Constitutional crises in DRDO

DRDO comes under the Ministry of Defence, Government of India and all central government rules are applicable.

However, beginning with 1980 (prior to this DRDO was running under defence secretary) when D G (R&D) post was created and approved by cabinet with status of secretary as independent charge of R&D, foundation were laid for an autonomous & central govt. body both.

Special status was given for program director of IGMDP with permission sign 10 cr papers while directors/lab heads limitation was 2.5 Lakhs.

In the name of science & technology development, recruitments were made to develop defence specific weapons/equipments/infrastructures. A separate recruitment and assessment centre (RAC) was created with consent of UPSC and with approval of government.

The absolute empowerment of secretary DRDO gave the individual to implement his decision and with passage of time the interest of nation was over shadowed. The secretary DRDO made the entire lab directors independent and unaccountable.

Today the scenario is no system exists in DRDO, every director following their own rules, whether it is case of procurements/ recruitments / assessments / maximum time busy with construction/renovations etc.

They don’t bother new born D.Gs, DOP, RTI cell and even Secretary, DRDO. Why? Because they know after few days, Dr Avinash Chandra will be working in contract basis. No one is listening his order as well as his advice. For example, Director, Dr CP Ramanarayanan, GTRE not honoring the order of Dr Avinash Chandra, the new DG Electronics Communication System Sh. S S Sundaram also supporting the acts and deed of Director, Dr CP Ramanarayanan, GTRE (because of regionalism). Transfer case of Mr Sachin GTRE to DEAL is a clear cut example of environment of DRDO; the words uttered by Dr. CP Ramanarayanan are resonating in the ears of all top DRDO Hqrs officials.

Dr Avinash Chandra told a scientist that your request is genuine but I am helpless. The scientist got transfer order one and half year back but the because of the dictatorship of Director, LRDE, Sh S Ravind the transfer is still pending and our  Dr Avinash Chandra, SA, Dr G Malakondaiah, DS & CC R&D (HR & M), and DOP, Dr A K Singh all are helpless. Although Dr G Malakondaiah talked in front of the individual scientist with Sh S S Sundaram (conversation was in Telegu) but it did not turn positive.

Surprisingly, the aim and objective of Rama Rao committee was that the power is decentralized for fast decision on procurement issues, management issues. This would give boost for high productivity or pace in development program. It is looking like a total failure in the beginning itself.

Instead of all this all new DG are too busy to manage big chunks of funds and showing off the power of their new kingdom.

DRDO labs directors, mostly known as distinguished or outstanding scientists but it is astonishing fact that most them are not known in India because they have never published any outstanding paper, not have any patents, if PhD then from deemed universities where they are suppose to feed project funds. Like their big guru Dr W Selvamurthy Ex C C R&D, who is PhD in Yoga and involved in feeding funds to various deemed universities or private institutions. (Famous SASTRA case everyone knows). Rest are following their footsteps like Sh S S Sundaram, new born DG, Sh RC Agarwal, Director, DEAL (2nd extension age 63+ yrs), Sh R K Agarwal another outstanding scientist now start pursuing PhD from Graphic Era, also new born Deemed University at Dehardun because they fed funds in the name of projects and their agents ex DRDO employees are managing the show.

A constitutional crisis was the appointment of RAC Chairman. Dr PS Goel was appointed for period 3rd December 2008 – 2nd December 2011. As per rule search committee for next RAC chairman was supposed to be constituted in June 2011. However, minutes (DOP/05/50219/M/01 7th Dec 2011 disclose that first meeting of newly constituted committee was scheduled for 19 December 2011, it is astonishing fact that DRDO writes its own constitution and shows disrespect to Honorable Raksha Mantri.

Negligence of then SA to RM, not to initiate search committee in time was a planned action. He wanted to push all his close aides to appropriate place/post, who were handling sub contracts signed with foreign firms with different areas and were responsible omission/commission dues. The period of Dec 2011 to June 2012 was the crucial period of assessment/recommendations/selections/promotions. To cash this opportunity   Dr V K Saraswat as chairman RAC recommended those who were not competent for the post of ‘H’. Had there been an independent RAC Chairman, he would kept the national interest in forefront. The example of the case of Sh R K Agarwal, Scientist ‘H’ at DEAL, DRDO, Dehradun, who prepared citation for promotion with a false claim (Copy of his claim) attached and got promoted with the blessing of Sh R C Agarwal, Director, DEAL (2nd extension without any achievement) and Dr V K Saraswat.

The letter no 12/7/2012 EO(SM-II) dated 19th March 2012 of DOPT revealed that appointment of

as RAC chairman was approved by Appointment Committee of Cabinet (ACC). The question is why it was waited up to June 19th, 2012; time was buying to adjust all incompetent senior officials by Dr V K Saraswat.

It is requested to Sh A K Antony, honorable Raksha Mantri order for investigation of assessment year 2012 scientist ‘H’.

DOPT letter no 12/7/2012 EO(SM-II) dated 19th March 2012
DOPT letter no 12/7/2012 EO(SM-II) dated 19th March 2012

 

Office order of additional charge given to Dr V K Saraswat  as Chairman, RAC
Office order of additional charge given to Dr V K Saraswat as Chairman, RAC
Note sheet of approval of Raksha Mantri for additional charge of Chairman RAC to Dr V K Saraswat
Note sheet of approval of Raksha Mantri for additional charge of Chairman RAC to Dr V K Saraswat
DRDO News Letter September 2012
DRDO News Letter September 2012

 

 

 

First Appeal – Sh R K Agarwal’s False Claim

FIRST APPEAL U/S 19(1) OF Right to Information Act, 2005

To,
Shri Surjan Pal, OS & Director DECS
First Appellate Authority, DRDO
RTI Cell, Room No. 240/B, DRDO Bhawan, Rajaji Marg
New Delhi-110011

             Subject: First Appeal under Section 19(1) of RTI Act 2005

Reference:  No.DEAL/RTI/0010/2013 dated 3rd September 2013

Sir,
As I am aggrieved by decision/no decision of Central Public Information OfficerI hereby file this appeal for your kind decision.

The reply of CPIO, DRDO, is completely confusing, misleading, incorrect, unjustified and willful not give any information, does not following the spirit of RTI Act 2005.

