Tag Archives: Dr A.K Tyagi

FCC BUSINESS IN DRDO: CORRUPTION IN R&D OF BPJ AT DMSRDE, KANPUR

To,                                                                                                                                  4th August 2017

Hon’ble Shri ArunJaitely

RakshaMantri, Bharat Sarkar

RakshaMantralaya,

South Block,

New Delhi-110011

Subject: FCC Business in DRDO- Corruption in DMSRDE, Kanpur by Dr. Rajesh Kumar Tiwari, Scientist ‘F’

Sir,

As you aware there are several questions raised by honorable members of Parliament regarding corrupt practice complaints against DRDO Directors and senior scientist but unfortunately DRDO “pull the wool over MoD eyes” in the name of constitution Fact Finding Committees for such complaints. The fact is the committees chairman and members are always their yes man/chamchas. The reports generated after consuming months and months and as per designed by DG and his loyal coterie. CVO, MoD only busy with correspondences for several years in each case.

Sir, you just call a sample case from CVO, MoD on your table, will expose the modus operendi of these great manipulator scientists of DRDO. Whether case of R&D E, Ex Director Dr Guruprasad, Ex Director DMSRDE, Dr A K Saxena, Dr A K Tyagi, Scietist ‘G’, Ex C C &D, Dr Selvamurty and so many case are pending in the desk of CVO, MoD waiting for fake reports of FFIC’s and clarifications of show cause notices replies of DRDO.

Corruption and adoption of corrupt practices in routine office activities is inherent property of DMSRDE, Kanpur. Even after dozens of complaints on corruption to CVC and its slow motion action on these complaints, Hon’ble High Court Delhi Order in PIL WP(C) No. 3610/2015 dated 17 Dec 2015 and Show Cause Notices to more than 30 Scientists and officers of DMSRDE, Kanpur and approval of Charge Sheet under Major Penalty to Ex- Director Dr. Arvind Kumar Saxena there is no fear in some daring Scientists of DMSRDE and once again Corruption started in DMSRDE, Kanpur.

The recent case is of Complaint dated 21 October 2016 by Shri K.K. Sharmaagainst Dr. Rajesh Kumar Tiwari, Scientist ‘F’. As usual on receiving of complaint DRDO HQ constituted Fact Finding Committee (FCC) – Chairman Shri R.K. Sharma, Scientist ‘G’ , DPA, DRDO HQ.

The case relates to complaint dated 21 October 2016 sent by Shri K.K. Sharma, DMSRDE, Kanpur to Hon’ble RakshaMantri alleging corruption in procurement of material by using fake addresses of firms by Dr. R.K. Tiwari, Scientist ‘F’, DMSRDE, Kanpur in development of Bullet Proof Jacket (BPJ) GSQR 1318.

A File No. DVS/02/2039/P/22 was initiated in the matter and a revised report in accordance with Note No. 19 dated 09 March 2017 was seek by Director General (NS &M) and letter  was sent to Dr. N. Eswara Prasad, Director, DMSRDE on 21.03.2017 from Office of DG(NS&M).  He was asked to submit the revised report by 23 June 2017 vide DG(NS&M) letter No. DVS/02/2039/P/22 dated 19 June 2017.

As a matter of fact Dr. Rajesh Kumar Tiwari, Scientist ‘F’ was Head of Composite Material Division and Project Head of Body Armour : Bullet Proof Jacket (BPJ) -GSQR 1318. He was removed from Head, Composite Division  and Shri A.S. Parihar , Scientist ‘E’ was made Project Head & Head of Composite Division by Director, DMSRDE under huge pressure of DRDO HQ. It is relevant to mention here that Show Cause notice has been issued to Shri A. S. Parihar , Scientist ‘E’ in Corruption matter of Dr. A.K. Saxena complaints and his promotion was also withheld by DRDO HQ for several months.

Dr. Rajesh Kumar Tiwari, Scientist ‘F’ is still posted at DMSRDE, Kanpur and no action has been taken against him. He is having blessings of Dr. N. Eswara Prasad, Director, DMSRDE and enjoying at DMSRDE, Kanpur. DRDO HQ is trying to wash out the matter by its FCC business ( means submit fake FCC report and protect the corrupt) and adopting delay tactics in this complaint.

