CORRUPTION IN CONSTRUCTION & INSTALLATION OF “NATURALLY VENTILATED GREEN HOUSE WITH MULTILAYERED POLY CARBONATE SHEET” AT DRL, TEZPUR BY DR. RKR SINGH, TECHNICAL OFFICER ‘C’ AND DR. VIJAY VEER, DIRECTOR, DEFENCE RESEARCH LABORATORY(DRL), TEZPUR UNDER DRDO, MINISTRY OF DEFENCE

 To,                                                                                  Date  29th May 2015                                    Chief Vigilance Commissioner,                                                                                                        Central Vigilance Commission,                                                                                                       Satarkta Bhavan,A-Block, GPO Complex,INA,                                                                           New Delhi-110011

 SUBJECT : CORRUPTION IN CONSTRUCTION & INSTALLATION OF “NATURALLY VENTILATED GREEN HOUSE WITH MULTILAYERED POLY CARBONATE SHEET” AT DRL, TEZPUR BY DR. RKR SINGH, TECHNICAL OFFICER ‘C’ AND DR. VIJAY VEER, DIRECTOR, DEFENCE RESEARCH LABORATORY(DRL), TEZPUR UNDER DRDO, MINISTRY OF DEFENCE

Sir,

Following facts regarding corruption and irregularities in construction of “Naturally Ventilated Green House With Multilayered Poly Carbonate Sheet” at DRL, Tezpur by Dr. RKR Singh, Technical Officer ‘C’ AND Dr. Vijay Veer, Director, Defence Research Laboratory, Tezpur is submitting for your investigation and appropriate action.

  1. Defence Research Laboratory (DRL), Tezpur (Assam) is an establishment under Defence Research & Development Organisation (DRDO), Ministry of Defence.
  2. Vijay Veer, Scientist ‘G’ is Director, DRL, Tezpur with effect from 01 March 2012 to till date and he is superannuating on 31 December 2015.
  3. RKR Singh, Technical Officer ‘C’ is posted at DRL, Tezpur since more than 20 years in DRL, Tezpur. He is Head of High Altitude Agriculture Division at DRL, Tezpur.
  4. A project with details submitted below was sanctioned by competent authority at DRDO HQ to DRL, Tezpur.DRL GH cvc table 1
  5. Some other projects related to installation of Green Houses were also completed by DRL, Tezpur with following details.DRL GH cvc table 2DRL GH cvc table 3

Installation of two Green Houses at DRL, Dett. At Tawang

DRL, Tezpur has two detachments in Arunachal Pradesh. One is at Salari, 190 km from Tezpur and another at Tawang, 380 km away from DRL, Tezpur. DRL Dett., Tawang is situated at 10,000 Ft high from sea level. This area is very less of vegetation due to extreme cold climatic condition. Hence cultivation of vegetables in open environments is not possible.

DRL, Tezpur has installed one Green House at DRL, Dett., Tawang and another Green House in same location is under construction. In this Green House, varieties of vegetable nursery is being raised and are being supplied to those Green Houses installed in different army unit for making vegetables nursery is being raised and are being supplied to those green houses installed in different army unit for making vegetables seeding.

Gross irregularities and violation of Purchase Management 2006 took place in issuing of supply orders for construction and installation of Green Houses at DRL, Tezpur.

One case as case study is submitted herewith in which gross violation of purchase rules took place.DRL GH cvc table 4

(A)   Demand was initiated by Dr. RKR Singh, Technical Officer ‘C’ with following details:DRL GH cvc table 5

(B) Open Tender No. DRL/OT/13-14 was published in Newspapers and DRDO website with following details. DRL GH cvc table 7

(C) Based on the said open tender, supply order was issued with following details.DRL GH cvc table 8

 

(D)  Under Supply Order dated 26.12.2013, Job Completion Certificate was issued from DRL, Tezpur vide letter No. DRL/OT/HAR/11/13-14/S-73 dated with following details:DRL GH cvc table 9

(E)  Unique Power Systems is registered at Andhra Pradesh Commercial Tax Department with TIN – 37720549449 and date of registration 02-06-2014 under VAT and CST commodity MACHINERY, Works Contracts; ELECTRICAL TRANSFORMERS, SWITCH GEARS; MACHINERY SPARES, ALL KINDS OF CABLES; COPPER WIRE.

This vendor has its own website uniquepowersystems.in and Mr. Subbarao Ramisetty is proprietor of this firm. According to the information available on the website “Unique Power Systems” are a leading organization engaged in trading and supplying a variety of Electrical and Electronics Items. We have in store a technically superior range of Transmission Line, Substation, Insulator, Vacuum Circuit Breaker, Generator, Transformer, Speed Breakers, Flexible Cable and MCCB.

6. One Open Tender No. DRL/OT/14-15 was published in 2014 for 05 Green Houses with EMD Rs. 100,000. The demands were made in said open tender and case is under process.