I hereby submit this appeal u/s 19(1) of RTI Act 2005 for your kind consideration & decision.

1.    Details of appellant:-

Name
Prabhu Dayal Dandriyal
Address
21-Sunderwala, Raipur
Dehradun-248008
Mobile
09411114879
email ID
prabhudoon@gmail.com

2.    Details of Central Public Information Officer (CPIO):-

Name & Rank
Dr. Sangeeta Khare , Scientist ‘G ‘
Address
DEAL,Raipur Road, Dehradun-248001

3. Particulars of Decision/Order of CPIO against which appeal:

Decision vide letter No. DEAL/RTI/0010/2013  dated 3rd September 2013. Copy enclosed as  Enclosure -1.

4. Brief facts leading to appeal:-

Sh. R K Agarwal, Scientist ‘H’, (Out Standing Scientist ) Defence Electronics Application Lab, DRDO, Dehradun was promoted wef 1st July 2012.

In DRDO Newsletter September 2012 page No -14. In which the details of Outstanding Scientists of the DRDO.Sh, R K Agarwal, Outstanding Scientist, DEAL   “his main contribution has been the development of NARAD, the first semi-static and transportable terminals developed in the country. These terminals were immediately deployed in SRI LANKA during operation PAWAN where they have played a vital Role.”

Sh. R K Agarwal claimed false that he worked and contributed in “Project NARAD”, which was the only real-time successful project and was appreciated by user (IPKF).

Sh. R K Agarwal claimed the aforementioned for his promotion to outstanding scientist and it was published in DRDO’s News Letter September 2012 page No -14 (Copy enclosed)

Departmental Part Order for manpower for Project NARAD reference are DO Part-I No.232/AD dated 18/11/1988 and DO Part-I No.238/AD, No.239/AD dated 24/11/1988. There was clear cut mention in the order that Sh. R K Agarwal was not part and parcel of Project NARAD.

The appreciation letter No 35795/Aks/per date 20th April 1990 by Major A K Singh, 57 Mtn Div. Signal Regiment to ShSurendra Pal, Dy. Director, Project NARAD clearly reveals the names of DEAL’s scientists who participated and contributed their best  in the real operation scenario. There is no name of Sh. R.K Agarwal in the appreciation letter.

The DRDO in their RTI reply No.DEAL/RTI/0003/2013 dated 08/04/2013 clearly mentioned that No such document/information is available, means there is nothing available which proves that Sh R K Agarwal was part and parcel of Project ‘NARAD’. It is clear evidence that Sh RC Aggarwal supported Sh R K Agarwal’s false claim for promotion to outstanding scientist because of the only reason of nepotism and castism. (Copy enclosed)

5.  Reasons/Grounds for First Appeal:-

  1. RTI request sent to DoPT and DoPT furnished partly information which is also mark as confidential, but after result it was a open document.(Copy Enclosed)
  2. DoPT transferred my RTI request to Ministry of Defence for rest information vide their letter no F.No/29/38/2013-EOSM-II Dated 15th July 2013.
  3. Subsequently  MOD transferred to RTI Cell, DRDO vide Mof D ID No 21/(3)/2013(1083)/ D/(RTI) Dt 5/7/2013
  4. Subsequently  RTI Cell, DRDO transferred to CPIO,RAC, DRDO vide  RTI/01/2091/P/2013/0178 dated 10th July 2013
  5. Subsequently CPIO,RAC, DRDO informed me vide letter no RAC/03/RTI/95/2013 Dated 1st August 2013 that my application sent back to RTI Cell, DRDO for further action. (Copy enclosed)
  6. Unexpectedly I have received 6th September 2013 a letter from CPIO,DEAL, Dehardun stated that they received a letter from CPIO,RAC, DRDO on 20th August 2013 (no letter no reference) stated that the information (Biodata) of Sh R K Agarwal marked as confidential, hence it cannot be disclosed (copy enclosed)
  7. As Sh R K Agarwal worked in DEAL in various projects and “only those project are classified as secret/confidential which have been sanction under staff project (ARMY/Air force/Navy/ Services   Branch, the rest of the project sanctioned to DRDO comes under R&D Projects.

Sh R K Agarwal himself quote in DRDO News Letter (September 2012) that he was associated with Project “NARAD” his claim was totally false and supported by Sh R C Agarwal, Director, DEAL for his promotion to Scientist ‘H’ and this act come under corruption. (“Whoever does anything with the intention of causing wrongful gain to one person or wrongful loss to another is said to do that thing dishonesty”) 

Corruption – Giving or obtaining advantage through means which are illegitimate, immoral, and/or inconsistent with one’s duty or the rights of others. Corruption often results from patronage)

viii. DRDO is protecting Sh R K Agarwal for his false claim and to stop this corrupt practice in DRDO, it is very well require exposing false claims especially in R&D atmosphere because these practices demoralize young scientists. As CPIO, DEAL already committed in one RTI reply no information and document evidence is available in DEAL regarding Sh R K Agarwal’s claim.

6.    Prayer /relief sought for:-

Information sought vide RTI Application dated 28th May 2013 by appellant has been denied on false and invalid reasons by CPIO, DEAL,Dehradun. Therefore, appellant kindly prays to FAA, DRDO to allow this appeal and issue instructions/orders to CPIO,DEAL, Dehradun to provide the information sought as seek by appellant vide his RTI Application dated 28th May 2013 (Copy Enclosed)

7.    Grounds for prayer/relief sought for:-

1.      CIC decisions on notified organisations under Schedule II of  RTI Act 2005 like DRDO

(i)        CIC in its various decisions consistently held that Establishment Matters relating to the organization notified u/s 24 of the RTI Act come within the purview of the Act and information in this regard thereto are not exempted from disclosure.

(ii)       CIC in its various decisions clarified that the exemption u/s 24(1) for DRDO (notified organisation under Schedule II) is only for Scientific/Technical/Strategic/national security information and not for the information of General nature/Estt. Matters/ Routine Correspondence/ all other information for which exemptions u/s 24(1) are not allowed.

(iii)      These decisions of CIC are binding on all notified organisation under Schedule II, as these decisions of CIC has not been challenged till date in any court.