Sir, your Government is having policy of “zero tolerance” on corruption then why not any disciplinary action has been initiated since last 09 months of filing the complaint? I kindly request you to take urgent action in the matter and issue orders to immediate transfer/posting of  Dr. Rajesh Kumar Tiwari, Scientist ‘F’ out of DMSRDE as he is affecting the inquiry and influencing the case due to his contacts at DMSRDE. It is relevant to mention here that Dr. Rajesh Kumar Tiwari, Scientist ‘F’ is posted at DMSRDE since the year 1990.

 

Regards

Prabhu Dandriyal

21- Sunderwala, Raipur

Dehradun – 248008

Mobile -9411114879

Email id prabhudoon@gmail.com, ww.corruptionindrdo.com

Enclosures:

  1. Hon’ble High Court Delhi relevant portion of Order in PIL WP(C) No. 3610/2015 dated 17 Dec 2015.
  2. Vigilance Clarence to Dr. A.K. Saxena dated 31 July 2015
  3. Letter DVS/02/2039/P/22 dated 19 June 2017 from Office of Director General ( NS &M), DRDO Bhawan, New Delhi.
  4. Relevant portion (page 19-20) of noting approved by DG(NS&M) dated 21.03.2017

SUBMISSION OF THE FACTS OF COLLUSIN OF THE DOP, DRDO HQRS Dr. A.K. SINGH WITH THE ILLEGALLY APPOINTED RELATIVE SCIENTIST OF THE DRDO etc.

To                                                                                                               12th April 2015                 Hon’ble Shri Manohar Parrikar,                                                                                                     Defence Minister,Room No -104,                                                                                                   South Block,New Delhi-110011

SUBJECT:-  SUBMISSION OF THE FACTS OF COLLUSION OF THE                                         DOP, DRDO HQRS Dr. A.K. SINGH WITH THE ILLEGALLY                               APPOINTED RELATIVE SCIENTIST OF THE DRDO   etc.

Sir,

  1. DOP, Dr. A.K. Singh did not take timely action on the letters of cvc and cvo of mod on the illegal Appointments of blood relatives of senior scientist of DRDO as scientists namely SMT. T chandrabanu, Ms Swati Sriwastava, Ms Dolly Bansal & SMT. S Geetha to illegally retain them for the period as much as possible. He did not carry out his duty meticulously against illegal appointment of SMT. S Geetha to please his ex-boss Dr.W. Selvamurthy.
  2. He did not take the following actions as expected from him in the capacity of DOP to know the truth of the experience certificate, got issued from Dr.Ambedkar centre for Bio-Medical research of Delhi university (ACBR of DU) by SMT. S Geetha D/O Dr.W. Selvamurthy Ex- CC R&D, HR
  • Has not called for any explanation as yet from SMT. S. Geetha to tell the organization  about the name of the projects & names & designations of the principal investigators of the projects of the ACBR of DU in which she worked during November 1999 to January 2000 and for the same she was issued a experience certificate.
  • Has not called for any explanation as yet from SMT. S. Geetha about the date on which SMT. S. Geetha applied for the post of temporary research assistant in ACBR of DU in 1999.
  • Has not called for any explanation as yet from SMT. S. Geetha about the procedure and mode of selection to the post of temporary research assistant in ACBR of DU in 1999
  • Did not produce the original copy of the experienced issued to SMT. S Geetha by officiating Director Dr.Veena Brahamchari of ACBR of DU to the high power committee of Shri Bhujanga Rao & Shri Anup Malhotra set up on the orders of defence minister in  which DOP was himself a member.
  • Did not call for any explanation as yet from SMT. S. Geetha, SC-D of DIPAS, Delhi to know all the facts for issuance of the experience certificate to her by ACBR of DU.
  1. Has been instrumental in sending delayed & distorted replies to the CBI since 01-10-2012 (the date from which he is holding the charge of DOP) in respect of the ongoing through inquiry  against 04 illegal appointed relatives of the senior scientist of DRDO i.e. against SMT. T  Chandrabanu, Swati Sriwastava, Dolly Bansal & SMT. S Geetha.
  2. Has been instrumental in transferring DRDS Cadre Scientists by pick & choose rule without following any uniform policy.
  3. Has harassing the husband-wife scientists by not posting them at a convenient place violating the GOVT. policy.
  4. Has been adopting dilatory tactics to harass the employees of DRDO (who submit genuine grievances on service matters to DRDO HQ to obtain justice through administrative channel) by    unnecessarily seeking opinions of the nodal departments even in the matters where the rule position is expressively clear.
  5. Remains dormant in redressing the genuine grievances & acts super actively to help the dishonest employees & officers of the DRDO which shows his possession of doubtful integrity.
  6. Appointed retired officers of AFHQ Cadre, DRDS Cadre, service officers & DRDS Cadre officers as consultants during his tenure as DOP for the regular jobs for which either replacement have joined in DRDO or for the jobs for which no such appointments is permissible under concerned. He even allowed continuation of the tenure of such illegally appointed consultants.
  7. Has been implementing the special pay to the scientist ‘G’ & counting of the special pay in the fixation of Scientist ‘H’ & tapering of the variable increments of the Scientists by violating  the concerned express rules of DOP&T & ministry of Finance.
  8. Has omitted his duty as DOP with regard to misconducts of Shri A.K. Maini retired Director of LASTEC to save him from vigilance action.
  9. Dr A K Singh deliberately delayed in processing the case of misconduct prima facie against Dr A K Tyagi, Sc ‘G’ so he could get promotion to the post of Sc ‘G’ before issuance of formal charge sheet. He did not propose his suspension of Dr.A K Tyagi even when charges of corruption were forwarded by CVC for investigation to DRDO through CVO, MoD