IRREGULATIES AND VIOLATION OF PM 2006 IN CONSTRUCTION & INSTALLATION OF GREEN HOUSES AT DRL, TEZPUR

  • Very junior officer of rank Technical Officer ‘C’ was appointed as Project leader with only one member (STA) in the project which is major project activity of DRL, Tezpur. In past project of Green House more than Five Officer/staff were involved with senior most scientists as Project Head. Keeping only officials in such a big project smacks something wrong at end of Director/CFA.
  • RKR Singh, TO ‘C’ was not authorized to indent case of Rs. 50 L while other several senior scientists were available at DRL, Tezpur. This violates section 4.6.2 and 4.6.3 of PM 2006. Demands costing Rs 50 lakh and above: Initiation by Scientist E and above countersigned by project or group head.
  • The demand was initiated as well as countersigned by Dr. RKR Singh, TO ‘C’ and approved by Dr. Vijay Veer, Director. This violated the various sections of PM 2006.
  • Item cost was inclusive of taxes while as per PM 2006 all taxes should be separately calculated and added in basic cost of the item. Material cost, construction and installation cost should be mentioned separately.
  • In demand unit price was mentioned as Rs. 9,92,331.00 but how the indenter arrived at his cost. How he done cost estimation or he submitted any quotation in record for this cost. The figure of unit cost as mentioned by indenter is unrealistic and fabricated.
  • Board of Officers was not constituted for inspection of constructed Green Houses and handing over to users Amy Units. Issue Voucher should be issued to each Green House separately. Job completion report should be endorsed by Board of Officers.
  • Splitting of cases to keep demand cost with in financial powers of Director as in project of Rs. 4.18 crore small-small cases costing just below Rs. 50 L are initiated. Two open tenders no. DRL/OT/13-14 and DRL/OT/14-15 each costing Rs. 50 L was published within same project by splitting of the cases. One tender should be published to avoid splitting of cases and get better prices and consolidated demand should be raised for whole project as PDC was only 36 months. Hence PM 2006 was grossly violated by Dr. Vijay veer, Director/CFA.
  • As per PM 2006 the Supply Order should be signed for and on behalf of ‘President of India’ in DRDO.MM.16 but this section of PM 2006 was grossly violated by Dr. Vijay Veer, Director/CFA. The supply orders issued by DRL, Tezpur are not in format DRDO.MM.16 and these SO are not signed for and on behalf of India, which is very serious matter as per PM 2006.
  • Cost Estimation not made properly figure of unit price is unrealistic.
  • TEC Report was ignored and parameters effecting installation of Green House like soil testing, wind speed, altitude etc not considered by Director and TPC done without clearance of TEC Report.
  • Gross violation of Purchase Rules, Supply Order not in proper format signed on behalf of Director, DRL, Tezpur, TO ‘C’ is not authorized to indent case up to Rs. 50 L. No sales tax, service tax or VAT charged and prices were inclusive of all taxes. Service tax Registration Number.

7.    The departmental action under CCS(CCA) Rules 1965 and PC Act 1988 may kindly be initiated against Vijay Veer, Director, DRL, Tezpur for said misconduct and misuse of power.

In light of above  facts and evidences it is  requested to CVC to setup a high level inquiry to inspect the procurement process and violation of PM 2006 at DRL, Tezpur by Dr. RKR Singh, TO’C’ and Dr. Vijay Veer , Director in construction and installation of all these Green Houses.

Regards

Prabhu  Dandriyal,                                                                                                                             21-Sunderwala, Raipur, Dehradun -248008                                                                               Phone 0135- 2787750, Mobile- 9411114879,e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

  • Enclosed – Photo of DRL, Green House, Twang
    Rs 9 Lakh Green House-Tawang-DRL
    Rs 9 Lakh Green House-Tawang-DRL

    DRL GH cvc anx 1DRL GH cvc anx 2DRL GH cvc anx 3

     

ILLEGAL APPOINTMENT OF MS. SHWETA SINGH, SRF AT DRL, TEZPUR BY DR. VIJAY VEER, DIRECTOR, DEFENCE RESEARCH LABORATORY(DRL), DRDO,TEZPUR

To,                                                                                           Date – 25th May 2015                         Shri Manohar Parikar                                                                                                                       Defence Minister                                                                                                                               Room No -104 South Block,                                                                                                           Ministry of Defence                                                                                                                           New Delhi-110011

SUBJECT: IRREGULARITIES IN APPOINTMENT OF MS. SHWETA SINGH, JRF and SRF AT DEFENCE RESEARCH LABORATORY (DRL), TEZPUR BY DR. VIJAY VEER, DIRECTOR, DRL, TEZPUR, DRDO, MIN. OF DEFENCE

Sir,

Within last 10 years a bunch of DRDO officials running DRDO with their own made rules whether it is related of procurements or recruitments like the following case of recruitment of Ms Sweta Singh as JRF/SRF in DRL, DRDO, Tezpur by  Dr. Vijay Veer, Director is a small example of manipulations in GOI laid down rules.

  1. Defence Research Laboratory (DRL), Tezpur (Assam) is an establishment under Defence Research & Development Organisation (DRDO), Ministry of Defence.
  2. Vijay Veer, Scientist ‘G’ is Director, DRL, Tezpur with effect from 01 March 2012. Prior to him Dr. Lokendra Singh was Director of this establishment since the year 2010 to 28 Feb 2012.
  3. A.K. Singh is Director (Personnel), Dte. Of Personnel (DOP) at DRDO HQ, DRDO Bhawan, New Delhi with effect from 01 Dec 2012 and prior to this he was posted as Director, DHRD at DRDO HQ from Oct 2010 to 27 Feb 2013.
  4. A.K. Singh, Director (Personnel) hails from Aligarh, Uttar Pradesh which is evident from his IPR available at DRDO website. Copy of IPR is attached as Annexure No. -1.
  5. Shri Virendra Pal Singh (V.P. Singh) who is an official of Arunachal Pradesh, Government also hails from Aligarh, Uttar Pradesh.
  6. Lokendra Singh, Dr. Vijay Veer and Dr. RKR Singh, TO ‘C’, Estate Officer and Shri V.P. Singh are good friend and know each other very well as Shri V.P. Singh regularly staying at DRL, Guest House, Tezpur since past several years while he is not an DRDO/Service employee and no office/project of Arunachal Pradesh Government is existing at DRL, Tezpur. The rent of VIP suits at DRL, Guest house is only Rs. 50 -100 while the same accommodation at Hotel in Tezpur is about Rs. 2000-2500. The reasons why Dr. Lokendra Singh, Ex-Director, DRL and Dr. Vijay Veer, Director, DRL giving such kind of privilege to Shri V.P. Singh is matter of investigation?
  7. Even the Arunachal Pradesh Government Vehicle with Registration No. AR 01E 0879 is regularly parked at House of Dr. RKR Singh, TO ‘C’, Estate Officer, DRL, Tezpur. The same Government vehicle was also found in New DRL Guest House. The Photograph of Vehicle No. AR 01E 0879 of Arunachal Pradesh Government parked at New DRL Guest House is attached as Annexure No. -2.
  8. A.K. Singh, Director(Personnel) , DRDO HQ is holding sensitive posts continuously since past 8 years as Director, CEPTAM, Director, DHRD and Director(Personnel), which is against CVC Guidelines. I have filed three complaints against him to PMO & MOD on charges of Corruption. He was holding the post of Director, DHRD from October 2010 – 27 February 2013. DHRD is responsible for recruitment of JRF, SRF and Research Associates in various DRDO establishments and formulates guidelines for their appointments etc.

This complaint is regarding irregular appointment of Ms. Shweta Singh D/o Shri V.P. Singh, Aligarh as Junior Research Fellow (JRF) followed by  Senior Research Fellow (SRF) with two years extension by Dr. Vijay Veer, Director, DRL, Tezpur and extra payment of stipend while she was absent from DRL, Tezpur for about one year.

