To, 26th July 2014
Dr. RB Sharma, CPIO
DRDO HQ, Min. of Defence
DRDO Bhawan, Rajaji Marg
New Delhi-110011
Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of M/s Jangid Construction, RZF 40, Street No. 40, Sadh Nagar Part II, New Delhi 45. It is observed Dr Vijay Veer, Director, DRL, Tezpur giving undue favor to M/s Jangid Construction ignoring the guidelines providing in DRDO purchase manual 2005.
M/s Jangid Construction constructed Entomology Building in DRDE, Gwalior under supervision of Dr Vijay Veer and this old connection now continue in DRL, Tezpur. The all construction / renovation job of DRL, Tezpur are supposed to come under CCE(east) but it is observed all such work are given to M/s Jangid Construction with support sleeping firms. Most of cases are raised with following firms which itself the corruption evidence.
i) M/s Jangid Construction, RZF 40, Street No. 40, Sadh Nagar Part II, New Delhi 45.
ii) M/s Balaji Construction Co, Dwarka, Delhi 75
iii) M/s Kushi Enterprises, West Patel Nagar, Delhi 08
iv) M/s Bhagwati Enterprises, Shiv Block, Delhi 45
v) M/s MRN Group, New Delhi 40
vi) M/s M K Decorator, Palam Colony, Delhi 30
In most of the cases scientists of DRL, Tezpur split their demand so it can be execute through limited tenders with above firms, who is the boss ?
Provide the supply order of M/s Jangid Construction for Entomology Building, DRDE.
Provide the copy of all supply orders of M/s Jangid Construction in respect of DRL, Tezpur.
Note: the requested information is not come under exemption of schedule –II of RTI Act 2005. Since, March 2014 end DRDO stopped to provide information under shadow of exemption. It is requested in above para-one of this request it is clear cut mentioned the corruption/ favoritism/ abuse of power, so before denial of information your point wise explanation is required that the matter not pertain under corruption.
To, 26th July 2014
Dr. RB Sharma, CPIO
DRDO HQ, Min. of Defence
DRDO Bhawan, Rajaji Marg
New Delhi-110011
Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of Ms Sweta Singh, JRF, Pharma Tech Division, DRL, Tezpur.
She joined 3/10/2011 and doing PhD from Gauhati University and drawing fellowship @ 16000/month. She was absent from January 2013 to Febuary 2014 but it was observed that in this duration she continuously received fellowship amount. Her fellowship was extended for one year from 3/10/2013. After one RTI request against this illegal favor, Ms Sweta Singh returned an amount of Rs 17600.00 through cheque no 508551 dated 8/5/2014 in response of letter no 51/13/AE dated 28/10/2013.
Provide the total amount of fellowship given to Ms Sweta Singh, JRF, DRL, Tezpur
Provide the total days of present of Ms Sweta Singh, JRF, at DRL, Tezpur
Provide the proceeding noting of extension of fellowship after 3/10/2013 and copy of approval from HRD, DRDO
Provide the certify copy of DRL letter no 51/13/AE dated 28/10/2013.
Note: the requested information is not come under exemption of schedule –II of RTI Act 2005. Since, March 2014 end DRDO stopped to provide information under shadow of exemption. It is requested in above para-one of this request it is clear cut mentioned the corruption/ favoritism/ abuse of power, so before denial of information your point wise explanation is required that the matter not pertain under corruption. The above JRF sanction is preview of HRD, DRDO Hqrs.
To 23rd July 2014Sh. Samir Ranjan Amin,U/Secretary & CPIO,Room No – 340, Office of Director of Vigilance,B- Wing Sena Bhawan,Rajaji Marg, New Delhi -110105
Hello,
Kindly provide me with the following information requested under the purview of the Right to Information (RTI) Act, 2005 in respect of complaints against Dr. Arvind Kumar Saxena, Director, DMSRDE, Kanpur and as per CVC the complaints has been sent to CVO, MOD for further action, with reference No. 1323/2014/Vigilance 9, 3617/2014/Vigilance 9, 5022/2014/Vigilance 9, 13248/2014/Vigilance 9, etc.
Please provide the present status of all my complaints received by your office till date from CVC.
