Tag Archives: Design

HAL’s Light Combat Aircraft project to come under IAF control

Dinakar Peri   NEW DELHI, AUGUST 04, 2018 THE HINDU

 

Slow takeoff: The development of the Tejas-Mk 1A with specific enhancements has been delayed.

To prevent time and cost overruns, the IAF will soon have effective control over India’s indigenous LCA programme
The government is poised to hand over control of the Bengaluru division of State-owned Hindustan Aeronautics Limited (HAL) to the Indian Air Force (IAF). This is to prevent more time and cost overruns on the indigenous Light Combat Aircraft (LCA) project. This comes at a particularly crucial time as the next phase of the LCA project, development of the MK2 variant, as well as the country’s next fighter aircraft programme, the Advanced Medium Combat Aircraft (AMCA), begin to take shape.

“The government has given the go ahead to hand over the entire Bengaluru complex of HAL to the IAF. With this, the fixed wing aircraft division will come under the IAF. The modalities are being worked out,” an official source told this reporter of the process that may take a few months.

HAL resists
HAL manufactures and assembles a range of aircraft and helicopters. However, it has faced criticism for its time and cost overruns and lack of professionalism in project execution. HAL has opposed this move for a long time, fearing erosion of its autonomy.

The LCA programme was sanctioned in 1983 and the aircraft made its first flight in 2001. The IAF had signed two contracts with HAL, one for 20 aircraft in the Initial Operational Clearance (IOC) configuration signed on March 31, 2006, to be completed by December 2011, and another for 20 aircraft in the Final Operational Clearance (FOC) standard signed on December 23, 2010, which was to be completed by 2016. It is in the process of ordering 83 jets in the Mk 1A configuration.

The IAF constituted the first LCA squadron with just two aircraft in 2016 and, as of July 2018, has inducted only nine aircraft. Tejas has once again missed the FOC in June and the development of the Tejas-Mk 1A with specific enhancements has been delayed. With this development, HAL’s aircraft division will be headed by a serving three-star officer or an Air Marshal of the IAF, and effectively give the IAF control over the country’s indigenous LCA project.

In addition, three institutions — Aeronautical Development Agency (ADA), Aeronautical Development Establishment (ADE) and Gas Turbine Research Establishment (GTRE) — which are under the Defence Research Development Organisation (DRDO) are likely to be brought under the direct control of the Chief of the Air Staff. Thus, the entire development cycle of the LCA will have the IAF’s oversight and will ensure timely execution and prevent blame games over delays, the source observed. Details of the specific contours of the move are awaited.

‘Long overdue’
“The IAF should have taken over the LCA programme two decades back, but [it is] good it’s happening at least now,” said Air Marshal M. Matheswaran (Retd), who oversaw the IAF’s fighter procurement in the past. He felt that to make a real difference, the IAF should get the entire cycle under its control, from design, standardisation, production and supply chain. Otherwise, just having one officer at the helm will not change things much, he added.

“Production for 20 FOC aircraft will be taken up after FOC clearance by the ADA, for which the current target is December 2018,” Minister of State for Defence Subhash Bhamre said in a written reply in the Rajya Sabha last week.

However, a Defence Ministry official said this is likely to be delayed by another six months as several parameters like gun firing, air-to-air refuelling and new data-linked software defined radios, among others, are yet to be validated. The IAF wants new data links as a standard feature on the FOC variant as communications are an essential feature for an aircraft to operate in a network-centric environment.

HAL is setting up a second assembly line to ramp up production from eight to 16 aircraft a year, in addition to outsourcing major modules to private partners.

Design reboot
The LCA is powered by an American GE-404 engine, which the IAF has stated is underpowered. This is to be corrected in the LCA-Mk2 which would be a larger aircraft powered by the GE-414 engine producing 98kN thrust compared to 84kN thrust of the current engine.

“The design change has been launched sometime back. We don’t want just some superficial changes, but a real increase in performance. The target is to meet or exceed the Mirage aircraft in performance,” an IAF official said.

To accommodate the larger and more powerful engine, which also needs more fuel, requires a larger wingspan for the aircraft. This calls for a major design and engineering effort.

“There are concerns and challenges but it is doable,” the officer noted.

The first prototype of the Mk2 is expected to make its debut flight in 2022-23, and complete the IOC and FOC approvals in the next five years. The current target is to have the first squadron ready by 2028.