Brief Facts of the Case

  1. Shweta Singh, d/o Shri V.P. Singh was appointed as Junior Research Fellow (JRF) at DRL, Tezpur for a period of two year with effect from 03.10.2011 to 02.10.2013. She joined at DRL, Tezpur on 03.10.2011 and posted at Pharmaceutical Technology Division.
  2. Shweta Singh was getting stipend of Rs. 16000/- month from DRL, Tezpur. She remains absent/highly irregular at DRL, Tezpur during January 2013 to December 2013. Meantime she got married on 28 November 2013 at Aligarh (Uttar Pradesh). She joined back at DRL, Tezpur on 13 January 2014.
  3. In reply to one letter from Admin Division of DRL, Tezpur, Dr. P. Chattopadhyay, Group Head, Pharmaceutical Technology Division informed to Director, DRL, Tezpur vide his letter dated 07-10-2013 on Subject “Absent of Ms. Shweta Singh, JRF, Pharmaceutical Technology Division absent from 8th July 2013” stating thereby That “I am inform you that Ms Shweta Singh, JRF, Pharmaceutical Technology Division absent from 8th July 2013”. Copy of the letter dated 07.10.2013 is annexed as Annexure No. -3.
  4. On direction of Dr. Vijay Veer, Director, DRL, Ms. Shweta Singh, JRF got full stipend of the period while she was absent from DRL, Tezpur. Some complaint and RTI were filed by some persons in the matter therefore under pressure of PCDA, Dr. Vijay Veer ordered to Admin & Finance division to recover one month stipend from her. Rs. 17600/- was recovered vide letter 51/13/AE dated 28/10/2013. Copy of the letter No. 51/13/AE dated 28/10/2013 is annexed as Annexure No. -4. The same amount was deposited by Ms. Shweta Singh vide Chq. No. 508551 dated 8/5/2014. Copy of the letter dated 08/05/2014 sent from Mrs. Shweta Singh, SRF to Director, DRL regarding “Return of Excess Payment”, is annexed as Annexure No. -5.
  5. I submitted an application under RTI Act 2005 dated 26 July 2014 in the matter of Ms. Shweta Singh, JRF to CPIO, DRDO HQ, New Delhi but till date CPIO, DRDO did not replied. Copy of the application under RTI Act 2005 dated 26 July 2014 is attached as Annexure No. -6.
  6. Detailed attendance sheet of Ms. Shweta Singh from Biometric Punching Attendance System of said period may establish her long absence from DRL, Tezpur. But extra payment for only one month and three days of stipend was recovered from her by DRL, Tezpur on direction of Dr. Vijay Veer. Due to expose of the matter, DRL stopped her stipend with effect from 03 October 2013. Till date she did not get any stipend from DRL, Tezpur.
  7. As per the DO-II No. 07 dated 20.04.2012, her tenure for JRF was automatically ended on 02.10.2013. She was absent in month of October 2013 but Dr. Vijay Veer gave another big favor to her. He constituted an Assessment Committee consisting of three senior officers namely Dr. H.K. Gogoi, Scientist ‘F’, Shri Indrajeet Baruah, Scientist ‘F’ and Dr. P. Chattopadhyay, Scientist ‘D’  vide DO-II No. 07 dated 25.04.2014 to gave extension of one year to Fellowship of Ms. Shweta Singh, JRF with retrospective effect from 03.10.2013 while she was not present during said period in DRL, Tezpur and appointed her as SRF. Copy of the DO-II dated 25.04.2014 is annexed as Annexure No. -7. It was mentioned in said DO-II dated 25.04.2014 that “Extension of tenure of fellowship of the above named individual with effect from 3rd October 2013 for one year as per recommendation of the Assessment Committee held on 24th March 2014 at DRL, Tezpur”.
  8. As per DHRD, DRDO guidelines  extension for one year can only be provided to a JRF candidate after his/her presentation before Assessment Committee constituted by Director well before the expiry of tenure of 02 years of the JRF.
  9. It is big manipulation and conspiracy that Ms. Shweta Singh never appeared before the Assessment Committee and she got extension of one year with retrospective effect by Assessment Committee vide DO-II No. 07 dated 25.04.2014. The said Assessment Committee was constituted by Dr. Vijay Veer, Director, DRL, Tezpur in the March 2014, which held the meeting on 24 March 2014.
  10. The recommendation of the Assessment Committee was approved by Dr. Vijay Veer, Director and Ms. Shweta Singh got extension for fellowship as SRF for one year from 03.10.2013 to 02.10.2014 vide DO-II No. 07 dated 25.04.2014.
  11. Surprisingly, while tenure of Ms. Shweta Singh, JRF was automatically ended on 02 October 2013 vide DO-II NO. 07 dated 20.04.2012, then why Dr. Vijay Veer allowed her to work in DRL, Tezpur till April 2014 and gave ex-post-facto sanction without any authority?
  12. Shweta Singh got married on 12 November 2013 and She was absent during the period from 03 October to 12 January 2014, then why DRL, Tezpur allowed her to join at DRL, Tezpur while her tenure was ended automatically on 02.10.2013?
  13. Extension for fellowship with retrospective effect is completely illegal as (i) Tenure of JRF remains only for two years, it cannot be extended in case of Ms. Shweta Singh as her term expired on 02 October 2013. (ii) With back date appointments/extensions to fellowship are not permissible under any rule of DRDO and GOI.

Hence extension to fellowship wef 03 October 2013 for one year by order dated 25.04.2014 is totally illegal and irregular. It should be cancelled.

