. Rajesh Kumar Tiwari, Scientist ‘F’

Sir,

As you aware there are several questions raised by honorable members of Parliament regarding corrupt practice complaints against DRDO Directors and senior scientist but unfortunately DRDO “pull the wool over MoD eyes” in the name of constitution Fact Finding Committees for such complaints. The fact is the committees chairman and members are always their yes man/chamchas. The reports generated after consuming months and months and as per designed by DG and his loyal coterie. CVO, MoD only busy with correspondences for several years in each case.

Sir, you just call a sample case from CVO, MoD on your table, will expose the modus operendi of these great manipulator scientists of DRDO. Whether case of R&D E, Ex Director Dr Guruprasad, Ex Director DMSRDE, Dr A K Saxena, Dr A K Tyagi, Scietist ‘G’, Ex C C &D, Dr Selvamurty and so many case are pending in the desk of CVO, MoD waiting for fake reports of FFIC’s and clarifications of show cause notices replies of DRDO.

Corruption and adoption of corrupt practices in routine office activities is inherent property of DMSRDE, Kanpur. Even after dozens of complaints on corruption to CVC and its slow motion action on these complaints, Hon’ble High Court Delhi Order in PIL WP(C) No. 3610/2015 dated 17 Dec 2015 and Show Cause Notices to more than 30 Scientists and officers of DMSRDE, Kanpur and approval of Charge Sheet under Major Penalty to Ex- Director Dr. Arvind Kumar Saxena there is no fear in some daring Scientists of DMSRDE and once again Corruption started in DMSRDE, Kanpur.

The recent case is of Complaint dated 21 October 2016 by Shri K.K. Sharmaagainst Dr. Rajesh Kumar Tiwari, Scientist ‘F’. As usual on receiving of complaint DRDO HQ constituted Fact Finding Committee (FCC) – Chairman Shri R.K. Sharma, Scientist ‘G’ , DPA, DRDO HQ.

The case relates to complaint dated 21 October 2016 sent by Shri K.K. Sharma, DMSRDE, Kanpur to Hon’ble RakshaMantri alleging corruption in procurement of material by using fake addresses of firms by Dr. R.K. Tiwari, Scientist ‘F’, DMSRDE, Kanpur in development of Bullet Proof Jacket (BPJ) GSQR 1318.

A File No. DVS/02/2039/P/22 was initiated in the matter and a revised report in accordance with Note No. 19 dated 09 March 2017 was seek by Director General (NS &M) and letter  was sent to Dr. N. Eswara Prasad, Director, DMSRDE on 21.03.2017 from Office of DG(NS&M).  He was asked to submit the revised report by 23 June 2017 vide DG(NS&M) letter No. DVS/02/2039/P/22 dated 19 June 2017.

As a matter of fact Dr. Rajesh Kumar Tiwari, Scientist ‘F’ was Head of Composite Material Division and Project Head of Body Armour : Bullet Proof Jacket (BPJ) -GSQR 1318. He was removed from Head, Composite Division  and Shri A.S. Parihar , Scientist ‘E’ was made Project Head & Head of Composite Division by Director, DMSRDE under huge pressure of DRDO HQ. It is relevant to mention here that Show Cause notice has been issued to Shri A. S. Parihar , Scientist ‘E’ in Corruption matter of Dr. A.K. Saxena complaints and his promotion was also withheld by DRDO HQ for several months.

Dr. Rajesh Kumar Tiwari, Scientist ‘F’ is still posted at DMSRDE, Kanpur and no action has been taken against him. He is having blessings of Dr. N. Eswara Prasad, Director, DMSRDE and enjoying at DMSRDE, Kanpur. DRDO HQ is trying to wash out the matter by its FCC business ( means submit fake FCC report and protect the corrupt) and adopting delay tactics in this complaint.