The IAF intends to have several squadrons of the LCA-Mk2 as it has to replace three Mirage squadrons, three Mig-29 squadrons and six Jaguar squadrons. A squadron typically has about 18 aircraft, 16 fighters and two trainers. However, this can vary, depending on the type of aircraft and the necessity.

डीआरडीओ में ताजमहलो का निर्माण

माननीय श्री नरेंद्र मोदी जी                                                                       दिनाक 12 जून 2014
प्रधानमंत्री
कक्षसंख्या  152पीएमओ
साउथ ब्लाक  नईदिल्ली -110011

 

विषय : डीआरडीओ में ताजमहलो का निर्माण

माननीय श्री प्रधानमंत्री जी डीआरडीओ में रक्षा प्रणालीयो के अनसुन्धान व् निर्माण के  नाम पर जो लूट मची है उस के कई उदाहरण समय समय पर अखबारों के माध्यम से आम जनो को पता चलता रहता है परन्तु वास्तविकता यह है कि इन सभी खबरों को राष्ट्रीय सुरक्षा के नाम पर दबा दिया जाता है

  1. ब्रह्मोस कम्पनी की उत्पति सन 1998 से आज तक उप्लभ्धि पर नजर डाले तो हज़ारों करोड़ रूपए  खर्चेने के बाद भी  सिवाए टेस्ट फायर के  खबरों कुछ भी यथार्थ में नहीं मिलेगा असली उप्लभ्धि है श्री पिल्लई का सन 2007 से अब तक सात बरसों का सर्विस में एक्सटेंशन, लाखो  रूपए खर्च करके अपना होलोग्राम बनवाया, अपनी नाम की गैलेरी बनवायी, अपनी आत्म कथा लिखने पर जनता का पैसा खर्च करा,  लाखो  रूपए के ब्रह्मोस मिसाइल के लकड़ी के माडल बनवाए, लाखो  रूपए विदेशो में डिफेन्स एक्सपो के नाम पर विदशो में  खर्च किये एक पैसे का आज तक आर्डर नहीं मिला, क्या हमारे देश में सेल्फ मोरल नाम की चीज़ वास्तव में खो गयी है, अब जाकर जब  श्री पिल्लई के दोस्त की सरकार गयी तो ब्रह्मोस कम्पनी को नया सी ई औ मिल रहा है,  पर क्या पंद्रह सालो में जो श्री पिल्लई ने देश का पैसा बर्बाद किया उसका हिसाब हमारे प्रधान मंत्री जी श्री पिल्लई से मांगेगे I
  1. डीआरडीओ सन 1990 से  मिसाइल के नाम पर  हज़ारों करोड़ रूपए खर्च कर रहा है देश को जानकर यह आश्चर्य होगा कि  डीआरडीओ के वैज्ञानिको ने मिसाइल को एक होली काऊ बना कर जम कर दोह रहे हैं अगर मात्र  डी आर डी एल हैदराबाद  संस्था  का स्पेशल ऑडिट करा लिया जाय तो पुरे डीआरडीओ के स्वास्थ्य का पता देश को चल जायेगा I
  1. उदाहरण के लिए – एक लगभग 8 मीटर x 12 मीटर का गोदाम डी आर डी एल हैदराबाद ने 19 जून 2014 को बड़े साज सज्जा के साथ उद्घाटन किया ( गोदाम की फोटो सलग्न है ) कुल लागत लगभग आठ करोड़

गोदाम की लागत – दो  करोड़ पिचासी लाख

गोदाम के अंदर लोहे की रैक – दो  करोड़ पचास लाख

गोदाम के अंदर संचालन हेतु दो बैटरी ऑपरेटेड फोर्क लिफ्ट व् प्लेटफार्म ट्रक – नब्बे लाख व् एक  करोड़ बीस  लाख

गोदाम के अंदर रखे सामान के जानकारी हेतु बारकोड सॉफ्टवेयर – सतर लाख

गोदाम का एयर कंडीशनर आदि –  एक  करोड़ से अधिक

गोदाम के अंदर फायर फाइटिंग का कोई प्रावधान नहीं दिया है I

जिस कांट्रेक्टर से गोदाम का निर्माण करवाया उसने आर्डर से दो महीने पूर्व ही कार्य आरम्भ कर दिया था I (गोदाम का निर्माण के कार्य सम्बन्ध की सम्पूर्ण सूचनाये सलग्न है)