It is requested that do needful in this with above all reference to save the DRDO.

Regards

Prabhu Dandriyal,
21-Sunderwala, Raipur,Dehradun -248008                                                                                 Phone 0135- 2787750, Mobile- 9411114879,                                                                                 e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com

Breaking News – Ms Swati Srivastava, Scentist, ‘C’ DIPAS terminated at 5:30 Hrs on Friday 10th October

Ex DOP, Dr Arun Kumar’s daughter Ms Sawti Srivastava, Scientist ‘C’ DIPAS was terminated at 5:30 Hrs on Friday 10th October 2014.

She was recruited through RAC without having eligibility for the post of Scientist ‘B’ in 2004. Dr Arun Kumar was than Director, RAC and manipulated all recruitment rules for secure her appointment for the post of Sc ‘B’

like

the subject advertised for recruitment was Biotechnology but her subject was environment science. For interview call the number of candidates against post ratio was changed temporary to accommodate her name

For interview subject expert was called from Delhi University the faculty of Environmental Science for the post of Biotechnology.

Ultimately after long fight since 2009 with gang of corrupt officials finally the day has come – Satya ki jeet hui ( सत्य की जीत हुई )

Congratulations to Dr Neelam Bhalla, Sc ‘F’,DTRL, Sh Prakash Singh, Senior Admin Officer Grade – II, LASTEC, Dr. Rajiv Chauhan, Dr A K Singh, DOP, DRDO, Media persons, CVC, CVO, MOD for their great effort for clean DRDO from Corrupt officials.

First suspension of Dr Arun Kumar, Ex DOP, DRDO Charge Sheet to Dr S M Veerbhadrapa, Dr A K Tyagi, termination of Mrs T Chandrabanu, Madras High Court punished two top DRDO scientists Dr V K Sarswat , Ex DG, DRDO and Sh.G MALAKONDIAH, CC (R&D), HR, DRDO   with simple imprisonment for a period of three weeks and also pay a fine of Rs.2,000/each

Now count down began for removal of Ms S Geetha, Sc, D, DIPAS for submitting fake experience certificate and Ms Dolly Bansal, Sc ‘C’, DIPR recruited without having proper qualification at the time application date. Dr Snehmani, Sc ‘F’, SASE recruited without meeting eligibility criteria, giving fake inputs at the time of selection of scientist ‘C’ and finally Cmdr S K Patel husband of Ms Tessy Thomas (Agni Putri) who got illegal appointment as Sc ‘G’ and subsequently given post of director within three days by superseding 480+ scientist ‘G’, one of the great achievement of Sh Avinash Chander, DG, DRDO.

मोदी जी अब लगता है कि डी आर डी ओ के अच्छे दिन आ गए। जय हो !जय हो !जय हो !