Sir, your Government is having policy of “zero tolerance” on corruption then why not any disciplinary action has been initiated since last 09 months of filing the complaint? I kindly request you to take urgent action in the matter and issue orders to immediate transfer/posting of  Dr. Rajesh Kumar Tiwari, Scientist ‘F’ out of DMSRDE as he is affecting the inquiry and influencing the case due to his contacts at DMSRDE. It is relevant to mention here that Dr. Rajesh Kumar Tiwari, Scientist ‘F’ is posted at DMSRDE since the year 1990.

 

Regards

Prabhu Dandriyal

21- Sunderwala, Raipur

Dehradun – 248008

Mobile -9411114879

Email id prabhudoon@gmail.com, ww.corruptionindrdo.com

Enclosures:

  1. Hon’ble High Court Delhi relevant portion of Order in PIL WP(C) No. 3610/2015 dated 17 Dec 2015.
  2. Vigilance Clarence to Dr. A.K. Saxena dated 31 July 2015
  3. Letter DVS/02/2039/P/22 dated 19 June 2017 from Office of Director General ( NS &M), DRDO Bhawan, New Delhi.
  4. Relevant portion (page 19-20) of noting approved by DG(NS&M) dated 21.03.2017

Hon’ble Defence Minister is helpless in front of DRDO for continued deliberate harassment of Whistle Blower against constitutional provision

Even  the present Hon’ble Defence Minister  is helpless in stopping the continued deliberate harassment meted out to the Whistle Blower of DRDO (acknowledged by the then Defence Minister) by the top management of DRDO HQ New Delhi & by his present Director of Delhi based lab of DRDO, MOD through the following acts & omissions.