  1. She was getting stipend of Rs. 16000/- per month as JRF and Rs. 18000/- per month as SRF.
  2. Under pressure of complaint to PCDA and RTI Application to CPIO, DRDO, DRL, Tezpur stopped the payment of her stipend with effect from 03 October 2014 up to till date. But to favor Ms. Shweta Singh, Dr. Vijay Veer ordered Finance Division to make bill for payment of stipend to Ms. Shweta Singh and accordingly a bill of approximately Rs. 2,12,439/- was made and sent to PCDA, New Delhi in February 2015 vide DRL letter No. 30/PAS/JRF/SRF/2014-2015 dated 02.02.2015. Copy of the bill sent to PCDA, New Delhi is annexed as Annexure No. -8.
  3. PCDA returned the said bill with following objections: (i) To submit attendance sheet of the Ms. Shweta Singh, (ii) Authority letter by which she was appointed as SRF by Director, DRL, Tezpur vide their letter dated 16.03.2015. Copy of the letter received to DRL, Tezpur dated 16.03.2015 from Accounts Officer, PCDA, Delhi is annexed as Annexure No. -9.
  4. Despite the above incidences, Dr. Vijay Veer again constituted Assessment Committee in November 2014 comprising of HK Gogoi, Scientist ‘F’, Dr. P. Chattopadhyay, Scientist ‘D’ , Dr. SN Dutta, Scientist ‘C’ and Shri S. Doley, TO ‘D’. This committee has a meeting on 24.11.2014 and recommended the 6 months extension to Ms. Shweta Singh, SRF for the fourth year. The minutes of the meeting was approved by Dr. Vijay Veer, Director, DRL, Tezpur on the same day 24.11.2014. Copy of the Minutes of Assessment Committee is annexed as Annexure No. -10.
  5. DRL, Tezpur has not submitted any reply to objections of PCDA till date and she did not get any payment since January 2014 to till date from DRL, Tezpur.
  6. Vijay Veer, Director, DRL, Tezpur is running this JRF-SRF business since his joining at DRL, Tezpur and normally per year 10-12 candidates being appointed by irregular means. Recently in the year 2014 and 2015 more than 25 vacancies were advertised. This year Interview going to held on 19 May 2015. Copy of the advertisement for the year 2014 and 2015 for recruitment of JRF, SRF and RA are annexed as Annexure No. -11 and Annexure No. -12.

Irregularities and Corruption by Dr. Vijay Veer in appointment of Shweta Singh, JRF

  1. Vijay Veer, Director, DRL, Tezpur unduly favored Ms. Shweta Singh and gave her an illegal extension in fellowship with intent to get pecuniary advantage to her by misusing his official position.
  2. Not only to her, Dr. Vijay Veer is giving high privileges to his father Shri V.P. Singh by allowing him to stay at DRL, Guest House since long time.
  3. This act of Dr. Vijay Veer amounts conspiracy against Government with ill motives to make a loss to public money and gave financial benefit to Ms. Shweta Singh by misusing his powers and official position by gross violation of DRDO Guidelines.
  4. Vijay Veer is attempted to make a payment of about Rs. 2,12,439/- in lump sum to Ms. Shweta Singh despite knowing her extension to fellowship was illegal.
  5. The said misconduct and misuse of power for giving pecuniary advantage to Ms. Shweta Singh, JRF by Dr. Vijay Veer, Director, DRL, Tezpur comes under section 13.(1)(d) of Prevention of Corruption Act 1988.

In light of above evidences it is  requested to you Sir,  issue appropriate direction to Secretary, DRD, South Block, New Delhi to:

  • Cancel the appointment order of Ms. Shweta Singh as JRF and SRF at DRL Tezpur and stop her payment till finalization of the complaint.
  • Not to award Ph.D. degree to Ms. Shweta Singh as her appointment as SRF is illegal and she was absent during her tenure as JRF in 2013.
  • Issue order to recover extra payment from Ms. Shweta Singh which DRL, Tezpur paid to her while she was on long absent from DRL, Tezpur for more than one year.
  • Setup an enquiry against Dr. Vijay Veer under CCS (CCA) Rules 1965 and Prevention of Corruption Act 1988 to give undue favour to Ms. Shweta Singh, SRF, DRL, Tezpur.
  • Cancel the recruitment process of JRF and SRF in DRL, Tezpur for the year 2015.

Regards

Prabhu  Dandriyal,
21-Sunderwala, Raipur, Dehradun -248008                                                                               Phone 0135- 2787750, Mobile- 9411114879,                                                                                  e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Enclosed – Annexure No. 1 to 12.

Copy of IPR of Dr. A.K. Singh, Director (Personnel), DRDO HQ
Copy of IPR of Dr. A.K. Singh, Director (Personnel), DRDO HQ
The Photograph of Vehicle No. AR 01E 0879 of Arunachal Pradesh Government parked at New DRL Guest House
The Photograph of Vehicle No. AR 01E 0879 of Arunachal Pradesh Government parked at New DRL Guest House

 

Copy of the letter dated 07.10.2013 from Dr. P Chattopadhyay, Head, Pharmaceutical Technology Division
Copy of the letter dated 07.10.2013 from Dr. P Chattopadhyay, Head, Pharmaceutical Technology Division
sweta case anx4
Copy of the letter No. 51/13/AE dated 28/10/2013 related to refund of excess payment to Ms Shweta Singh
Copy of the letter dated 08/05/2014 sent from Ms. Shweta Singh, SRF to Director, DRL regarding “Return of Excess Payment”
Copy of the letter dated 08/05/2014 sent from Ms. Shweta Singh, SRF to Director, DRL regarding “Return of Excess Payment”
Copy of the application under RTI Act 2005 dated 26 July 2014
Copy of the application under RTI Act 2005 dated 26 July 2014

Annexure-7

DO Part Order No – II No. 7 Dated 25/04/2014

(b) – MRS. SHWETA SINGH- JRF

Ref: – This Lab DO Part Order No – II No. 7 Dated 25/04/2012. Extension of tenure of the fellowship of the above named individual with effect from 3rd October 2013 for one year, as per recommendation of Assessment Committee held on 24th March, 2014 at DRL, Tezpur (Assam)

Copy of the bill sent to PCDA, New Delhi in respect of Ms. Shweta Singh, SRF vide DRL letter No. 30/PAS/JRF/SRF/2014-2015 dated 02.02.2015
Copy of the bill sent to PCDA, New Delhi in respect of Ms. Shweta Singh, SRF vide DRL letter No. 30/PAS/JRF/SRF/2014-2015 dated 02.02.2015
sweta case anx9
Copy of the letter received to DRL, Tezpur dated 16.03.2015 from Accounts Officer, PCDA, New Delhi
Copy of the Minutes of Assessment Committee held on 24.11.2014.
Copy of the Minutes of Assessment Committee held on 24.11.2014.
Copy of the advertisement for JRF for the year 2014
Copy of the advertisement for JRF for the year 2014
Copy of the advertisement for JRF for the year 2015
Copy of the advertisement for JRF for the year 2015

 

 

RTI-DRL,DRDO- NATURALLY VENTILATED GREEN HOUSE

To,                                                                                           Date 17th May 2015                             Dr. RB Sharma,                                                                                                                                  CPIO, DRDO HQ, Min. of Defence,                                                                                               DRDO Bhawan, Rajaji Marg,                                                                                                           New Delhi-110011

Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of NATURALLY VENTILATED GREEN HOUSE procured by DRL, DRDO, Tezpur.