DMSRDE – Second Fact Finding Inquiry Committee 9th & 10th July 2014

It seems DRDO take U –turn in DMSRDE corruption cases. Shri AvinashChander , DGR&D and SA to RM constituted second four members  FFIC under Chairmanship of Dr. D C Pande, Outstanding Scientist, LRDE, Bangalore  and members Shri Haribabu Srivastva, Director, LASTEC, New Delhi, Shri R S Mehta, Joint Director, Dte of Vigilance& Security, DRDO Hqrs, Shri Jagdeep, Scientist ‘F’,Dte of Materials Management DRDO Hqrs  reached at Kanpur on 9th July early morning 5:00 AM at DMSRDE, Guest House, Kanpur by Rewa Express.

In deference to three members first FFIC which was led by Dr. S S Negi, Outstanding Scientist,this second FFIC did not entertained Dr. A K Saxena, Director, DMSRDE, Kanpur. Dr.Saxena  was sent for two days leave and remained in  his government residence just adjacent to Transit Hostel’s DRTC Room where whole FFI was  conducted for two days by FFIC.

The first FFIC Committee did their inquiry under supervision of Dr. A K Saxena in DMSRDE Office in the room just opposite to Dr. Saxena office so that he can monitor activities of first FFIC. Chairman & members of first FFIC tried their best to discourage complainants and in month of March 2014  all scientists were under pressure due to their APAR and coming assessment and not opened or uttered any single word against Dr. A K Saxena in front of   first  FFI Committee. The first FFI Committee overlooked the gravity of complaints to Defence Minister rather they were busy in digging the past history of complainants. They were basically misleded and managed by Dr. A K Saxena.

The letter No DOP/DS/008/M/01 dated 28 May 2014 of DOP Dr. A K Singh prepared on basis of first FFI Committee Report already exposed the nexus between Dr. A K Saxena and first FFI Committee because the without any constitution rights and ignoring the terms and condition of FFI Committee they simply recommended the transfers of both complainants with baseless and illogical reasons. It should be asked to Dr. S  S Negi, Outstanding Scientist that if on allegations of habitual  drinking one senior Scientist  may be transferred then what about the drinkers of whole DRDO right from top at DRDO HQ and bottom at 52 Establishment/Labs of DRDO. Why they have not been transferred even they are heavy habitual drinker. In fact first FFIC was  hijacked by  Dr. A K Saxena.

The two days grilling of involved scientists of DMSRDE by second  FFI Committee members especially by Shri Mehta, Vigilance, DRDO Hqrs shows some hope that the committee will help to Shri Avinash Chander , DGR&D and SA to RM and DRDO Hqrs to take one step forward towards eradicate prevailing corruption in DRDO like Dr A K Tyagi, Sc ‘G’ waiting to face CVC disciplinary proceeding against him as he also involved in corrupt practices in procurement at DIAT, Pune.

Some scientists of DMSRDE given in writing about the facts of these procurements and shows their helplessness.

Second FFI Committee also got advantage that the DRRDS result was declared and scientists who supported Dr. A K Saxena’s corrupt practices under pressure opened up and exposed the modus of oprendi adopted by Dr. A K Saxena.  FFI Committee also got inputs about nexus between M/s Manglam Trades, Kanpur (Mr.Anish Gupta/Mr. Manish Gupta) and Dr. A K Saxena in various procurement cases.

1.       Reactor case is open case that the procurement was done in coalition  with M/s Manglam Trades because all mails are the perfect evidences of corruption and DRDO Hqrs already aware that CBI, Lucknow have already got all evidences and approached MOD. Payment of Reactor case has not been made till so far even after 18 months the Reactor was installed in January 2013 at DMSRDE.

2.       The case of procurement of Laboratory Microprocessor Based Programmable High Temp.Furnace supplied by M/s   Omega Furnace Industries, Bangalore. In this case illegal Second TPC was done for recommending to make payment  to M/s Manglam Traders, Kanpur.( It can happen only in DRDO)

3.       Fume Hood Chamber procurement case is open example of looting in DRDO.

Common man are waiting to see the impact of new Prime Minister Shri Narendra Modi ji’s Government on  DRDO, as Shri Avinash Chander Ji especially mentioned in his address in last JCM that “now new government has come and the accountability is also increased”.

It is coincidence that both FFIC having chairman from Uttarakhand and Uttarakhandies are famous for their honesty and devotion in service. We hope that like Dr. S SNegi, the Chairman of second FFIC Dr. D C Pande will not be hijacked by corrupt nexus of DRDO and he will do justice with DMSRDE people.