Please provide the copy of replies received from DRDO by CVO, MOD in respect of my complaints.
Please provide the copies of your forwarding letter to DRDO in respect of my all complaints.
NEW DELHI: Ten major projects of the Defence Research and Development Organisation (DRDO), including the LCA Tejas aircraft and several key missile programmes, have been delayed due to various reasons, Lok Sabha was informed on Friday.
Giving details of DRDO’s delayed projects, defence minister Arun Jaitley said during Question Hour that “corrective/ remedial” measures are being taken to address the issue of delays.
Besides Light Combat Aircraft, other delayed projects include Naval Light Combat Aircraft, Aero Engine Kaveri, Airborne Early Warning and Control Aircraft and Long Range Surface-to-Air Missile.
The Air-to-Air Missile Astra, Advanced Light Weight Torpedo, Dual Colour Missile Approach Warning System for Fighter Aircraft, among others, have also been delayed, the minister said.
On remedial measures to complete the projects, Jaitley said that consortium approach is being used for design, development and fabrication of critical components.
According to him, synergy and better co-ordination were being promoted among user services, DRDO and production agencies through cluster meetings.
Jaitley also said the general impression that DRDO is lagging behind and that government is not providing enough support “may not be very accurate”.
“It is not fair to say that activities of DRDO have been curtailed by paucity of funds,” he said.
On proposal to allow 49 per cent foreign direct investment in the defence sector, Jaitley said the objective is to bring in best technologies into the country.
The government has decided that now it would be “Indian majority controlled” and it will bring the best technologies in the defence sector, the minister said.
The country has to come out of the situation where India is the largest buyer of defence equipment and ensure that “we have domestic capacity within India”, he noted.
“Government is making all efforts to grant Performance Related Incentive Scheme (PRIS) to DRDO scientists on par with scientists of Department of Atomic Energy (DAE) and Indian Space Research Organisation (ISRO),” Jaitley added.
एफडीआइ सीमा 49 फीसद करने का मकसद सर्वोत्तम तकनीक पाना – जेटली का जवाब :
रक्षा खरीद के पांच मामलों की जांच कर रही सीबीआइ
नई दिल्ली, प्रेट्र : रक्षा खरीद में अनियमितता से जुड़े पांच मामलों की जांच सीबीआइ को सौंपी गई है। रक्षा मंत्री अरुण जेटली ने शुक्रवार को लोकसभा में यह जानकारी दी। उन्होंने बताया कि पिछले तीन वर्षो में केंद्रीय सतर्कता आयोग (सीवीसी) ने नौ मामलों को जांच के लिए सरकार के पास भेजा जिनमें पांच की जांच सीबीआइ से कराई जा रही है। प्रश्नकाल के दौरान पूछे गए एक अन्य सवाल के जवाब में जेटली ने कहा कि पिछले तीन वर्षो में 19 युद्धक विमान और 11 हेलीकॉप्टर दुर्घटनाग्रस्त हो चुके हैं। इन हादसों में 24 जवान मारे गए। रक्षा मंत्री के मुताबिक सबसे ज्यादा नौ युद्धक विमान और चार हेलीकॉप्टर 2011-12 में दुर्घटना के शिकार हुए l