(iv)     In this regard following decisions of CIC are listed for your kind information and consideration.

  1. CIC/LS/A/2012/002612 dated 22.03.2013 (Dr. Neelam Bhalla Vs DRDO)
  2. CIC/LS/A/2009/001073 dated 17.2.2010 (Navin Praksh Gupta Vs DRDO)
  3. CIC/LS/A/2012/002487 dated 31.12.2012 ( Ms. Savitha Vs DRDO)
  4. CIC/LS/A/2010/000107 dated 26.4.2010 (Ms. K. Surya Kumari Vs DRDO)
  5. CIC/SM/C/2008/00054/LS dated 29.01.2010 (Shri Prabhat Vs DRDO)
  6. CIC/LS/A/2010/001277 dated 2.3.2010 (Ram Manohar Singh Vs. DRDO)
  7. CIC/LS/A/2012/002599 & CIC/LS/A/2012/002146 dated 01.11.2012 (Virender Kumar Vs DRDO)
  8. CIC/LS/C/2012/001204 dated 9.8.2012 (Rajiv Chauhan Vs DRDO)
  9. CIC/SM/A/2009/001014/LS dated 09.11.2009 (Navin Prakash Gupta Vs DRDO)
  10. CIC/LS/A/2009/001073 dated 17 Feb 2010 (Navin Prakash Gupta Vs DRDO)
  11. CIC/SM/C/2009/00794, CIC/LS/A/2010/00015, CIC/LS/C/2010/000076 dated 18 June 2010 (Navin Prakash Gupta Vs DRDO)

(v)      In these decisions CIC decided that “Immunity granted u/s 24(1) is only for scientific & strategic Information only“. All other information should be provided by all organisation notified under second schedule of the Act”.

2.      Information sought is related to Estt. Matter/General Routine nature/ Routine correspondence and permissible / allowed by CIC, even after the fact “DRDO is notified organisation under Schedule II”, in various decisions against DRDO.

3.      Misuse & wrong interpretation of section 8(1) (j) by CPIO, DRDO HQ: – It appears that either CPIO did not apply his mind on content of information sought or he is supporting corrupt practices of Director, DEAL, Dehradun

8.    Declaration:-

I hereby state that the information and particulars given above are true to the best of my knowledge and belief.

 
Prabhu Dayal Dandriyal                                                                
21-Sunderwala, Raipur
Dehradun-248008
Landline -0135-2787750, Mobile – 9411114879
Email – prabhudoon@gmail.com Website – www.corruptionindrdo.com  

Appeal No.:FA/PDD/RKA/DRDO HQ/2013/03

Date: 3rd October, 2013                                           

 Enclosure: 

(1)   My RTI Application to CPIO,DoPT, New Delhi dated 28th May 2013
(2)   DoPT reply Dated 15th july 2013
(3)  MoD letter Dated  5 th July 2013
(4)  CPIO, DRDO Hqrs letter Dated 18th July 2013
(5)  CPIO, RAC, letter  dated 1st August 2013
(6)  CPIO, DEAL letter dated 3rd September 2013
 
My RTI Application to CPIO,DoPT, New Delhi dated 28th May 2013
To                                                                                                                28th May 2013
The Under Secretary (RR- II  )
Central Public Information Officer (CPIO)
Department of Personnel and Training
Room No. 268 – B , North Block
New Delhi- 110011
 

Hello,

Kindly provide me with the following information requested under the purview of the Right To Information (RTI) Act, 2005 in respect of Sh. R K Agarwal, Scientist ‘H’, (Out Standing Scientist ) Defence Electronics Application Lab, DRDO, Dehradun

As per SRO- 36 dated 9t May 2011 ( FileNo. DHRDn6205IDRDSlRRlClP/10/1022/D(R&D))

Para 2

“(iv) The Peer Committee as specified in Schedule ID shall assess suitability for appointment of Scientist ‘H’, Outstanding Scientist in Defence Research and Development Service”.

In DRDO Newsletter September 2012 page No -14. In which the details of Outstanding Scientists of the DRDO. Sh, R K Agarwal, Outstanding Scientist, DEAL   “ his main contribution has been the development of NARAD, the first semi-static and transportable terminals developed in the country. These terminals were immediately deployed in SRI LANKA during operation PAWAN where they have played a vital Role.”

Sh. R K Agarwal claimed false that he worked and contributed in “Project NARAD”, which was the only real-time successful project and was appreciated by user (IPKF).

Sh. R K Agarwal claimed the aforementioned for his promotion to outstanding scientist and it was published in DRDO’s News Letter September 2012 page No -14 (Copy enclosed)

Departmental Part Order for manpower for Project NARAD reference are DO Part-I No.232/AD dated 18/11/1988 and DO Part-I No.238/AD, No.239/AD dated 24/11/1988. There was clear cut mention in the order that Sh. R K Agarwal was not part and parcel of Project NARAD.

The appreciation letter No 35795/Aks/per date 20th April 1990 by Major A K Singh, 57 Mtn Div. Signal Regiment to Sh Surendra Pal, Dy. Director, Project NARAD clearly reveals the names of DEAL’s scientists who participated and contributed their best  in the real operation scenario. There is no name of Sh. R.K Agarwal in the appreciation letter.

The DRDO in their RTI reply No.DEAL/RTI/0003/2013 dated 08/04/2013 clearly mentioned that No such document/information is available, means there is nothing available which proves that Sh R K Agarwal was part and parcel of Project ‘NARAD’. It is clear evidence that Sh RC Aggarwal supported Sh R K Agarwal’s false claim for promotion to outstanding scientist because of the only reason of nepotism and castism. (Copy enclosed)

Kindly provide the following informations under the purview of the Right To Information (RTI) Act, 2005

  1. The certified copy of  Sh R K Agarwal’s credentials submitted to then Peer Committee by DRDO for consideration for promotion of Scientist ‘H’ (Outstanding Scientist).
  2. The certified copy Peer Committee recommendation for promotion of Scientist ‘H’ (Outstanding Scientist) in respect of Sh R K Agarwal

Find the application fee for the request attached with this application. If you feel that above requested information does not pertain to your department then please follow the provisions of Section 6(3) of the RTI Act, 2005/Also as per the provisions of the RTI Act, 2005 please provide the details (Name and Designation) of the first appellate authority w.r.t to your department with the reply to the above request., where I may if required file my first appeal.