Jaihind

 

DRDO RTI Cell Trying to take shelter of High Court Order

DRDO RTI cell doing propaganda that Honorable High Court declared DRDO 100%   exempted  organization from RTI Act-2005 and started giving denial  to each and every RTI request without seeing the merit and facts that the request pertain to corruption. And best part of this now they are stop writing “except information pertaining to the allegations of corruption and human rights violations”

RTI cell including First appellate authority also cited the Delhi High Court Judgment passed in WP © 83/2014 DR. NEELAM BHALLA .. Petitioner Through: Mr. R. Sathish, Advocate. Versus UNION OF INDIA & ORS ..Respondents Through: Mr. Neeraj Chaudhari, Advocate for R-1 and 2.

In this judgment is nothing new every one clearly knows DRDO was an exempted organization under Section 24 of the Right to Information Act, 2005. In other words, the Act would apply to DRDO only to the extent of information pertaining to allegations of corruption and human rights violations.

In DR. NEELAM BHALLA case  DR. NEELAM BHALLA  prayer to honorable court that information supplied by then CPIO, DRDO  Sh Bundella was incorrect and inaccurate and court says

“4. It is a matter of fact that Shri Bundela had provided inaccurate and incorrect information to the appellant but Shri Bundela’s contention that he had transmitted information as received by him from CPIO of RAC cannot be disregarded. It is important to bear in mind that Shri Bundela was not the holder of information. The holder of information was CPIO, RAC. Whatever information was W.P.(C) No. 83/2014 Page 1 of 4 forwarded to Shri Bundela by CPIO, RAC, he transmitted the same to the appellant.

6. Even so, before parting with this matter, I would like to caution Shri Bundela to exercise due diligence in responding to the RTI application in future.”

4. Having heard learned counsel for the petitioner, this Court is of the view that once the CIC has held that DRDO is an exempted organisation under Section 24 of RTI Act and the information sought does not pertain to corruption and/or human rights violation, it was not open to the CIC to carve out any further exemption.

But in whole judgment there is nothing new and not giving extra immunizing to DRDO from RTI act, if there is any extra facilitation in judgment than DRDO should quote specifically that.

  1. DRDO RTI cell also go through the judgment of  CWP No. 12904 of 2009

In the High Court for the States of Punjab and Haryana at Chandigarh

HON’BLE MR. JUSTICE  MEHINDER SINGH SULLAR

under Section 24(4) of the Act which envisaged that nothing contained in this Act shall apply to such intelligence and security organizations A combined reading of these provisions would reveal, only that information is exempted, which is directly effecting and co-related to the “Intelligence” and “Security” of that organization of the State and not otherwise.

The matters pertaining to recruitment/appointments and day to day administrative nature information, where it is also found that DRDO top officials did lot of irregularities. Therefore honorable defence minister approved CBI intervention against 10 top DRDO officials including 2 ex- DRDO chiefs one Dr V K Saraswat and other one Sh M Natrajan  for their ugly acts.

It was establish facts till date all senior officials of DRDO who were fixed by CVC and CVO, MOD were exposed with the help of RTI’s only.

So DRDO officials are afraid of RTI’s if they are honest then why they worries from RTI’s . The Ex CPIO, DRDO Dr A K Tyagi who is facing charge sheet in corruption case was the big manipulator and protector of corrupt officials.

I request to DRDO RTI cell you people are serving to our nation; please not to protect culprit’s corrupt officers, your younger generation will ask you what did you contributed for justice. Now in the age of IT revolution era kid can explore what are the score of my grandpa, because these documents are alive forever.

I want to appeal all information seeker from DRDO please don’t dishearten from these act of these corrupt DRDO officials who are taking false shelter.

Please mail/post/send ordinary dak all your queries to www.corruptionindrdo.com postal address or mail address, we will took the matter up to higher ups. We are also planning to filled a PIL for request supreme court for delist the name of DRDO from Second Schedule of RTI Act 2005. As we collected lot of of informations from all over the country.

regrads
www.corruptionindrdo.com
prabhudoon@gmail.com
21- Sunderwala, Raipur, Dehradun- 248001

DRDO corruption’s Heights that they even not leave the Knowledge Corner (Library)

To                                                                                                    3rd March 2014
Sh A K Antony.
Defence Minster,
Room -104, South Block,
New Delhi – 110011

Subject: DRDO corruption’s Heights that they even not leave the Knowledge Corner (Library)

Honorable Sir,

To enhance the knowledge of DRDO scientists and make them updated, Ministry of Defence provide library grant generously. Apart from this the pay commission has recommended special assistance for the purchasing of books/journals to individuals scientist.