आप से आग्रह है कि अगर आप गुजरात के किसी व्यापारी बंधू से गोदाम की लागत निकलवाएंगे तो सिर्फ एक करोड़ रूपये की लागत आएगी और हो सकता है उससे भी कम आए I

अतः आपसे अनुरोध है कि डीआरडीओ के वैज्ञानिको को रक्षा प्रणालीयो के अनसुन्धान के नाम पर देश को लूटने से बचाये I

धन्यवाद

प्रभु डंडरियाल
21-सुंदरवाला, रायपुर, देहरादून
फ़ोन  0135- 2787750, मोबाइल – 9411114879,
e-मेल  id prabhudoon@gmail.com  वेबसाइट  www.corruptionindrdo.comLRSAM phot 10 april
 
Item Description – Design, Manufacturing, Supply, Erection and Commissioning of Detachable Integrated Logistics Store EnclosureDemand No.  (DRDL/LRS/26/98P/13/049) Demand Date (dd.mm.yy)- 31.12.13

Inventory Holder Name (S/Shri.) V. Venkateswarlu , Scientist – D , LRSAM Project  ,DRDL  phone  no : 040 2458 4507

Rate (Rs.) 28500000.00 Sales Tax (VAT) 5.00% Tax Value  (Rs.) 1425000.00

SO Value with TAX (Rs.) 29925000.00

Firm Name (M/s.) Trinetra Constructions Firm Address17-1-388/77/B, Lakshmi Nagar Colony, Saidabad HYDERABAD – 500 059. Firm Phone040 – 2406 4666 /  2406 4555 /  2407 1529 Firm Fax040- 2406 4666

(Local person who don’t have any (not more) construction experience in real estate field…

Bank Guarantee Amount (Rs.) 2850000 BG. No.35214IGPER0004 BG. Date13.03.14 Validity      11.09.14 Bank Name Andhra Bank

AB / EB / PJB -PJB EB / PJB Letter No. DRDL/LRS/24 EB / PJB Letter Date  30.12.13 EB / PJB Sanction ID No. PB027R1A(b)002 EB / PJB Sanctioned Quantity1 No. EB / PJB Sanction Cost RE (FE) Rs. Lakhs 348.53 (0) Additional Sanction  Revenue / Capital Revenue Mode of Tender Limited

S.O. No. DRDL/LRS/26/98P/13/049/8500

Key members involved in this particular case.

1.Mr . Jaiteerth Joshi , Sc’F; , LRSAM , DRDL.

2. Patrick D’Silva , Sc’G;’,Project Director , LRSAM ,DRDL

3. Ved Veer Arya , IDAS ( Indian defence Accountant services  1997 batch officer ), finance officer , missile complex ( DRDL, ASL, etc)

PDC – 30.06.14- but construction was started early in January 2014…

With the bank guarantee dates   of Andhra bank and with construction photos anyone can co-relate how much fraud was happen…..

Inaugurated on 19th June 2014

CDA, R&D Hyderabad Hijacked by DRDL, LRSAM, Scientists

To                                                                                                 22nd May 2014
Sh. Upendra Sah, IDAS, PCDA (R&D)
O/o PCDA (R&D), West Block-V
R K PURAM
NEW DELHI- 110066

Subject: CDA, R&D Hyderabad Hijacked by DRDL, LRSAM, Scientists.

The Case of Design, Manufacturing, Supply, Erection and Commissioning of Detachable Integrated Logistics Store Enclosure is a perfect example of hijacking CDA, (R&D) Hyderabad.

The CDA  Sh. A. Ramiaiah, IDAS never read their website’s Mission Statement – We strive to achieve excellence and professionalism in accounting and financial services and in performing audit functions.

Why? Because please see the following case of Design, Manufacturing, Supply, Erection and Commissioning of Detachable Integrated Logistics Store Enclosure (Rs.) 29925000.00

Demand No.  – DRDL/LRS/26/98P/13/049 Demand Date – 31.12.13

Inventory Holder Name –  Sh V. Venkateswarlu , Scientist – D , LRSAM Project  ,DRDL

Rate Rs. 28500000.00 Sales Tax (VAT) 5.00% Tax Value (Rs.) 1425000.00 SO Value with TAX Rs. 29925000.00