I do hereby declare that I am a citizen of India. Kindly provide me with the information at the address mentioned with the application. I request you to ensure that the information is provided before the expiry of the 30 day period after you have received the application.

Note: above required information is directly related to corruption and not come under schedule -II

“Whoever does anything with the intention of causing wrongful gain to one person or wrongful loss to another is said to do that thing dishonesty” 

Enclosed- Rs 10 Postal order  98E 528553

Regards,
Prabhu Dayal Dandriyal
21-Sunderwala, Raipur, Dehradun-248008
Phone – 2787750, Mobile- 9411114879,
e-mail id  prabhudoon@gmail.com ,  website- www.corruptionindrdo.com
 
DoPT reply Dated 15th july 2013
dopt reply0001
dopt reply0002
dopt reply0003
 
MoD letter Dated  5 th July 2013
MOD replyrk0002
 
 
CPIO, DRDO Hqrs letter Dated 18th July 2013
reply drdohq
 
 CPIO, RAC, letter  dated 1st August 2013
rac reply
 
CPIO, DEAL letter dated 3rd September 2013
deal reply

Waiting for Credentials of Outstanding Scientist of DRDO

To                                                                                     25th July 2013
The CPIO
Recruitment & Assessment Centre
Lucknow Road, Timarpur
Delhi- 110054

Subject: Transfer of Application AR No 0178 dated 10 July 2013

Sir,

My RTI application to CPIO, DoPT dated 27th May 2013 was transferred to Shri Rajiv Singh, CPIO, & Under Secretary, MoD, South Block vide letter no AB14017/4/2013-Estt (RR)(03074/RTIC/13) dated 28/6/2013. The CPIO, MoD transferred my RTI request to CPIO, DRDO vide letter no Mof D ID No 21(3)2013(1083)/D(RTI) dated 5/7/2013.

Subsequently I have received information of my RTI request point 2 from DoPT vide their letter no F.No.29/38/2013-EO(SM-II) dated 15th July 2013.

The CPIO, DRDO Hq transferred my RTI request vide letter No. RTI/01/2091/P/2013/0178 dated 18th July 2013 to your office for information of point 1 of my RTI request.

As per my previous experiences regarding RTI requests all DRDO establishments 99% replied with their fix quote –

“DRDO is an organisation which is placed in Second Schedule of RTI Act 2005 and is therefore, exempted from disclosures of information under Section 24(1) except information pertaining to the allegations of corruption and human rights violations.”

Therefore, it is requested that the information is pertaining to the allegations of corruption. Sh R K Agarwal’s  promotion case is totally based on corruption & nepotism.

I would like to submit some evidences of nepotism of Sh. R. C. Aggarwal, Director, DEAL, DRDO.

  1. Sh. R. C. Aggarwal after taking charge as Director, DEAL put all scientists/staff of his community in important positions. You can verify with Departmental Part orders.
  2. He supported Sh. R K Agarwal for his false claim of work in “Project NARAD”, which was the only real-time successful project and was appreciated by user (IPKF).
  3. Sh. R K Agarwal claimed the aforementioned for his promotion to outstanding scientist and it was published in DRDO’s News Letter September 2012 page No -14
  4. Departmental Part Order for manpower for Project NARAD reference are DO Part-I No.232/AD dated 18/11/1988 and DO Part-I No.238/AD, No.239/AD dated 24/11/1988. There was clear cut mention in the order that Sh. R K Agarwal was not part and parcel of Project NARAD.
  5. The appreciation letter No 35795/Aks/per date 20th April 1990 by Major A K Singh, 57 Mtn Div. Signal Regiment to Sh Surendra Pal, Dy. Director, Project NARAD clearly reveals the names of DEAL’s scientists who participated and contributed their best  in the real operation scenario. There is no name of Sh. R.K Agarwal in the appreciation letter.
  6. The DRDO in their RTI reply No.DEAL/RTI/0003/2013 dated 08/04/2013 clearly mentioned that No such document/information is available, means there is nothing available which proves that Sh R K Agarwal was part and parcel of Project ‘NARAD’. It is clear evidence that Sh RC Aggarwal supported Sh R K Agarwal’s false claim for promotion to outstanding scientist because of the only reason of nepotism.

Note: above required information is directly related to corruption and not come under schedule -II

“Whoever does anything with the intention of causing wrongful gain to one person or wrongful loss to another is said to do that thing dishonesty” 

Regards,

Prabhu Dayal Dandriyal
21-Sunderwala, Raipur, Dehradun-248008
Phone – 2787750, Mobile- 9411114879,
e-mail id  prabhudoon@gmail.com ,  website- www.corruptionindrdo.com

Copy enclosed

  1. DoPT Letter no AB14017/4/2013-Estt (RR)(03074/RTIC/13) dated 28/6/2013
  2. MoD Letter no Mof D ID No 21(3)2013(1083)/D(RTI) dated 5/7/2013.
  3. DoPT Letter no F.No.29/38/2013-EO(SM-II) dated 15th July 2013.
  4. DRDO Letter No. RTI/01/2091/P/2013/0178 dated 18th July 2013
  1. DRDO’s News Letter September 2012 page No -14

DoPT RTI reply regarding Sh R K Agarwal, Sc H, DEAL, DRDO, Dehradun

My RTI request to DoPT

To                                                                                                             27th  May 2013
The Under Secretary (RR- II  )
Central Public Information Officer (CPIO)
Department of Personnel and Training
Room No. 268 – B , North Block
New Delhi- 110011

Hello,

Kindly provide me with the following information requested under the purview of the Right To Information (RTI) Act, 2005 in respect of Sh. R K Agarwal, Scientist ‘H’, (Out Standing Scientist ) Defence Electronics Application Lab, DRDO, Dehradun

As per SRO- 36 dated 9t May 2011 ( FileNo. DHRDn6205IDRDSlRRlClP/10/1022/D(R&D))

Para 2

“(iv) The Peer Committee as specified in Schedule ID shall assess suitability for appointment of Scientist ‘H’, Outstanding Scientist in Defence Research and Development Service”.