The library budget of DRDO’s laboratory is a lucrative assignment for corrupt scientists. The scientist library in-charge has direct access to head of establishment.

The case of corruption in library procurement was first exposed at DIAT, Pune, where then In-charge Library Dr A K Tyagi, Sc ‘F’ did financial manipulation in Library. CVC has been found prima facie material against Dr A K Tyagi.  And Regular Disciplinary action was recommended on: 9/9/2013. Consequently DRDO Hqrs finally charge sheeted on 8th October 2013. Charge Sheet signed by Honorable Defence Minister, Sh A K Antony.

The case of Dr A K Tyagi, Sc ‘G’ is not an isolated case but DRDO labs in general have misusing the library grants and if serious enquiry is set up every lab will give foul smell.

The recent example of DMSRDE, Kanpur’s library procurement cases revealed the astonishing facts and figures of library procurement. The RTI helped to expose the corrupt practice prevailing in library procurements.

Enclosed case revealed that the DMSRDE officials are not following the DRDO Purchase Manual -2006. Even after cancellation of Supply Orders on 23 August 2012 the invoices dated 02 May 2012 were accepted while Supply Orders were placed on 27 April 2012. Thereby mischievously & fraudulently the supply of books were accepted in back date to get fatty commission from these vendors. This gross violation of rules & blunder took place even after cancellations of Supply Orders establish conspiracy against Government by Mr.  Jitendra Yadav and Dr. A.K. Saxena.

DRDO has become hub of corruption and honorable defence minister is requested to take a strong action to prevent further damage of moral and ethics.

Regards

Prabhu  Dandriyal,
21-Sunderwala, Raipur,
Phone 0135- 2787750, Mobile- 9411114879,
e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com
 
Enclosed : Copy Complaint to CVC dated 3rd March 2014
 
To                                                                                                                                            3rd March 2014The Central Vigilance CommissionerCentral Vigilance CommissionSatarkta Bhawan, A- Block, GPO Complex, INANew Delhi-110023SUBJECT: CORRUPTION IN PROCUREMENT OF SCIENTIFIC & TECHNICAL BOOKS at DMSRDECOMPLAINT AGAINST Mr. JITENDRA YADAV, SCIENTIST ‘E’, Head, Technical Library and Dr. ARVIND KUMAR SAXENA, DIRECTOR, DMSRDE, KANPURSir,

BRIEF FACTS OF THE COMPLAINT

 

  1. Defence Materials & Stores Research & Development Establishment (DMSRDE), Kanpur is an establishment under Defence Research & Development Organisation (DRDO), Min. of Defence, DRDO Bhawan, New Delhi.
  2. Dr. Arvind Kumar Saxena, Director, DMSRDE, Kanpur and Mr. Jitendra Yadav, Scientist ‘E’ are posted in DMSRDE, Kanpur. Dr. Arvind Kumar Saxena is Director, DMSRDE with effect from 01 January 2011.
  3. Complainant is retired Government servant from DRDO. Presently complainant is working as RTI activist and social worker to expose the Corruption in DRDO and other Government departments. Complainant is running a website corruptionindrdo.com for posting information related to Corruption and Financial irregularities in various establishments under DRDO.
  4. Technical Library, DMSRDE is having annual budget of about Rs. 1.50 crore for procurement of Printed Journals (Periodicals S&T – Rs. 1.10 crore), Online Science Direct e-Journals (Rs. 25 Lakh) and S&T Books (Rs. 15 Lakh).
  5. Mr. Jitendra Yadav, Scientist ‘E’ was appointed as Head, Technical Library in DMSRDE Kanpur vide Daily Order-I No. 29/AD dated 19.02.2012.
  6. An application under RTI Act 2005 was filed to Mr. Sarvesh Kumar, Scientist ‘F’, Central Public Information Officer, DMSRDE, Kanpur by complainant on 25th July 2013 regarding “Procurement of Scientific & Technical Books in Technical Library of DMSRDE”. Copy of the RTI dated 25th July 2013 is enclosed as Annexure-1.
  7. CPIO, DMSRDE, Kanpur replied by letter No. DMS/0369/RTI/101/41/Letter_2013 dated 26th August 2013. Copy of CPIO reply dated 26th   August 2013 is enclosed as Annexure-2. CPIO, DMSRDE provided partial information and it was informed by CPIO that fund expenditure in procurements of S&T Books in Technical Library in DMSRDE in respective years was as follows:

libtable1

8.     Complainant was not satisfied with reply of CPIO and First Appeal dated 07 Sep 2013 was filed to First Appellate Authority, DRDO. By Order No. RTI/02/2091/F/2013/0142 dated 14 Oct 2013, First Appellate Authority DRDO ordered CPIO, DMSRDE to provide full information sought in RTI dated 25th July 2013. Copy of First Appellate Authority Order dated 14 Oct 2013 is enclosed as Annexure-3

9.     CPIO, DMSRDE seek additional fee for information vide his letter dated 30 October 2013. Copy of the letter is enclosed as Annexure-4. Vide letter No. DMS/0369/RTI/FAR/2013/0013 dated 14 Nov 2013, CPIO provided information in 60 pages and in covering letter CPIO informed that No supply Order has been placed in FY 2010-2011 and No tender was called during FY 2010-2011 and 2012-2013. Copy of the letter dated 14 Nov 2013 is enclosed as Annexure-5..

1o.   The figures in information provided by CPIO were found self-contradictory and false as evident from summary of the information provided by CPIO.

libtable211.    On perusal of the documents provided by CPIO, following noticeable information has been found. 

           a.     Seven invoices were found for the financial year 2009-2010 with following details: 
libtable3libtable4libtable5libtable6libtable7libtable8

         b.      Supply Orders were issued by Head, Technical Library in FY 2012-13 for Procurement of Scientific & Technical books with following details:

  1. Terms & Conditions of Supply Order as per DRDO Manual is enclosed as Annexure-13.
  2. libtable9libtable10libtable11
  3. c.       Supply Order-1, Supply Order-2, Supply Order-3 and Supply Order-4 dated 27 April 2012 as mentioned in point(b) above were cancelled after 117 days on 23 August 2012 by Mr. Jitendra Yadav, Head Technical Library due to non-supply of books within delivery period of 90 days. It was mentioned in Para (2) of Terms & Conditions of Supply Order “This supply order shall automatically stand cancelled w.e.f. the next day after the date of delivery mentioned in this order”. Therefore supply orders were automatically stand cancelled after 90 days from issue of Supply Order (27 April 2012) i.e. w.e.f.  27 July 2012. Copies of letters No. TL/0510/WBF-2012 dated 23rd August 2012 issued for cancellation of supply orders to four vendors are enclosed as Annexure-24 to Annexure-27.
  4. d.         Twenty two invoices were found for the financial year 2012-2013 with following details:libtable12libtable13libtable14libtable15
  5. e.  Books were supplied against four supply orders that were cancelled on 23 August 2012. The fake invoices were fabricated from back date but actual supplies of books were made after cancellation of supply order. This smack conspiracy, manipulation and tampering of records for Corruption.
  6. 12.      During the FY 2012-2013 the following irregularities, gross violations of rules, loss of public fund and Corruption took place in procurement of Books.
  7. MAJOR FINANCIAL IRREGULARITIES & BLUNDERS IN PROCUREMENT OF BOOKS BY  MR. JITEDNRA YADAV, SCIENTIST ‘E’ & DR. A.K. SAXENA, DIRECTOR

    1)          DRDO Manual of Procedures for Management of Libraries and TIC 1999 as amended and Purchase Management 2006 as amended are being used in DMSRDE, Kanpur for procurement of books & periodicals. Rule 4.2 of Chapter 4 (ACQUISITION) of Manual is applicable for procurement of Books & Monographs. Copy of relevant rules of chapter 4 are enclosed as Annexure-50.

    2)           As per Rule 4.2.2 of this Manual selection of vendors should be made on the basis of their past services provided to the library, distributorship of publishers and infrastructure available with them. In the years 2009-2010, 2010-2011 & 2011-2012 there was almost no supply of books and only three vendors get supply orders in 2009-2010 and supplied books. Also these vendors offered 30% discount on books (Foreign & Indian).

    3)          In the FY 2009-2010 mode of tendering was limited tender of PM 2006 to get better discount and competition to save public money and this results 30% discount on books.