Firm Name -M/s. Trinetra Constructions Firm Address – 17-1-388/77/B, Lakshmi Nagar Colony, Saidabad HYDERABAD – 500 059. Firm Phone040 – 2406 4666/2406 4555/2407 1529 Firm Fax040- 2406 4666

BG % of Order Value  10% BG Amount Rs. 2850000 BG. No.35214IGPER0004 BG. Date13.03.14 Validity  11.09.14 Bank Name Andhra Bank

AB / EB / PJB -PJB EB / PJB Letter No. DRDL/LRS/24 EB / PJB Letter Date  30.12.13 EB / PJB Sanction ID No. PB027R1A(b)002 EB / PJB Sanctioned Quantity1 No. EB / PJB Sanction Cost RE -Rs. Lakhs 348.53   Mode of Tender – Limited

S.O. No. DRDL/LRS/26/98P/13/049/8500 Supply order not placed up to the date of Bank Guarantee but the above was the proposed serial no 8500

Key member involved in this particular case from CDA (R&D) is Sh. Ved Veer Arya, IDAS  Indian defence Accountant services  1997 batch officer), finance officer, missile complex (DRDL, ASL, etc.)

PDC -30.06.14- but construction was started early in January 2014… With the bank guarantee dates of Andhra Bank and with construction photos you can co-relate how much ……………… was happening.

The item nomenclature cannot make difference on price. The order is almost 5 to 6 time higher from construction photographs so you can imagine what is cooking. The credential of construction firm can also be a big question.

It is only the tip of the iceberg. It is requested to investigate all cases of M/s. Trinetra Constructions.

It is observed that a number of cases in DRDL were manipulated with involvement of CDA. If you are willing to eradicate corruption the website is ready to help you with all inputs (evidences) of corruption prevailing in different DRDO establishments.

Sir, it is also observed that the honest AO/JCDAs were transferred under pressure of DRDO top brasses and other corrupts are enjoying long posting 5 years 10 years you know cases like the one of most controversial DRDO establishment ITR. The DRDO scientists in the name of secrecy and urgency change the nomenclature and play with specifications, it is suggested such cases be seconded from other organizations without knowledge of DRDO indenters.

अब तो जागो, मोदी जी आ गए हैं.

With great hope that you will look into the matter and do the needful.

Regards,

Prabhu  Dandriyal,
21-Sunderwala, Raipur, Dehradun -248008
Phone 0135- 2787750, Mobile- 9411114879,
e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Enclosed – Photos of construction in different stagesLRSAM phot 12 Feb

 

LRSAM phot 6 March

LRSAM phot 22 March

LRSAM phot 10 april

DRDL, LRSAM, DRDO Scientists inspired by KARGIL COFFINGATE

coffin-scam-chargesheet-313

KARGIL COFFINGATE

DESIGN, DEVELOPMENT AND MANUFACTURE OF SEA/AIR WORTHY PACKAGING BOXES FOR DRDL PROPULSION SYSTEM
Packaging box would be made from marine plywood (Moister Resistant MR-grade). The marine plywood would be first coated internally as well as externally with a suitable primer and then with a coat of cashew nut based oil for waterproofing.

Size 12 feet X 1.8 feet x 1.5 feet approx Total Board = 32.4 Sq feet
Best marine plywood (Moister Resistant MR-grade) costing – Rs 100- Rs 200 for 19mm Boards – IS:710 – Excellent waterproofing. Used in ship building
Cashew nut based oil – Rs 400 to Rs 600/ Ltrs, Best Paint – Rs 400- Rs 600
Rest as shown in picture foam cushions, Hinges, Lifting brackets Stickers and carpentry charges etc Cost you can guess?wooden case final

Five specimen purchased details of DRDL, DRDO, Hyderabadwooden case order table

 

RTI- Corruption in LRSAM Project

To,                                                                                                                    17th April 2014
Shri Pritam Dutta, IDAS,
ACDA, CPIO,CVO,
O/o PCDA (R&D), West Block-V,
R K PURAM,
NEW DELHI- 110066              

Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect  of LRSAM Project, DRDL’s demand of  Design, Manufacturing, Supply, Erection and Commissioning of Detachable Integrated Logistics Store Enclosure vide Demand No. DRDL/LRS/26/98P/13/049 Demand Dated 31/12/13. It is observed that M/s Trinetra Constructions already started construction on the site against above demand well before (almost two months) supply order is not given to firm. The firm already erected the structure and work in progress the store was constructed and wall plaster is in progress.