  1. Provide the vendors list of successful suppliers who received the supply orders from Director, DRL, Tezpur for installation, fabrication and commissioning of Naturally Ventilated Green Houses at various locations in NE Region.
  2. Provide the registration no of DRL or any other DRDO establishment of successful suppliers who received the supply orders from Director, DRL, Tezpur for installation, fabrication and commissioning of Naturally Ventilated Green Houses at various locations in NE Region.
  3. The total Numbers of Naturally Ventilated Green Houses that were installed and fabricated by private vendors on supply orders from Director, DRL, Tezpur from 1 April 2009 to 31 March 2015
  4. The number of cases of Naturally Ventilated Green Houses that are under process procurement after tender opening.

Regards

Prabhu  Dandriyal,
21-Sunderwala, Raipur, Dehradun -248008                                                                               Phone 0135- 2787750, Mobile- 9411114879, id prabhudoon@gmail.com  website www.corruptionindrdo.com

  Registration Number MODEF/R/2015/61234

High Level Inquiry on complaints against Dr. A.K. Singh, Director (Personnel), DOP, DRDO HQ, DRDO, Min. of Defence, New Delhi.

To                                                                                                       Date 13th May 2015                 Shri Manohar Parrikar,                                                                                                                     Defence Minister,                                                                                                                               Ministry of Defence,                                                                                                                           Room No -104, South Block                                                                                                             New Delhi-110011

Subject

High Level Inquiry on complaints against Dr. A.K. Singh, Director (Personnel), DOP, DRDO HQ, DRDO, Min. of Defence, New Delhi.

Sir,

I have submitted following complaints against Dr. A.K. Singh, Director (Personnel), DOP, DRDO HQ, DRDO, Min. of Defence, New Delhi to Hon’ble Prime Minister as well as to your office. Details of the complaints are given belowAK Singh remider letter table

As a matter of fact, Dr. A.K. Singh, Scientist ‘G’ is posted in New Delhi since his joining at INMAS, New Delhi since 1988. He is posted at New Delhi continuously since past 27 years and never been transferred out from Delhi.

Being posted as Director (Personnel) at DRDO HQ, Dr. A.K. Singh is misusing his official position to influence the inquiry of complaints filed against him. You may surprise that till date no action has been taken against Dr. A.K. Singh by Ministry of Defence despite my all complaints submitted to PMO were forwarded to MOD by PMO for necessary action.

No action against corrupt officers by competent authority lead frustration in mind of complainant and this forces the complainant to approach to Hon’ble Court by means of PIL to request to Court for action against Corrupt officer(s).

Recently, I was compelled to file one PIL on Corruption cases at DMSRDE, Kanpur against one Dr. A. K. Saxena, while in that case  MOD was helpless because DRDO CVO and DRDO Hqrs did not taken any action against Dr. A.K. Saxena, Director, DMSRDE, Kanpur. The two fact finding committees constituted for only for eye wash.

Sir, you will appreciate that our judiciary is overloaded from court cases and whistle blowers and anti-corruption/RTI activists should not be forced to approach again and again to Hon’ble Court for filing PIL for proper action on complaints.

It is  requested kindly,  transfer Dr. A.K. Singh, Director (DOP) urgently from DRDO HQ to any other Lab from Life Sciences Cluster and order the High Level Inquiry to investigate my complaints against Dr. A.K. Singh as stated above in speedy and time bound manner.

With humble regards,

Regards

Prabhu Dandriyal,
21-Sunderwala, Raipur,Dehradun-248008,                                                                                 Phone 0135- 2787750, Mobile- 9411114879,                                                                                 e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Submission of the facts of deliberate Acts and omissions of illegality, criminal offences under IPC 1860, misconducts under CCS Conduct Rules, 1964 and criminal misconducts under prevention of corruption Act 1988 committed in 2005 for conducting discreet independent enquiry and for registration of FIR against the prima facie guilty officers of AFHQ Cadre of the O/o JS (T) & CAO, MoD and DRDS officers of DRDO, MoD posted in DRDO HQ in 2005.

To                                                                                                       14th April 2015                         Hon’ble Shri Manohar Parrikar,                                                                                                     Defence Minister,Room No -104,                                                                                                   South Block,New Delhi-110011

Subject: Submission of the facts of deliberate Acts and omissions of illegality, criminal offences under IPC 1860, misconducts under CCS Conduct Rules, 1964 and criminal misconducts under prevention of corruption Act 1988 committed in 2005 for conducting discreet independent enquiry and for registration of FIR against the prima facie guilty officers of AFHQ Cadre of the O/o JS (T) & CAO, MoD and DRDS officers of DRDO, MoD posted in DRDO HQ in 2005.

Sir,                                                                                                                                                                 Please find the facts of deliberate Acts and omissions of illegality, criminal offences under IPC 1860, misconducts under CCS Conduct Rules, 1964 and criminal misconducts under prevention of corruption Act 1988 committed in 2005 for conducting discreet independent enquiry and for registration of FIR against the prima facie guilty officers of AFHQ Cadre of the O/o JS(T) & CAO, MoD and DRDS officers of DRDO, MoD posted in DRDO HQ in 2005. The Acts & Omissions are enclosed herewith in Annexure ‘A’ in a tabular form containing pages.

It is requested to conducted discreet complete enquiry in this regard exclusively from an independent authority like CVO of MoD and kindly register FIR against all those concerned retired and serving officers of AFHQ Cadre and DRDS Cadre of DRDO posted in DRDO HQ in 2005 if it is corroborated on documentary basis that they indeed committed the offences & misconducts mentioned in the Annexure ‘A’ enclosed herewith.

It is additionally request and caution your good self that the present regime in DRDO headed by Scientists in the O/o DOP, DHRD, CC R&D (HR) are in habit not to supply or adopt dilatory tactics in supplying the concerned original documents to the inquiry committee or they might even dilute the whole issue by constituting high power fact finding committee of scientists of DRDO who always put their best efforts to save the prima facie guilty officers.

It is therefore requested that all the concerned original documents available in DRDO HQ, New Delhi may kindly be called for in the O/o CVO, MoD at a very short notice within in a maximum period of a week so that saviors & sympathizers of the prima facie guilty officers are not able to protect the guilty officers.