In DRDO Newsletter September 2012 page No -14. In which the details of Outstanding Scientists of the DRDO. Sh, R K Agarwal, Outstanding Scientist, DEAL   “ his main contribution has been the development of , the first semi-static and transportable terminals developed in the country. These terminals were immediately deployed in SRI LANKA during operation PAWAN where they have played a vital Role.”

Sh. R K Agarwal claimed false that he worked and contributed in “Project NARAD”, which was the only real-time successful project and was appreciated by user (IPKF).

Sh. R K Agarwal claimed the aforementioned for his promotion to outstanding scientist and it was published in DRDO’s News Letter September 2012 page No -14 (Copy enclosed)

Departmental Part Order for manpower for Project NARAD reference are DO Part-I No.232/AD dated 18/11/1988 and DO Part-I No.238/AD, No.239/AD dated 24/11/1988. There was clear cut mention in the order that Sh. R K Agarwal was not part and parcel of Project NARAD.

The appreciation letter No 35795/Aks/per date 20th April 1990 by Major A K Singh, 57 Mtn Div. Signal Regiment to Sh Surendra Pal, Dy. Director, Project NARAD clearly reveals the names of DEAL’s scientists who participated and contributed their best  in the real operation scenario. There is no name of Sh. R.K Agarwal in the appreciation letter.

The DRDO in their RTI reply No.DEAL/RTI/0003/2013 dated 08/04/2013 clearly mentioned that No such document/information is available, means there is nothing available which proves that Sh R K Agarwal was part and parcel of Project ‘NARAD’. It is clear evidence that Sh RC Aggarwal supported Sh R K Agarwal’s false claim for promotion to outstanding scientist because of the only reason of nepotism and castism. (Copy enclosed)

Kindly provide the following informations under the purview of the Right To Information (RTI) Act, 2005

1.    The certified copy of  Sh R K Agarwal’s credentials submitted to then Peer Committee by DRDO for consideration for promotion of Scientist ‘H’ (Outstanding Scientist).

2.    The certified copy Peer Committee recommendation for promotion of Scientist ‘H’ (Outstanding Scientist) in respect of Sh R K Agarwal

RTI reply

dopt reply0001

 

dopt reply0002

 

dopt reply0003

Reflections of our time

After 1942 it become clear that India will become independent and the national leaders started carving various developmental plans and knowing fully well that the day British goes the kitty will be empty.

However, Tata, Birla and many financially sound business tycoons came forward to rebuild India. Tata institute of Sciences, BITS Pilani, Visvesvaraya Technological University, etc. were to execute the task in land.

In 1948, though it was minor war we used equipment/arm ammunitions left out by British and fortunately both the parties across the border used the same equipment and arms ammunitions.

In 1962 we were an infant but had to fight the Chinese war in which we imported some equipment and arms ammunitions.

Successively in 1965 & 1971 once again we depended upon imported Russian equipment and some equipment given to India on goodwill.

In 1999, Kargil we were 52 years old with scientific and technological achievements on papers with lot of rewards awards like Scientist of the year, young scientist, PATH BREAKING RESEARCH AND OUTSTANDING TECHNOLOGY, AGNI AWARD FOR EXCELLENCE IN SELF-RELIANCE, DEFENCE TECHNOLOGY SPIN-OFF AWARD, BEST INNOVATION/FUTURISTIC DEVELOPMENT AWARD, Silicon Trophy, TITANIUM TROPHY and the list is very long.

We fought the war with imported arms & equipment. The statement of former Army chief V P Malik, who led the army during the 1999 Kargil war, has said “casualties in the conflict could have been reduced had DRDO not come in the way” in the acquisition of weapon-locating radar. “Delivery delayed is delivery denied,” said Defence Minister A.K. Antony.

The best part is that in Kargil war both parties imported same communications equipment from same suppliers of same country and history was repeated. Because of the terrain condition across the border same problems were faced by both the armies and suppliers sent engineers to rectify the problem.

Interestingly, the scientific achievement after 52 years of independence was the same.

In the Government of India, almost all the ministries have spent thousands and thousands of crores and achieved frontline technology but compared to defence R&D is far behind.

Why?

When DRDO used to have one CC R&D it delivered some output. After special powers were granted to project directors the incompetency took the fore front with the blessing of the recruiters that “position makes a man.” With this principle incompetent over powered. The bluffers became achievers.

Congrats to Dr. W. Selvamurthy one such achiever of DRDO, for assuming charge as President of Amity University, Noida.

Dr W.Selvamurthy, as CC R&D, visited DEAL, DRDO, Dehradun in a function when all the past directors were invited for felicitation. Dr E Bhagirath Rao, Sh V P Sandlas, Sh Ashok Sen were present in the function. Ex CC R&D Sh V P Sandlas then was Director General at Amity University and Dr W.Selvamurthy in his address said “the so called Director General of Amity University Sh V P sandlas” with his crooked famous smile on his face.

Amity University is same and today same Dr W.Selvamurthy has joined Amity University without obtaining the mandatory NOC from government of India (copy of RTI reply from DRDO enclosed)

But I must congratulate him that so far he has distributed crores and crores of rupees to his beloved south bound private universities via Life science board of DRDO, as per DRDO culture now he will access his past office and be able to manage funds for Amity University.

So almost private institutions are having same practice to oblige those who had helped them to provide funds (poor tax payers’ money) in the name of projects and individuals are getting interests or kickbacks by mutual understanding.

Only GOD knows when the government of India, GOM, Defence Standing Committee will realize this out flow of precious money. Since there is no accountability, these senior scientists and technocrats are fooling the nation and helping and nurturing the incompetency in the field of science and technology. This growing incompetency is a major obstacle of our self-reliance.

rti replyselva1

Uttarakhand Disaster – DRDO

Prime minister assures all help to flood-hit Uttarakhand

June 19, 2013 New Delhi:

Uttarakhand Disaster1

Prime Minister Manmohan Singh on Tuesday directed all central government agencies to assist in rescue and relief operations in flood-affected Uttarakhand and assured Chief Minister Vijay Bahuguna of all help, a statement said.

The whole nation came forward to help Uttarkhand with all their resources. ARMY, Air Force, Para military everyone mobilize their resources for rescue operation.