The demand was raised vide Demand No.  (DRDL/LRS/26/98P/13/049) dated 31.12.13  by sh V. Venkateswarlu , Scientist – D, LRSAM Project, DRDL SO Value with TAX (Rs.) 29925000.00 Firm Name M/s Trinetra Constructions  Address 17-1-388/77/B, Lakshmi Nagar Colony, Saidabad , HYDERABAD The firm submitted the Bank Guarantee of  Rs 2850000  vide Andhra Bank  Guarantee No.35214IGPER0004 dated 13.03.14 As per the bank guarantee dates  and enclosed photo of constructions anyone can understood the work was started very early before the date of bank i.e 13.03.14. Your rep Sh   Ved Veer Arya , IDAS, finance officer , missile complex ( DRDL,ASL, was participated in the processing of the case. The matter is directory related with corruption and it seems that PCDA rep closed his eyes because the rate of construction of required store Enclosure is five time higher.

  1. Names and address of  firms who were invited for said demand as the case was dealt in limited tender mode
  2. The copies of quotations received from firms against said demand
  3. Copy of authority letter (other than supply order) given to M/s Trinetra Constructions enters and starts the construction the restricted area by competent LRSAM officials.
  4. Date of starting construction by M/s Trinetra Constructions against above said demand.
  5. Certified copies of last three years (April 2010 to March 2013) orders given by DRDL to M/s Trinetra Constructions.
  6. Provide the number of supply orders placed to M/s Trinetra Constructions in April 2011 to March 2014 processed by CDA, Hyderabad.

Note : Matter is directly related to corruption and not exempted under Section 24 (1) as a proof the photos of above said   Detachable Integrated Logistics Store Enclosure are enclosed.

Please follow the provision of section 6(3) of the Act.

 

Regards
Prabhu  Dandriyal,
21-Sunderwala, Raipur, Dehradun -248008 
Phone 0135- 2787750, Mobile- 9411114879,
e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Enclosed – Photos of construction in different stages

Registration Number            MODEF/R/2014/60770

RTI – LRSAM – CDA(R&D), Hyderabad

To                                                                             27th March 2014
Shri T.Rambabu,
IDAS, Addl CDA(R&D),
Opposite to DRDL Gate,
Kanchanbagh Post Office,
Hyderabad-500058.

Hello,

Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of LRSAM Project, DRDL’s demand of  Design, Manufacturing, Supply, Erection and Commissioning of Detachable Integrated Logistics Store Enclosure vide Demand No. DRDL/LRS/26/98P/13/049 Demand Dated 31/12/13. Demand raised by Sh. V. Venkateswarlu , Scientist – D , LRSAM Project, DRDL. The Erection and Commissioning is already started in first week of February 2014 by M/s Trinetra Constructions, 17-1-388/77/B, Lakshmi Nagar Colony, Saidabad, HYDERABAD – 500059 without supply order and much before TEC & TPC. The case initiated in limited tender mode and cost finalized  at Rs.  28500000.00 Sales Tax (VAT) 5.00% Tax Value   Rs. 1425000.00 SO Value with TAX  Rs.  29925000.00. The Bank Guarantee of Rs 2850000.00 (10% of order value) vide Bank Guarantee No 35214IGPER0004 dated 13/03/2104 of Andhra Bank. The Supply order S.O. No. DRDL/LRS/26/98P/13/049/8500 not yet placed but the above was the proposed serial no 8500. In this case it seems that Defence Purchase Manual 2009 was totally ignored.

  1. Name and designation of CDA (R&D), Hyderabad Rep attends TPC of above case.
  2. Certified copy of noting and recommendation of CDA (R&D), Hyderabad rep on above case.
  3. Sh Vedveer Arya , IDAS ( Indian defence Accountant services  1997 batch officer ), finance officer, missile complex, Hyderabad is member of approval committee in respect of above case. Yes/No
  4. If yes the copy of his noting and recommendation of Sh Vedveer Arya on the above said file.

Note : Matter is directly related to corruption and not exempted under Section 24 (1) as a proof the photos of above said   Detachable Integrated Logistics Store Enclosure are enclosed.

Regards
Prabhu  Dandriyal,
21-Sunderwala, Raipur, Dehradun -248008 
Phone 0135- 2787750, Mobile- 9411114879,
e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Enclosed – Photos of construction in different stages

Registration Number            MODEF/R/2014/60600