I may kindly be intimated about the final outcome of my formal complaint at address for communication.

Regards

Prabhu Dandriyal,
21-Sunderwala, Raipur, Dehradun – 248008                                                                               Phone 0135- 2787750, Mobile- 9411114879,                                                                                 e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Enclosures:-

  1. Annexure ‘A’ (containing 04 (four) pages)
  2. Annexure ‘B’ (containing 04  (four) pages) of the copy of the Advt. published at page no 28 of the employment news dated 06-12 August 2005, copy of the RTI application dated 25-04-2014 submitted to the CPIO of DRDO HQ, New Delhi and copy of the RTI Reply dated 01-05-2014annexure A page1annexure A page2annexure A page3annexure A page4
    RTI DRDO 25 April 2014
    RTI DRDO 25 April 2014
    RTI DRDO page 2 25 April 2014
    RTI DRDO 25 April 2014
    rti reply DRDO
    rti reply DRDO

    advt t chndrabanu case

     

Compliant against the deliberate misconduct of Dr. A K Maini voluntarily retired scientist ‘H’ & Director of LASTEC, Delhi, DRDO, MOD.

To                                                                                                                 12th April 2015               Hon’ble Shri Manohar Parrikar,                                                                                                     Defence Minister,Room No -104,                                                                                                   South Block,New Delhi-110011

Subject:  Compliant against the deliberate misconduct of Dr. A K Maini                            voluntarily     retired scientist ‘H’ & Director of LASTEC, Delhi,                          DRDO, MOD.

Sir,

Please find following informations of deliberate misconducts committed by Dr. A K Maini voluntarily retired scientist ‘H’ & Director of LASTEC, Delhi, DRDO, MOD.

  1. A K Maini had been submitting false “Nil” immovable returns in his entire service of 36 years rendered in DRDO as Group ‘A’ Gazette officer with effect from 1978 to 09-06-2014.
  2. Didn’t submit his permanent home town declaration during his entire service still he illegally availed Home town LTCs to Jammu many times.
  3. Made entry in his own handwriting on 02-12-1999 on the 2nd page of the 2nd volume of his service book about his permanent home town after 21 years from the date of his initial joining in DRDO in 1978.
  4. Deliberately made another entry about his Permanent Home Town after some years during his tenure of Directorship of LASTEC, Delhi (changing his earlier entered Pmt. Home Town) on the same 2nd page of the 2nd  volume of his service Book, without formal submission of a request for change of his Permanent Home Town, with a clear motive to create confusion in his initial entry made on 02-12-1999.
  5. Changed his name from Anil Kumar to Anil Kumar Maini in official records without submitting any formal request in this regard & without undergoing the prescribed procedure in vogue.
  6. Even gave Laboratory Awards to those Scientists of LASTEC, Delhi in 2011 who were members of the Award Selection Committee of LASTEC, Delhi
  7. Even nominated ineligible officer of LASTEC, Delhi i.e. Smt. Sangeeta Talwar, Accounts Officer of LASTEC Delhi to represent LASTEC Delhi in the interview board of the CEPTEM, Delhi for the interviews of the candidates of admin and allied cadre who passed written examination of CEPTEM 06 since minimum level of nomination was SAO-II of DRDO. Proposal of eligible SAO-II of LASTEC Delhi was formally moved but Dr. A K Maini not only did not approve it but he pressurized his sub-ordinate officers to initiate new proposal so that he could nominate the ineligible favorite officer thereby snatching a rightful opportunity of the rightful claimant.
  8. Deliberately did not make routine transfers of the officials and officers of LASTEC Delhi during his tenure of directorship of LASTEC Delhi who was holding sensitive posting/appointments thereby directly violated the standing policy of the DOP&T and CVC. He even did not comply the express orders of the DRDO HQ issued from time to time in this regard thereby created opportunities for corruption and nepotism.
  9. Even made undue favor to the Amity University, Noida, UP, for his personal gain in the form of obtaining PhD from same University, which includes inviting the students of Amity university & its Chairman Dr. Ashok Chauhan as Chief Guest in the annual raising day of LASTEC Delhi in 2010 & giving them lunch and other hospitalities from the funds of the state exchequer besides breaching the security of METCALFE House Complex of Civil Lines Delhi.
  10. Even availed leave for repair of his House in Delhi still he submitted false Nil immovable property return for the same calendar year.
  11. Never formally intimated administration division of LASTEC Delhi about his local tours during the entire period of his directorship of LASTEC Delhi thereby showed himself present on duty even on those dates when he remained at his home for personal work/reasons etc. he thereby blocked the opportunity of the DDO of LASTEC Delhi to make his salary only for those days when he was either on duty or on sanctioned leave. This is evident also from the number of the days leave availed by him in immediate 03 preceding years before his elevation to the post of Director LASDTEC Delhi and the leave taken by him during the tenure of his Directorship of LASTEC Delhi.
  12. Castigated the legitimate powers of the senior most officer of admin cadre of DRDO posted in LASTEC Delhi by depriving him from opening the official DAK received from outside by instructing verbally the officer in-charge of Diary & dispatch section of LASTEC Delhi to send the official DAK received from outside to his personal assistant thereby creating an opportunity for himself to not to bring some official DAK in the records of LASTEC Delhi. this illegal practice is still being continued in LASTEC Delhi in addition to many other laboratories of DRDO to serve the vested interest of the directors of the LABs of DRDO.
  13. Even tacitly got issued repeat supply orders many times in succession at very short intervals for purchase of stores in LASTEC Delhi through his sub-ordinate officers by splitting the supply order to avoid sanction of the higher authorities of DRDO HQ during his entire tenure of Director of LASTEC Delhi.
  14. Even tacitly got issued supply orders in favor of those firms who were either in collusion with other suppliers/firms or which were fake firms.
  15. Even deliberately delayed in according his approvals to the projects Dr M N Ready Scientist ‘G’ of LASTEC Delhi which attracted audit objections which are still pending.
  16. Gave outstanding comments in the APRS of Shri Ghai, the then scientist ‘F’ & present scientist ‘G’ of LASTEC Delhi on extraneous considerations/ grounds simply because Shri Ghai mentioned the research done by him & by other scientist of LASTEC as joint research of him & of Son of Shri A K Maini. The outstanding comments given by Dr. A K Maini in the APAR of Shri Ghai on the above mentioned extraneous grounds begged promotion to the post of Scientist ‘G’ to Shri Ghai & other deserving scientist ‘F’ of LASTEC felt let down.
  17. A K Maini was instrumental to select Shri Amit Kumar Chawla office Assistant to the post of STA-B in LASTEC through LDCE by putting illegal pressure on the concerned selection committee constituted in LASTEC in 2011 although the diploma in Engg. Discipline awarded by Janaradan Rai Nagar Rajasthan Vidyapeeth, Udaipur (deemed to be university) & obtained through distance education mode from the off campus study center of Delhi is not valid Diploma to make him eligible to the post of STA-B in DRDO through LDCE exam.
  18. A K Maini even approved illegal permission to Shri Amit Kumar Chawla to attend classes for study of LLB up 09:00 AM even on working days in an education institution which is not less than 15 kms away from the office campus of LASTEC delhi disregarding the fact that the working hours of LASTEC are 09:00 AM to 05:30 PM. This favor was extended to Shri Amit Chawla just because he was working in the secretariat of Dr. A K Maini.
    1. The above mentioned deliberate misconducts of Dr. A K Maini were not only deliberately overlooked by the vigilance officer of LASTEC Delhi but also by the director of vigilance and security of DRDO HQ New Delhi which paved the way for acceptance of his voluntary retirement from service but also it made him immune from any vigilance/disciplinary inquiry against his deliberate misconducts and illegal acts.