नई दिल्ली, प्रेट्र : रक्षा अनुसंधान एवं विकास संगठन (डीआरडीओ) की दस प्रमुख परियोजनाएं विभिन्न कारणों से लटकी हुई हैं। इनमें हल्का लड़ाकू विमान (एलसीए) तेजस का निर्माण भी शामिल है। रक्षा क्षेत्र में 49 फीसद एफडीआइ का मकसद अपना नियंत्रण बनाए रखते हुए देश में सवरेत्तम तकनीक लाना है। लोकसभा को शुक्रवार को यह जानकारी दी गई। 1डीआरडीओ की तय समय सीमा से पीछे चल रहीं परियोजनाओं का ब्योरा देते हुए रक्षा मंत्री अरुण जेटली ने प्रश्नकाल के दौरान बताया कि परियोजनाओं के पूरा होने में विलंब के मुद्दे के समाधान के लिए सुधारात्मक उपाय किए जा रहे हैं। और जो परियोजनाएं समय से पीछे हैं उनमें नौसेना के लिए हल्का लड़ाकू विमान (एनएलसीए), विमान इंजन कावेरी, बहुत दूरी पर विमान, जहाज या वाहनों का पता लगाकर लड़ाकू विमानों को सूचित करने और उन्हें हमला के लिए निर्देशित करने वाली रडार प्रणाली (एईडब्ल्यूएंडसी) व धरती से लंबी दूरी हवा में मार करने वाली मिसाइल निर्माण शामिल हैं। हवा से हवा में मार करने वाली मिसाइल अस्त्र, कम वजन वाला उन्नत टॉर्पीडो, लड़ाकू विमानों को मिसाइल की चेतावनी देने वाली दोहरे रंग की प्रणाली तैयार करने की परियोजना भी लटकी हुई है। परियोजनाएं पूरी करने के लिए महत्वपूर्ण पुर्जो की डिजाइन तैयार करने और उन्हें विकसित करने के लिए डीआरडीओ और उत्पादक एजेंसियों के काम करने वालों का समूह बनाया जा रहा है। इनके बीच बार-बार बैठकें कराकर बेहतर समन्वय के साथ मिलकर काम करने को बढ़ावा दिया जा रहा है। जेटली ने यह भी कहा कि यह धारणा कि डीआरडीओ इस वजह से पिछड़ रहा है कि सरकार पर्याप्त सहायता नहीं कर रही है, हो सकता है कि बिल्कुल सही नहीं हो। रक्षा क्षेत्र में 49 फीसद प्रत्यक्ष विदेशी निवेश की इजाजत देने के बारे में उन्होंने कहा कि इसका मकसद भारत का नियंत्रण बनाए रखते हुए देश में सर्वोत्तम तकनीक लाना है। भारत दुनिया का सबसे बड़ा रक्षा उत्पाद खरीददार है, देश को इस स्थिति बाहर लाना होगा। डीआरडीओ के किसी विदेशी निजी कंपनी से मिलकर काम करने पर सरकार ने अभी कोई निर्णय नहीं लिया है। उन्होंने कहा कि हाल के वर्षो में डीआरडीओ से इस्तीफा देने वालों की संख्या में कमी आई है। एफडीआइ सीमा 49 फीसद करने का मकसद सर्वोत्तम तकनीक पाना जेटली का जवाब :
माननीयश्री नरेंद्रमोदीजीदिनाक 18 जुलाई 2014प्रधानमंत्रीकक्ष संख्या 152 पीएमओसाउथब्लाकनईदिल्ली -110011
विषय :डीआरडीओ में ताजमहलो का निर्माण – दूसरी क़िस्त
माननीय श्री प्रधानमंत्री जी एक तरफ हम समाचार पत्रो व् टी वी में पड़ते व् देखते है कि
” Modi austerity drive, no new cars for ministers, PMO to monitor spendingby Marya Shakil, CNN-IBN Jun 25, 2014 at 08:57pm IST.
Modi, whose working style had garnered headlines in less than a month of assuming office, has also asked the ministers to take PMO’s approval for any purchases above Rs 1 lakh, according to sources.