  • Harassment meted out by DRDO HQ, New Delhi                                     
  • By non implementation of the advice of CVC issued vide CVC OM No 24571/2016/vigilance-9  19-04-2016 , O M No conf/6807/16/315999 dated  30-05-201  & O M No conf/1750/09/3201 dated  15-07-2016  to restore the posting of the whistle blower to LASTEC, Delhi even disregarding the  formal representation dated  16-06-2017 submitted by the whistle blower of DRDO in this regard to the present Secretary, DDR&D.                                       
  • By non conveying  of the  decision of the Hon’ble Defence Minister ( obtained from him by deliberately misleading him distorting the material facts) to the complainant whistle blower on his complaint/ representation dated 28-12-2015 submitted to the then Hon’ble Defence Minister to get implemented the decision of para 03 (three) of MOD decision conveyed to DRDO HQ vide MOD ID no PC to 470/ DO (Vig)/ 2012 dated 19-10-2015 against  22 prima facie guilty officials of DRDO who trumped up false charges & committed a number of irregularities with single minded objective of harassing the whistle blower  through their ibid mala fide actions.
  • By non communicating the decision of the Hon’ble Defence Minister, decision of the present secretary,  DDR&D,   decision of present DG (ECS),  decision of Shri V  P Dutta, the then Scientist ‘G’ of DEAL, Dehradun  &  Chairman & decision of Shri   A K Pandey    Scientist ‘F’ OF IRDE, Dehradun &  member of the committee appointed  vide DG ( ECS) order No DG ECS /ADM/12538/LASTEC/2015/PS   dated 13-01-2016 on through proper channel representation dated 18-03-2016 of the whisle blower of DRDO submitted to the then DG (ECS) of DRDO HQ &  copies also endorsed to Hon’ble Defence Minister  & all the above mentioned authorities of DRDO for  taking remedial actions.
  • By hatching a conspiracy to ultimately post  the whistle blower  in a  wing of a Delhi based lab of DRDO situated 15 kms away from the main LAB  where there is no  basic infrastructural  facilities & absolutely no work for the whistle blower in his sphere of duties where the the whistle blower  has been suffering unbearable miseries. This was done after doing the drama of taking the option of choice posting to LASTEC, Delhi from the whistle blower. 
  • By not processing & not redressing his any of the genuine service matter grievances on one or the other illegal pretexts submitted by the whistle blower of DRDO during the tenure of present Secretary, DDR&D.
  • By illegally getting rejected the issues raised in the pre litigation conciliation representation dated 26-11-2015 of the whistle blower of DRDO through the  false Recommendations of the  committed pre litigation conciliation committee Headed by Shri Sushil kumar Verma, Director, Cyber security & Scientist ‘G’ of DRDO HQ  prepared  by deliberately overlooking & ignoring the contents of the pre litigation conciliation representation dated 26-11-2015 of the whistle blower  & other letters submitted  by the whistle blower to Shri Verma.
  • The issues raised in the pre litigation conciliation representation dated 26-11-2015 of the whistle blower were finally rejected by the present Secretary, DDR&D By deliberately ignoring the material facts based on the record of DRDO & MOD  contained in the through proper channel representation dated 28-04-2017 submitted to the present Secretary, DDR&D.
  • BY rejecting  most urgent & most immediate through proper channel representation dated 28-09-2015  of the whistle blower of DRDO submitted to the secretary, DDR&D   in most arbitrary manner directly violating the standing provisions of grievance redressal policy of both Govt. of India & DRDO, MOD.
  • By not deciding through proper channel representation dated 29-01-2016 of the whistle blower of DRDO submitted to the secretary, DDR&D pertaining to deliberate illegalities committed in DRDO HQ continuously affecting adversely to the whistle blower of DRDO even till to date.                                                               
  • By not deciding & not communicating the final outcome of 02 (two) complaints of vigilance nature dated 04-07-2016 & dated 11-07-2016  to the whistle blower of DRDO even up to now submitted by the whistle blower of DRDO  to the present Cabinet secretary to the Govt. of India & to the Hon’ble prime minister of India  respectively which reached in DRDO HQ in 2016 itself for taking appropriate actions on the same.
  • Harassment meted out to the Whistle Blower of DRDO by present director of the Whistle Blower
  • By hatching a conspiracy to post the whistle blower of DRDO in one wing of the concerned Delhi based lab of DRDO Situated 15 kms from the main lab where there was no work for the whistle blower even  when whistle blower of DRDO was the senior most officer of the Admin cadre posted in that    Delhi based  main lab of DRDO to make him professionally obsolete..
  • By hatching a conspiracy not to nominate  the whistle blower of DRDO  in 2016 for the training programmes even run by govt. agencies free of cost directly  related & essential for enhancing the acumen of the whistle blower of DRDO in the sphere of his charter of duties as senior administrative officer , Grade –I  of Admin Cadre of DRDO, MOD.
  • By hatching a conspiracy by getting  Arbitrarily rejected  04  nominations  of  of the whistle blower of DRDO  pertaining to short term training programmes of the duration of one week or less period   to be conducted during the period from July 2017 to December 2017  by the Govt training Institute namely by ISTM, New Delhi free of cost directly  related & essential for enhancing the acumen of the whistle blower of DRDO in the sphere of his charter of duties as Senior Administrative Officer , Grade –I  of Admin Cadre of DRDO, MOD through  the  initial decisions dated 13-07-2017 of his immediate sub-ordinate scientist “G’ Shri Raju Agarwal without   any cogent grounds & thereafter he himself approved such arbitrary decisions to harass the whistle blower of DRDO .  
  • By not ensuring processing any of the service matter grievances of the whistle blower of DRDO with due diligence & giving full opportunity to the concerned officials to adopt dilatory tactics in processing the service matter grievances of the whistle blower of DRDO, New Delhi.
  • By compelling the whistle blower of DRDO to exclusively limit his charter of duties to open & close the one wing of the Delhi based lab of DRDO in which he has been posted.
  • BY Removing the whistle blower of DRDO from the hitherto duties of officer in-charge              (assigned to him on 23-08-2016) of the one wing of the Delhi  based lab of DRDO  vide order dated 25-07-2017 leaving him without any work & compelling the the whistle blower of DRDO holding the functional designation of senior Group ‘A’ Gazetted post of  Senior Administrative Officer , Grade –I  of Admin Cadre of DRDO, MOD to report to  one in situ promoted Scientist ‘D’ of DRDO who does not any competence to do any value addition in administrative work of the said wing & who  even insulted the whistle blower in the presence of his all junior  on 25-07-2017 on  official telephone saying that the whistle blower does not have any authority in  the said wing of the said Delhi based lab DRDO because we scientists can do anything to the whistle blower which seems to be true also considering the above mentioned acts & omissions by one of the senior scientist of DRDO holding the designation of scientist ‘H’ &  Director of the Delhi based lab in which the whistle blower is posted Who was  dare enough to conduct the illegal meetings of internal screening committee main for assessment of Scientists ‘Fs’ of DRDO  for assessing their suitability for the posts of Scientist ‘G’ under promotion quota  IN 2011 even before inception of the amendments in the concerned statutory nature of recruitment rules of Scientist ‘G’ in DRDO  while holding the appointment of Director , RAC, New Delhi thereby incurring the financial loss to the tune of 14 lakhs to the public exchequer for which some investigation has also been ordered by the DRDO/MOD ,still he does not hesitate to  continue harassing the whistle blower of DRDO.
  • By making Payments of the arrears of 7th CPC to the whistle blower of DRDO only in April 2017 whereas all other officials of DRDO got their arrears of 7th CPC in 2016