Uttarakhand is privileged that four DRDO establishments are situated in Dehradun, Mussoorie and Haldwani.

But it is very unfortunate that there is no sign of helping hand coming forward in this mission from DRDO. DEAL, DRDO, Dehradun is a premier communication organization which has expert scientists/ technical staff with enough latest equipment of communication. DEAL has the capability to give communication in any harsh condition. DEAL already provides communication in Antarctica missions and other strategic locations and also having expertise to give communication in mountainous terrain with NVIS mode of communications.

Earlier when earthquakes hit Uttarakhand, the DEAL team came forward to help local authorities at severely affected areas with their communication equipment.

What happened this time? DRDO scientists are only bothered about their promotions or extensions. For instance, Director DEAL was totally away all this period to manage his next service extension after the age of 62 years.

Only our new Scientific Adviser and GOD knows his ability, Sh Avinash Chander will be answerable after two years about what (workable SDR) nation will get from Sh R C Agarwal, Director, DEAL, Dehradun

God bless DRDO

DRDO Outstanding Scientist

To                                                                                                                28th May 2013
The Under Secretary (RR- II  )
Central Public Information Officer (CPIO)
Department of Personnel and Training
Room No. 268 – B , North Block
New Delhi- 110011

Hello,

Kindly provide me with the following information requested under the purview of the Right To Information (RTI) Act, 2005 in respect of Sh. R K Agarwal, Scientist ‘H’, (Out Standing Scientist ) Defence Electronics Application Lab, DRDO, Dehradun

As per SRO- 36 dated 9t May 2011 ( FileNo. DHRDn6205IDRDSlRRlClP/10/1022/D(R&D))

Para 2

“(iv) The Peer Committee as specified in Schedule ID shall assess suitability for appointment of Scientist ‘H’, Outstanding Scientist in Defence Research and Development Service”.

In DRDO Newsletter September 2012 page No -14. In which the details of Outstanding Scientists of the DRDO. Sh, R K Agarwal, Outstanding Scientist, DEAL   “ his main contribution has been the development of NARAD, the first semi-static and transportable terminals developed in the country. These terminals were immediately deployed in SRI LANKA during operation PAWAN where they have played a vital Role.”

Sh. R K Agarwal claimed false that he worked and contributed in “Project NARAD”, which was the only real-time successful project and was appreciated by user (IPKF).

Sh. R K Agarwal claimed the aforementioned for his promotion to outstanding scientist and it was published in DRDO’s News Letter September 2012 page No -14 (Copy enclosed)

Departmental Part Order for manpower for Project NARAD reference are DO Part-I No.232/AD dated 18/11/1988 and DO Part-I No.238/AD, No.239/AD dated 24/11/1988. There was clear cut mention in the order that Sh. R K Agarwal was not part and parcel of Project NARAD.

The appreciation letter No 35795/Aks/per date 20th April 1990 by Major A K Singh, 57 Mtn Div. Signal Regiment to Sh Surendra Pal, Dy. Director, Project NARAD clearly reveals the names of DEAL’s scientists who participated and contributed their best  in the real operation scenario. There is no name of Sh. R.K Agarwal in the appreciation letter.

The DRDO in their RTI reply No.DEAL/RTI/0003/2013 dated 08/04/2013 clearly mentioned that No such document/information is available, means there is nothing available which proves that Sh R K Agarwal was part and parcel of Project ‘NARAD’. It is clear evidence that Sh RC Aggarwal supported Sh R K Agarwal’s false claim for promotion to outstanding scientist because of the only reason of nepotism and castism. (Copy enclosed)

Kindly provide the following informations under the purview of the Right To Information (RTI) Act, 2005

  1. The certified copy of  Sh R K Agarwal’s credentials submitted to then Peer Committee by DRDO for consideration for promotion of Scientist ‘H’ (Outstanding Scientist).
  2. The certified copy Peer Committee recommendation for promotion of Scientist ‘H’ (Outstanding Scientist) in respect of Sh R K Agarwal

Find the application fee for the request attached with this application. If you feel that above requested information does not pertain to your department then please follow the provisions of Section 6(3) of the RTI Act, 2005/Also as per the provisions of the RTI Act, 2005 please provide the details (Name and Designation) of the first appellate authority w.r.t to your department with the reply to the above request., where I may if required file my first appeal.

I do hereby declare that I am a citizen of India. Kindly provide me with the information at the address mentioned with the application. I request you to ensure that the information is provided before the expiry of the 30 day period after you have received the application.

Note: above required information is directly related to corruption and not come under schedule -II

“Whoever does anything with the intention of causing wrongful gain to one person or wrongful loss to another is said to do that thing dishonesty” 

Enclosed- Rs 10 Postal order  98E 528553

Regards,

Prabhu Dayal Dandriyal
21-Sunderwala, Raipur, Dehradun-248008
Phone – 2787750, Mobile- 9411114879,
e-mail id  prabhudoon@gmail.com ,  website- www.corruptionindrdo.com

One of the Strong Reasons of the Exodus in DRDO

To                                                                                                                     2nd  May 2013
The Defence Minister
Room No -104, South Block
New Delhi – 110011

Subject: One of the Strong Reasons of the Exodus in DRDO 

Honorable Sir,

As you already very well aware that DRDO is in neck deep nepotism and corruption and we all welcome your latest decisions like suspension of Dr. Arun Kumar, not giving nod for further extension to Dr. V. K. Sarswat, order for special audit to CGDA, etc.

Sir, your commitment for honesty and stride for eradication of corruption and nepotism specially in defence sector, we salute your honest efforts and we are trying to contribute some authentic information related to nepotism and corruptions prevailing in DRDO from time to time to strengthen your  mission.

In this series I would like to submit some documentary evidences of nepotism of Sh. R. C. Aggarwal, Director, DEAL, DRDO.