वंही दूसरी ओर डीआरडीओ में ताजमहलो का निर्माण बदस्तूर जारी है I इसी सन्दर्भ में करप्शन इन डी आर डी ओ वेबसाइट को एक ईमेल द्वारा आज जानकारी मिली डी आर डी ओ द्वारा कि लॉन्ग व्हीलर आई लैंड में करोड़ों रूपए खर्च करके सिर्फ चार अदद कमरो का एक वी आई पी गेस्ट हाउस का निर्माण कार्य जा रहा है जिसकी खास बात यह है कि उसके हर कमरे का डिजाइन दुबई के एक सात सितारा लक्ज़री होटल के कमरो के अनुरूप किया जा रहा है I
यह निर्माण कार्य 100 मजदूरो द्वारा रात दिन लगातार कार्य जा रहा है और अगले सप्ताह इस गेस्ट हाउस का उद्घाटन होना है I यह सब निर्माण कर्नल सत्पथी के देख रेख में चल रहा है जो की लभग दस वर्षो से वंहा कार्यरत है इसके अलावा एक लक्ज़री बोट भी किंग्स एंड क्वीन कंपनी से खरीदी गयी है I क्या आपको लगता है की किंग्स एंड क्वीन की बोट में बैठ कर जाने से मिसाइल ज्यादा सटीक निशाना लगाएंगी I जंहा एक और सामान्य कर्मचारी सरकारी आवास समस्या से जूझ रहे है काफी लम्बी प्रतीक्षा सूची चल रही है वंही दूसरी ओर इन तथाकथित विज्ञानिको को विलासिता सूझ रही है I
आपसे नम्र निवेदन है कि शीघ्रता पूर्वक इन तथाकित वैज्ञानिको को देश के बहुमूल्य पैसो की बर्बादी से रोके सादगी का सन्देश दे क्योंकि कोई भी रिसर्च के लिए इन सब विलसिताओं की कोई भी आवश्कयता नहीं होती I सर जे सी बोसे ने कोई भी अविष्कार फाइव स्टार होटल में बैठकर नहीं किया था I
ऐसा न हो की आप अपने सांसदों व् मंत्रियो को सादगी का सन्देश देकर देश का लाखो रुपये बचाये और दूसरी ओर ये तथाकित वैज्ञानिक देश का करोड़ो रुपये बर्बाद कर दे I
सलग्न – करप्शन इन डी आर डी ओ वेबसाइट को प्राप्त ईमेल
prabhudoon@gmail.com” <prabhudoon@gmail.com>
date: Fri, Jul 18, 2014 at 6:57 AM
subject: Corruption new inputs
mailed-by: guerrillamail.com
Received: by 10.152.131.193
Prabhu ji, I want to inform S.A. saheb’s latest gift to himself a multi crore guest house with just 4 rooms with 7 star facility at wheeler island. He is going to inaugurate it next week. Each room is modelled as per designs from Dubai luxury hotel and more than 100 labourers are working day and night under Shri.Col. Satpathy who is the permanent Construction c.c.e. for the past ten years at the same sensitive and maney making post at Baleswar and Kolkata for the past 10 years. He has made similar seven star guest house in Kolkata also for his VVIP bosses to please them. A luxury boat(yact) is also being purchased for the Kings and queens of D.R.D.O. in Wheeler Island. Please do something to stop this. Like the fake degree scam, another big chunna to govt is by employees building houses in same station with H.B.A. and still staying in lab quarters by renting their house. Such like artificial scarcity of quarters is created and the waiting list is too long. moreover, taking this artificial shortage into account new quarters are being built by the construction department at exorbitant costs (much higher rates than C.P.W.D.)our department has become more of a construction dept. than R&D. That too contracts are issued only to some big fish contractors close to these corrupt officers without any transparency. When the whole country is following e-mail tendering, our dept. follows selective tendering. These construction engineers have even started taking projects from other than our dept. due to the huge kick backs provided in the over priced contracts. Please please do something otherwise we are going to be doomed. Wellwisher.
In DRDO there is no HR policy, although the post of CC R&D HR and a big HR directorate under him working in DRDO Hqrs but they are working with sole aim and object that how to execute and manage the unethical/ unconstitutional demands of DG, DRDO to all establishment heads.
Generally these demands are to adjust their beloved by any means like Smt. T Chandra Bhanu or Ms Geetha or Ms Swati Srivastva or Ms Dolly Bansal recruitment cases. Some cases come out from the four walls of DRDO but inside DRDO everyone knows this practice is continue carryon in DRDO by so called DRDO,HRD like adjustment of Commander Patel, Ex- SA’s daughter, CEPTAM Chairman’s son, Ex- Scientist ‘G’ in DEAL who was head of HRD, DEAL adjust his son Sh Saket Jain with all farzi certificates.
It is very well proven DRDO HRD can do any dam thing under wish of their AAKAS whether harassment of any individual from class IV employee to Scientist ‘H’. There is no moral exists in DRDO, HRD n numbers of examples available of transfers cases, manipulating in ACR/APAR’s, Awards to incompetents, authentication of false claims, list is too long.