I therefore request you to kindly ensure conducting of discreet inquiry on each and every issue raised in this complain from a independent authority specifically dis-associating any scientist & technical officer of DRDO to bring the prima-facie guilty Dr. A K Maini to the book before he goes scot free by getting his pension & other retirement benefits since his pension case is still under scrutiny containing one of the misconduct of Dr. A K Maini mentioned above.

Regards

Prabhu Dandriyal,
21-Sunderwala, Raipur,Dehradun-248008,                                                                               Phone 0135- 2787750, Mobile- 9411114879,e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Intimation about deliberate illegal acts and omissions done in DRDO

To                                                                                                               12th April 2015                 Hon’ble Shri Manohar Parrikar,                                                                                                   Defence Minister,Room No -104,                                                                                                   South Block,New Delhi-110011

Subject: Intimation about deliberate illegal acts and omissions done in DRDO.

Sir,                                                                                                                                                     Please find following informations about the intentional unlawful acts and omissions made in DRDO, MOD

  1. Shri Krishan Kumar and Shri J B Singh retired joint Directors of AFHQ Cadre of the o/o JS (T) & CAO, MOD have been appointed as consultants in the ADA, Bangalore (an autonomous body under the administrative control of DRDO, MOD.) soon after their retirement on superannuation for the regular official work of ADA Bangalore and they have been illegally posted in the very sensitive establishment of DRDO i.e. RAC, Delhi. these two (02) consultants are used illegally to attend the court cases at CAT Delhi & High Court of Delhi filed by regular employees of the DRDO like court case of retired Scientist ’G’ Shri Virender Kumar of DEAL Dehradun. These consultants even illegally screen the applications of direct recruitments of scientist in DRDO & in such screening no meticulous screening is carried out by these consultants resulting selection of ineligible & relatives of senior scientist of DRDO as a quid –pro-que. Moreover there is imminent danger of favoritism and leakage of confidential and sensitive documents/information of RAC Delhi.
  2. Shri S T Rajan & Shri R Natrajan retired joint Directors of AFHQ Cadre of the o/o JS (T) & CAO, MOD have been appointed as consultants in the program office of DRDO HQ New Delhi in the missiles program for carrying out routine works for which already their relievers in the form of regular employees have been posted in DRDO HQ. these retired GOVT. servants are also appointed against the vacancies of ADA Bangalore and posted in DRDO HQ New Delhi. they don’t belong to scientific or technical cadre. There is imminent danger of the leakage of the sensitive informations at their level.
  3. Shri V K Shrama retired joint Directors of AFHQ Cadre of the o/o JS (T) & CAO, MOD has been appointed as consultants in the o/o DOP, DRDO HQ New Delhi with the approval of the then defence minister of GOI by misrepresentation & distortion of the material facts particularly with regard to the actual need of hiring him as consultant. His services have been utilized for the assignments  for which he has not been appointed. There is imminent danger of leakage of the sensitive information.
  4. Dr. A K Singh, present DOP of DRDO HQ New Delhi has played an active role in illegal extension of the periods of consultancy and in new engagements of consultancies of the retired GOVT. servants which he carried out with deliberate misrepresentation and distortion of the material facts submitted to the various senior authorities of DRDO, MOD & to the defence minister.
  5. Shri A K Singh present DOP of DRDO HQ New Delhi did not take any initiative to suspend Shri G Malakondiah, the then CC R&D (HR of DRDO HQ) for his conviction in a contempt of court case of the high court of the judicature of Chennai on 24-sept-2014 although this conviction news came in almost all the important daily newspapers including Hindusthan times New Delhi edition. No convicted person can be retained in GOVT. service even for a single day if the news of his conviction comes to the notice of the concerned public authority through formal or informal channel. The stay granted to Shri Malakondiah on 26-09-2014 by the apex court was restricted to the implementation of the imprisonment and not his conviction. The convicted person was deliberately allowed an opportunity to influence the witnesses and to tamper, mend, amend, destroy, replace & concealment of the concerned documents against the public interest due to lake of devotion to duty and possession of doubtful integrity of the concerned officials of the DRDO HQ New Delhi.
  6. the number of retired officials of DRDO, AFHQ Cadre appointed as consultants, directly violating the rules of consultancy, for the regular work of DRDO has reached to the alarming point where regular employees are considering illegal interference of the consultants in their regular sphere of duties and are also feeling frustrated and de-motivated which is playing havoc on the output of the DRDO as an organization.

I hope that some appropriate concrete action would be taken against the concerned guilty officers of DRDO & all Deviations and distortions would be set right in the national interest.