  1. Sh. R. C. Aggarwal after taking charge as Director, DEAL put all scientists/staff of his community in important positions. You can verify with Departmental Part orders.
  2. He supported Sh. R K Agarwal for his false claim of work in “Project NARAD”, which was the only real-time successful project and was appreciated by user (IPKF).
  3. Sh. R K Agarwal claimed the aforementioned for his promotion to outstanding scientist and it was published in DRDO’s News Letter September 2012 page No -14 (Copy enclosed)
  4. Departmental Part Order for manpower for Project NARAD reference are DO Part-I No.232/AD dated 18/11/1988 and DO Part-I No.238/AD, No.239/AD dated 24/11/1988. There was clear cut mention in the order that Sh. R K Agarwal was not part and parcel of Project NARAD.
  5. The appreciation letter No 35795/Aks/per date 20th April 1990 by Major A K Singh, 57 Mtn Div. Signal Regiment to Sh Surendra Pal, Dy. Director, Project NARAD clearly reveals the names of DEAL’s scientists who participated and contributed their best  in the real operation scenario. There is no name of Sh. R.K Agarwal in the appreciation letter.
  6. The DRDO in their RTI reply No.DEAL/RTI/0003/2013 dated 08/04/2013 clearly mentioned that No such document/information is available, means there is nothing available which proves that Sh R K Agarwal was part and parcel of Project ‘NARAD’. It is clear evidence that Sh RC Aggarwal supported Sh R K Agarwal’s false claim for promotion to outstanding scientist because of the only reason of nepotism. (Copy enclosed)
  7. Sh R.K.Agarwal already created an embarrassing situation for you due to his personal bias towards Schedule Cast when he deliberately cut the APAR numbers of a Technical Officer ‘C’. The victim has already represented this to Director, DEAL on 11th April 2013. But the best part is that DEAL management threatened and focused all their lethal weapons to fix him. And soon you will get this matter from SC/ST committee.

Sir, this nepotism and corruption is in the peak and this is also a right time for you to select a dynamic personality who can first tackle this neck deep nepotism and corruption of DRDO.

Sir, you are giving answering regarding exodus of DRDO scientists to our honorable parliamentarian since last 7-8 years and quoting that the senior scientists E, F, G are not quitting. But you are not aware that by seeing this honoring of incompetent scientists due to nepotism the junior scientists imagine their future and quit for better future.

Second major point is the senior scientists who were/are super seeded by these incompetent scientists are suffering from, blood pressure, heart problems and depressions. Ask health report of senior scientists.

Sir, can we expect any miracle research from these bunch of halfhearted and blood pressure, heart problems and depressions patients? Not at all.

Sir, you can find some scientist ‘G’ age of 38/40/42 etc. but they achieved this due nepotism if it is not true than how many get international recognition of their research work.

Once again it is requested to see this personally in the interest of DRDO as well as in the interest of nation.

Prabhu Dandriyal
21-Sunderwala, Raipur, Dehradun-248001
prabhudoon@gmail.com
www.corruptionindrdo.com

Always strongly standing to fight against corruption, nepotism, castism and favoritism prevailing in DRDO

DRDO News Letter September 2012
DRDO News Letter September 2012

 

To                                                                                          25th February 2013
The CPIO                                                   RTI/DESIDOC/RKA/25/2/2013
Defence Scientific Information & Documentation Centre (DESIDOC)
Metcalfe House
New Delhi – 110054

 

Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of DRDO Newsletter September 2012 page No -14. In which the details of Outstanding Scientists of the DRDO. Sh, R K Agarwal, Outstanding Scientist, DEAL   “ his main contribution has been the development of NARAD, the first semi-static and transportable terminals developed in the country. These terminals were immediately deployed in SRI LANKA during operation PAWAN where they have played a vital Role.”

  1. The certified copy of his claim for working or association with Project NARAD.
  2. Number of temporary duty if done by Sh R K. Agarwal in connection with Project Narad including deputation to SRI LANKA or any place in India during operation PAWAN.
  3. Provide the copy of DO Part –I published reflecting that Sh R K Agarwal was deputed or associated with Project NARAD, in DEAL, Dehradun
  4. Copy of appreciation letter regarding providing communication during Operation Pawan to IPKF by GOC, IPKF and then S O –in- C.
  5. Number of technical papers published as first author on design aspects of SATCOM systems by Sh R K Agarwal in various publications? Provide the name of Journals /year/page no of publications and issues/ volume numbers.
  6. On  “Throughput Acceleration Satellite Adaptation Unit (SAU)”  and the role and contribution of Sh R K Agarwal  in its patent filing. –

Find the application fee for the request attached with this application. If you feel that above requested information does not pertain to your department then please follow the provisions of Section 6(3) of the RTI Act, 2005/Also as per the provisions of the RTI Act, 2005 please provide the details (Name and Designation) of the first appellate authority w.r.t to your department with the reply to the above request., where I may if required file my first appeal.
I do hereby declare that I am a citizen of India. Kindly provide me with the information at the address mentioned with the application. I request you to ensure that the information is provided before the expiry of the 30 day period after you have received the application.

Note: above required information is directly related to corruption and not come under schedule -II

Whoever does anything with the intention of causing wrongful gain to one person or wrongful loss to another is said to do that thing dishonesty”  

Enclosed- Rs 10 Postal order 98E 528550

Regards,

Prabhu Dayal Dandriyal
21-Sunderwala, Raipur, Dehradun-248008
Phone – 2787750, Mobile- 9411114879,
e-mail id  prabhudoon@gmail.com,  website- www.corruptionindrdo.com
rkgrtireplydeal
 
 

Happy Holi, Holi Mubark

To                                                               27th March 2013
The Defence Minister
Room No -104, South Block
New Delhi – 110011

Happy Holi, Holi Mubark to honorable Raksha Mantri Ji,

Happy Holi, Holi Mubark to each and every true Indian who thinks for the country and dreams of self-reliance, secure, healthy and honest India including our defence sector.

In the Holika Dhahan occasion we congratulate and support our honest Defence Minister Sh A.K. Antony for starting swaha of corrupt officials in our defence sector. We are also thankful to him for taking such exemplary action (suspension just half an hour before his retirement after enjoying extension in service for two years) against Dr. Arun Kumar, Ex-DOP, DRDO.

Sir, there are so many other corrupt DRDO senior officials who deserve the same action from your side. These officers exploit DRDO by inducting incompetent family members in different levels, involving procurement businesses as the name of ex- air chief name is accused. If DRDO is investigated, you will find that SPIC, ASL, DRDL, HEMRL, GTRE, TBRL and lots of other DRDO labs are busy in the same manner. We have already shared some information with IB, CBI and other agencies. The family members, relatives and friends of these corrupt DRDO officials are enjoying shares of DRDO funds.