The following case of Sh M R Gupta, TO ‘C’ is a clear cut case of dictatorship of DRDO officials, several years torture now Sh M R Gupta become chronic depression case.
Sh M R Gupta joined as JSA-II in 1979 in GTRE, DRDO, Bangalore, transferred to IRDE, Dehradun and subsequently joined DEAL as SSA in October 1987.
Up to 1986 his ACR’s was very good and enjoyed regular growth, but the day when then Director, IRDE Dr O P Nijhawan raised his eyebrow and put him in hit list, the bad days started and Sh M R Gupta’s service journey till date exposes the DRDO HR policy.
His 1987 ACR reflects the real bossism of Mr O P Nijhawan number dropped to 62
As IETE graduate Sh M R Gupta applied for the post of Assistant executive engineer in I & B through UPSC and got selected but Dr O P Nijhawan not supplied his 1987 ACR so he was deprived to get post.
Dr. O P Nijhawan’s effect also passed to DEAL and it was always made confirm that any advantage should not passed to Sh M R Gupta,
Sh M R Gupta qualified 9 times LDCE examination of Scientist ‘B’, the RTI revealed that RAC maintained the boss wishes. No one imagine the act of RAC officials.
Sh M R Gupta‘s ACR/ APAR of 1995 and 96 was found blank.
The 2004 ACR/APAR was reviewed by Sh Y P Sehgal, Ex Sc ‘G’ illegally as Sh M R Gupta was never worked with him and put adverse remark “ Onedisciplinary case is with DRDO Hqrs” and remark was duly approved by the Director, Sh Ashok Sen and it was not even communicated to Sh M R Gupta.
DRDO having very common scenarios that if one official is in hit list then all chamchas never leave any chance to fix him to make happy the boss.
In case of Sh M R Gupta same thing happened, several attempts were done to harm, Dr. B S Jassal throw his wife’s medical bill for unforeseen reason and exchanged heat argument, in those argument frustrated Sh M R Gupta told him that I will jumped from the building, very next movement the explanation call with initiation of disciplinary action raised against him.
In 2004 Sh Mahakar Singh, Sc ‘G’ also demonstrated the extreme loyalty and one incident he scrimmage with Sh M R Gupta in his office room, next moment the room was sealed and an ION was served and an inquiry was constituted in a hurry and stage was set for dismiss Sh M R Gupta. By grace of God Sh M R Gupta approached local police and case was registered, subsequently after lower court to high court and again to lower court Sh Mahakar Singh rendered his apology in front of Session Judge, Dehradun and matter was closed.
This is not a single case, the HR policy ingest lot of DRDO officials by heart attack, High blood pressure, increasing number of bye passes, inserting stunts, depressions or exodus.
You can rate DRDO HR policy 5 stars, 4 stars, 3 stars, 2 stars or 1 star after going through the following papers.
MR. M R Gupta’s 1987’s ACRMR M R Gupta ACR 1987Amazing score card of LDCE, RAC can anyone believe the DRDO HR policy
Fast act of Sh Ashok Sen if he was right the why Sh Mahakar Singh rendered his apology in court for same incidentThe Sh Ashok Sen’s white washing team Sh.P C Sharma, CAO, Dr.B.S. Jassal, Sc ‘F’, Sh K.Sivakumar, Sc ‘F’, Sf Ajay Malik, Sc ‘E’Sh Mahakar Singh rendered his apology in courtSh Mahakar Singh rendered his apology in court
Health condition of Mr M R Gupta or DRDO HR policy
To, 16th July 2014
Shri Pritam Dutta, IDAS,
ACDA, CPIO,CVO,
O/o PCDA (R&D), West Block-V,
R K PURAM,
NEW DELHI- 110066
Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of audit of service books of DRDO officials. It is observed that several DRDO officials were acquired Diploma/ Degree after joining DRDO from various deemed universities / private institutes/IGNOU via distance education mode etc. and most of the cases the courses are not recognised by APEX body like UGC/AICTE/DEC etc. in RTI replies DRDO also accepted this facts. (Copy enclosed)
Provide the copy of audit reports of service record verification specially the part where the higher qualification was endorsed of Sh Hoshiyar Singh Kalsi, STA-C, Smt. Nisha Teneja, STA-C,Sh Ramesh Kotiyal, STA-B, Smt. Netu Rawat, STA-B, Sh Virendra Singh Negi, STA-B,Sh Saket Jain,STA-B, Sh.Sudhir Kumar, STA-B of DEAL Dehradun.