Regards

Prabhu Dandriyal,
21-Sunderwala, Raipur,Dehradun – 248008                                                                               Phone 0135- 2787750, Mobile- 9411114879,                                                                                 e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

 

CONSTITUTION OF FAIR FACT FINDING INQUIRY COMMITTEE IN CASE OF COMPLAINT AGAINST DR. A.K. SINGH, DIRECTOR, Dte of Personnel (DOP), DRDO HQ

To                                                                                                    Date 27th March 2015               Shri R.K. Mathur                                                                                                                             Defence Secretary,Secretary,                                                                                                           Dte Research & Development (Addl. Charge)                                                                             &DGR&D, DRDO, Min. of Defence,                                                                                               Room No 101, South Block                                                                                                               New Delhi-110011

SUBJECT: CONSTITUTION OF FAIR FACT FINDING INQUIRY COMMITTEE IN CASE OF COMPLAINT AGAINST DR. A.K. SINGH, DIRECTOR, Dte of Personnel (DOP), DRDO HQ     

REFERENCE

  1.  Complaint dated 14 Nov 2014 submitted to Hon’ble Defence Minister on the subject “Breach of trust, criminal misconduct and gross violation of CCS (Conduct) Rules 1964 to misguide Hon’ble Defence Minister by Dr. A.K. Singh, Director (Personnel) , DRDO HQ, New Delhi”.
  2. Letter No. DVS/02/2053/P/63 dated 12 Feb 2015 from Dte of Vigilance & Security, DRDO, Min. of Defence, DRDO Bhawan, Rajaji Marg,New Delhi

Sir,

DRDO HQ is expert in constituting Fact Finding Committees in such a way that the first and final agenda is to any mean give the clean chit to allege officiasl. DRDO Hqrs. having a great track record for this.

  1. Sh Avinash Chander gave clean chit to Dr Arun Kumar, Ex DOP for involved in appointment of of his daughter, Dr W Selvamurthy’s daughter, Sh Bansal’s Daughter, Dr G. Elangovan’s wife etc. After intervention of Ex Defence Minister, Dr run Kumar suspended, facing disciplinary proceeding, his daughter Ms Swati & Mrs T Chandra Banu’s service annulled and rest Ms Geetha & Ms Dolly Bansal’s are in queue. The key person helping in this corrupt practice is Dr A K Singh, DOP, DRDO being staff officer of Dr W Selvamurthy the CC R&D (HR)
  2. Dr V Bhujanga Rao then CC R&D (HR) gave clean chit to Dr A K Maini, E Director LESTEC for giving CRS to Sh Praksh Singh, SAO, LASTEC, but what happened Sh Praksh Singh reinstate and Maini is fighting for his pension till date. The key person helping in this corrupt practice is Dr A K Singh, DOP, DRDO.
  3. Sh Avinash Chader made two Fact Finding Committees to find out Dr A K Saxena’s corrupt practices but only GOD or Dr A K Singh knows the truth. Now we are looking High Court Delhi for revealing the facts of Dr A K Saxena’s, Director, DMSRDE, Kanpur. The key person helping in this corrupt practice is Dr A K Singh, DOP, DRDO. Dr A K Singh submitted illegal affidavit to CAT Allahabad & High Court Allahabad to support most corrupt DMSRDE Director.
  4. Maj. Gen Ajay Gupta, Director, Vigilance is under pressure of Dr. A K Singh, DOP, DRDO, Hqrs because of Dr. A K Singh, DOP, DRDO, Hqrs aware all earlier co-operations done by Ajay Gupta with ex SA to RM.

It is requested that please see personally the investigation against Dr. A K Singh, DOP, DRDO, Hqrs. As you also aware that Dr. A K Singh role for harass Dr. Gauasal Khan, Sc D and Dr S Majumadar, Sc G in DIPAS. The reputation of DRDO administration is in the stake because of incompetent DOP, court cases are increasing day by day, officials are suffering sundry things like transfer/posting, SC/ST harassment and minority harassment cases are not dealing properly by DOP. After termination of Sh Avinash Chander Dr A K Singh’s illegal activities are down 50% but still your intervention is requested to give relief to DRDO officials from the panic of Dr A K Singh.

Regards

Prabhu Dandriyal,
21-Sunderwala, Raipur,                                                                                                                     Phone 0135- 2787750, Mobile- 9411114879,                                                                                 e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

RTI-DRDO-DMSRDE- Repeat orders

To,                                                                                                 22nd February 2015
Dr. RB Sharma, CPIO,
DRDO HQ, Min. of Defence,
DRDO Bhawan, Rajaji Marg,
New Delhi-110011

Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of  repeat order placed by Dr. A.K. Saxena, Director , DMSRDE, Kanpur.

As a matter of fact procurement cases under Global/Open/Limited tender takes longer time in finalization and as only few months left for superannuation (31st July 2015) of Dr. A.K. Saxena, thereby he is issuing repeat orders without any requirements of instrument/equipment/material so that cases may be materialised during his tenure.

Information sought –

  1. The number of repeat order placed in financial year 2013-2014 with repeat order justification.
  2. The number of repeat order placed in financial year 2014-2015 with repeat order justification.
  3. Output of item before placing the repeat order i.e. if item is equipment than logbook of uses, if material than product output.

The information is related to corruption not come under schedule –II exemption please finds enclose repeat order examples.

Enclose – TWO CASES OF REPEAT ORDER  

Regards

Prabhu Dandriyal,
21-Sunderwala, Raipur, Dehradun -248008
0135- 2787750, 9411114879,
prabhudoon@gmail.com, www.corruptionindrdo.com

Registration Number            MODEF/R/2015/60436repeat order example

RTI-PMO-DRDO

To                                                                                                       Date–21 February 2015
Shri Syed Ekram Rizwi,
Director & Central Public Information Officer,
Prime Minister’s Office,
South Block,
New Delhi – 110011

Hello,

Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of complaints against DRDO officials to Hon’ble Prime Minister, PMO.

  1. Implementation of IPR Information System in DRDO – is it exempted organisation for all GOI orders? dated- 28 July 2014
  2. Scraps the promotions for Scientist ‘F’ to Scientist ‘G’ in DRDO year 2011- dated 18 Oct 2014
  3. HR of DRDO – The Great Nuclear Medicine Scientist Dr. A.K. Singh posted as Director of Personnel at DRDO HQ.-dated 16 Oct 2014

 Information sought

  1. Status report of the complaints.
  2. Action on the complaints by PMO
  3. Copy of reply of DRDO on subject matter received by PMO
  4. If DRDO not replied till date than copy of reminder to DRDO if any from PMO on subject matter.

Regards

Prabhu  Dandriyal,
21-Sunderwala, Raipur,

Phone 0135- 2787750, Mobile- 9411114879,
e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Registration Number    PMOIN/R/2015/60465