3,600 Crores Later, Made-In-India Akash Missile Fails Tests, Says Auditor

The Akash and its newer variant, the Akash Mk-2, are a medium-range surface-to-air missile system designed to intercept enemy aircraft and missiles at a distance of 18-30 km.
All India | Written by Vishnu Som | Updated: July 28, 2017 18:41 IST NDTV

The Akash was produced by the state-run Bharat Electronics.

NEW DELHI: As many as a third of the home-made Akash surface-to-air missiles have failed basic tests, says the country’s national auditor, claiming the deficiencies of the missiles “posed an operational risk during hostilities.”

The report of the Comptroller and Auditor General (CAG) is a big setback for the Make-In-India initiative which seeks to reduce India’s dependence on imported arms. The report, given to parliament, says, “the missiles fell short of the target, had lower than the required velocity, and there was malfunctioning of critical units.”

The Air Force has refused to comment on the report.

The Akash was produced by the state-run Bharat Electronics. The auditor says that though 3,600 crores have been paid to the manufacturer, none of the missile systems are installed at the six designated sites even though it has been seven years since the contract was signed.

The Akash and its newer variant, the Akash Mk-2, are a medium-range surface-to-air missile system designed to intercept enemy aircraft and missiles at a distance of 18-30 km. Tested extensively by the Indian Air Force, the Akash, which was first handed over in December 2008, was seen as a breakthrough indigenous system and in 2010, an additional six squadrons were ordered.

These additional squadrons, composed of missile launchers, radars, associated vehicles and hundreds of Akash missiles, were meant to be deployed at six air force bases in the East for which the government approved related infrastructure including storage facilities, workshops and ramp structures. These were supposed to be constructed by Bharat Electronics on a turnkey basis at a cost of approximately 100 crores. However, this infrastructure “could not be completed till October 2016 at any of the sites.” The auditor also says though work was nearly complete at two bases, the “IAF had not taken over these buildings because of defects in the construction, which rendered them unsuitable for strategic missile system storage. In other stations, the progress was below 45 per cent as of October 2016”.

While the missiles were indeed delivered to air forces bases between April 2014 and June 2016 after a delay of between 6 and 18 months, the missiles were found to be deficient in quality. According to the auditor, “Out of 80 missiles received upto November 2014, 20 missiles were test fired during April-November 2014. 6 of these missiles, ie, 30 per cent, failed the test.”