Provide the certified copies of verifications reports provided by administration of DEAL Dehradun towards above mentioned seven officials of DEAL, Dehradun.
Note : Matter is directly related to corruption and not exempted under Section 24 (1) as a proof the RTI replies and DOP, DRDO letter is enclosed
To, 16th July 2014
Shri Pritam Dutta, IDAS
ACDA, CPIO,CVO
O/o PCDA (R&D), West Block-V
R K PURAM
NEW DELHI- 110066
Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of audit of service books of DRDO officials. It is observed that several DRDO officials were acquired Diploma, Degree after joining DRDO from various deemed universities via distance education mode etc and most of the cases the courses are not recognised by APEX body like AICTE,DEC etc in RTI replies DRDO also accepted this facts. It is also observed that the individuals who received such diploma/ degrees were also received lump sum incentive grants for acquiring higher qualification as per DOPT OM No. 1/2/89-Estt Pay-I dated 9.4.99 but their respective acquired qualifications were not duly verified by DRDO
Provide the certified copies of verification reports provide by DRDO in respect of following individuals.
Acquiredfrom JNTU, Hyderabad
Sh. Siyaram, STA B RCI B Tech Mech 1.6.2010
Shri A Venkateshwara Rao, STA B DRDL, B Tech Mech 1.8.2010
Sh. G Venkatesh STA B DMRL B Tech Civil 7.3.2012
Sh. B Baludu, TO A RCI, B Tech Mech 7.3.2012
Acquiredfrom MAHARSHI DAYANAND UNIVERSITY, ROHTAK
Sh U Maheshwarn, STA C DIPR M Sc,CS 3.9.2009
Sh Deepak Kumar, STA B DESIDOC M Sc,CS 31.3.2010
Smt Laxmi Verma, STA C DESIDOC M Sc,CS 20.09.2011
Sh Puneet Kumar, STA C DESIDOC M Sc,CS 30.09.2011
Sh Mandeep Singh Basra, STA B IRDE M Sc,CS 30.09.2012
Acquiredfrom ANNA UNIVERSITY, CHENNAI
Sh R Anandh, STA B CVRDE BTech E &C E 1.12. 2010
Sh S Purshotham, STA B CVRDE BTech Mech 1.12. 2010
Acquiredfrom ANDHRA UNIVERSITY, Visakhapatnam
Sh Ankam Sreekar, STA B, SFC BTech E&EE 28.2.2011
Sh Ram Prakash Yadava, STA B , SFC BTech Chem 9.2.2011
Sh U Thanigaivelan, STA C , HEMRL BTech Chem 28.2.2011
Sh P V Krushna Rao, STA C NSTL BTech Chem 12.8.2011
Sh M Mahesh, STA C NSTL B.Tech Mech 22.8.2012
Sh K V Ranga Rao, TO C NSTL BTech Chem 8.8.2012
Sh V Venkateshwarlu, STA C, NSTL B.Tech Mech 23.2.2013
Acquiredfrom JRN University, Rajasthan
Sh Rakesh Kumar Soni, STA C BTech Chem 13.7.2012
Sh Shankar K N, STA C LRDE B.Tech Mech 12.1.2013
Sh Amit Chawla, STA B LASTEC B.Tech EC&Ein 16.8.2012
Acquiredfrom Sikkim Manipal University, Gangtok
Smt.Sampaty Senapati, STA ‘C’ ITR M Sc, CS 9.8.2013
Smt Balbir Kaur, TO C RAC M Sc, CS 10.5.2013
Sh Narendra Kumar Thakur, TO C SASE acquired M Sc, CS 24.1.2012
Sh Srinivas Juluru, TO B DRDL M Sc, CS 1.5.2006
Sh Arvind Kumar, STA B INMAS M Sc, 25.9.2012
Note : Matter is directly related to corruption and not exempted under Section 24 (1) as a proof the RTI replies and DOP, DRDO letter is enclosed