There are many more secrets of incompetent DRDO officers mishandling constitutional valid rules for their wasted interest.

RAC of DRDO established to accelerate the recruitment process of potential scientists. However, unfortunately RAC is losing its utility and working as it is now a tool for corrupt senior DRDO officials to encourage corrupt and incompetent stuff in DRDO and it is also being used for demoralizing the honest and real R&D scientists. The increasing representations and court cases are the live examples of these acts.  We think that by now, you are also fed up by answering a lot of honorable parliament members, who are regularly asking the exodus of DRDO scientists.

Recently, as per sources, in one court case, a scientist accused that the thenRACChairman Dr. P.S. Goel unconstitutionally cleared screening committee’s list. The claim is that the list was not signed by the members. It is not surprising because Dr. P.S. Goel has already violated Article 309 by issuing a letter for modifying the SRO on his own without approval of cabinet vide letter no.RAC/01/Assessment/PSG dated 27, March 2011. This was blindly done to give benefits to some incompetent DRDO officials out of way; in return, Dr. P.S. Goel got DRDO chair which costs nearly Rs. 83 lakhs per year on the poor tax payer.

Dr. R.C. Aggarwal, Director DEAL, DRDO gave unceremonious favor to another Agarwal, a scientist of his lab for the post, outstanding scientist. This outstanding scientist had been claimed that “his main contribution has been the development of NARAD, the first semi-static and transportable terminals developed in the country. These terminals were immediately deployed in SRI LANKA during operation PAWAN where they have played a vital Role.”  We are waiting for RTI reply on this subject from DRDO, but we know personally this claim is totally false and used to make him an outstanding scientist.

Another great job was done by DRDO when DRDO ignored your power delegation orders No 36(3)/ 2009-D(O&M), Govt. of India, Min of Def, dated 1 June 2009 and No 36(3)/2012-D(O&M), Govt. of India, Min of Def, dated 5 Nov 2012. . DRDO took approval to suspension/dismissal of honest officials from RRM and in this respect they also filed affidavit in the honorable courts that they got approval from RRM on the subject matter.

Sir this is the tip of the iceberg and the main reason of the exodus, court cases and unproductiveness of DRDO.

Sir, in the DRDO scenario a lot of evil things are waiting for your Holika Dhahan like

  1. Arun Kumar’s daughter’s illegal appointment.
  2. Selwamurthy’s daughter’s illegal appointment.
  3. T.Chandrabanu’s illegal appointment
  4. Prof S K Salwan’s , illegally given DRDO chair (ignored the age limit)
  5. Vasudev’s illegal stay and involvement in SPIC (the IB already reported his daughter’s involvement)
  6. Dr Prahlada ’s VC, DIAT appointment  (ignored his all corrupt activities including remark for SC candidate)
  7. DLRL security surveillance procurement which was submitted with evidences to you only an eyewash inquiry was done by DRDO officials)
  8. Appointment of Sh Dharmendra Kumar, Scientist ‘B’ helped by Dr Arun Kumar, He was MSc,(2001)  at the time of joining in DRDO as STA (2003)

List is too long and the paper will fall short but we are assured that you will surely swaha some corrupt officials in this holy holi festival.

www.corruptionindrdo.com

Always strongly standing to fight against corruption, nepotism, castism, favoritism prevailing in DRDO

 

 

 

RTI – DESIDOC

To                                                                                          25th February 2013
The CPIO                                                   RTI/DESIDOC/RKA/25/2/2013
Defence Scientific Information & Documentation Centre (DESIDOC)
Metcalfe House
New Delhi – 110054

 

Hello,
Kindly provide me with the following information requested under the purview of the Right to Information Act, 2005 in respect of DRDO Newsletter September 2012 page No -14. In which the details of Outstanding Scientists of the DRDO. Sh, R K Agarwal, Outstanding Scientist, DEAL   “ his main contribution has been the development of NARAD, the first semi-static and transportable terminals developed in the country. These terminals were immediately deployed in SRI LANKA during operation PAWAN where they have played a vital Role.”

  1. The certified copy of his claim for working or association with Project NARAD.
  2. Number of temporary duty if done by Sh R K. Agarwal in connection with Project Narad including deputation to SRI LANKA or any place in India during operation PAWAN.
  3. Provide the copy of DO Part –I published reflecting that Sh R K Agarwal was deputed or associated with Project NARAD, in DEAL, Dehradun
  4. Copy of appreciation letter regarding providing communication during Operation Pawan to IPKF by GOC, IPKF and then S O –in- C.
  5. Number of technical papers published as first author on design aspects of SATCOM systems by Sh R K Agarwal in various publications? Provide the name of Journals /year/page no of publications and issues/ volume numbers.
  6. On  “Throughput Acceleration Satellite Adaptation Unit (SAU)”  and the role and contribution of Sh R K Agarwal  in its patent filing. –

Find the application fee for the request attached with this application. If you feel that above requested information does not pertain to your department then please follow the provisions of Section 6(3) of the RTI Act, 2005/Also as per the provisions of the RTI Act, 2005 please provide the details (Name and Designation) of the first appellate authority w.r.t to your department with the reply to the above request., where I may if required file my first appeal.
I do hereby declare that I am a citizen of India. Kindly provide me with the information at the address mentioned with the application. I request you to ensure that the information is provided before the expiry of the 30 day period after you have received the application.

Note: above required information is directly related to corruption and not come under schedule -II

Whoever does anything with the intention of causing wrongful gain to one person or wrongful loss to another is said to do that thing dishonesty”  

Enclosed- Rs 10 Postal order 98E 528550

Regards,

Prabhu Dayal Dandriyal
21-Sunderwala, Raipur, Dehradun-248008
Phone – 2787750, Mobile- 9411114879,
e-mail id  prabhudoon@gmail.com,  website- www.corruptionindrdo.com
 
http://drdo.gov.in/drdo/English/index.jsp?pg=rightlinks_archives.jsp
 
DRDO News Letter September 2012