    4)          In FY 2012-2013 violations of rules and procedures of procurement of books were grossly violated to achieve fatty commission that results financial loss to exchequer. Supply Orders were issued to vendors without keeping in view the past services of the vendors. This results cancellation of all supply orders that took place on 27 April 2012. Hence these vendors should be blacklisted for further procurement of books in Library. But even after non-supply and automatic cancellation of supply orders after expiry of delivery period of 90 days, the supply orders were issued to same vendors on 17 August 2012.

    5)          Supply Orders were placed on single tender and 10% discount to pet vendors of Dr. A.K. Saxena, Director and all vendors were from New Delhi only. Adopting the process of single tender with 10% discount without following previously adopted procedure of limited tender where vendors were offering discount of 35% – 40% on purchase of foreign books, resulted huge loss of public money and commission making by Mr. Jitendra Yadav and Dr. A.K. Saxena.

    6)          Even after cancellation of Supply Orders on 23 August 2012 the invoices dated 02 May 2012 were accepted while Supply Orders were placed on 27 April 2012. Thereby mischievously & fraudulently the supply of books were accepted in back date to get fatty commission from these vendors. This gross violation of rules & blunder took place even after cancellations of Supply Orders establish conspiracy against Government by Mr.  Jitendra Yadav and Dr. A.K. Saxena.

    7)          There was no procedure followed for selection of books. In fact there was no requirement of books from Scientists as no demands were made. There was no procurement of books in past two years and only Rs. 94833.00 was expenditure in purchase of books in FY 2009-2010.

    8)          It is crystal clear that Corruption took place in FY 2012-2013 where all of sudden books of Rs. 1467810.00 has been procured while in previous years it was “NIL” or very less Rs. 94833.00 only in 2009-10. Demand of books which was NIL (Zero) in 2010-11 and 2011-12 has increased all of sudden near about to the Rupees 15 Lakh. As compared to purchase of books in FY 2009-10 the hike in 2012-13 is about 15.5 times. This indicates that books were purchased without any need and requirement just to earn fatty commission.

    9)          DRDO is having very old manual issued on 11 January 1999 regarding Management of Library/TIC of DRDO. This manual is called as “DRDO Manual of Procedures for Management of Libraries & Technical Information Centres“. After issuance of Purchase Manual -2006 of DRDO this old Manual became ineffective & obsolete. Most of the DRDO Labs/Estt. are using Purchase Manual for procurement of books, Print Journal and Online E-Journals. DMSRDE is also using PM-2006 from last six years for procurement of books, Print  Journal and Online E-Journals as can be verified from records of Technical Library of DMSRDE, Kanpur. All of sudden making purchase of books on the basis of old manual smacks malafide intentions and leads corruption in purchase of books in FY 2012-2013. In fact in year 2012-2013 provisions of DRDO Manual of Procedures for Management of Libraries & Technical Information Centres has not been fully followed. Purchase procedures of DRDO Manual are for small & urgent procurement not for big procurements in tune of lakh or crores.

    10)      Fatty Commission in Procurement of books in FY 2012-2013: Books of Rs. 1467810.60 were purchased at discount of 10% only while in year 2009-2010 the discount on books was 30%. Even in FY 2011-2012 the offered discount by vendors were 35% and now days vendors are offering 40% discount on foreign books. Therefore books were purchased at very high prices on very low discount of 10% only with gross violation & spirit of Purchase Procedures to get maximum discount in open competition under limited tender to save public money. Therefore Rs. 440343.00 (30% of 1467810.00) had taken as fatty commission by Mr. Jitendra Yadav and Dr. A.K. Saxena, Director, DMSRDE.

    11)      Fraudulent supply of books with fake invoices: In FY 2012-2013 four vendors   submitted invoices dated 02 May 2012 against the supply orders dated 27 April 2012 while these Supply orders were cancelled on 23 August 2012 by Mr. Jitednra Yadav, Scientist ‘E’ , Head, Technical Library. The supply on 02 May 2012 was impossible as it takes at least 5 days to reach speed post from DMSRDE dispatch section to the respective vendor. The details /entries of invoices shows that these invoices were not diarised at Director Office central registry and directly entertained by Head, Technical Library. Besides the verification records like receiving of invoices & books at Technical Library, envelops of invoices, CRV, payments by ACDA & records at Finance Division will disclose the whole conspiracy made in procurement of books in back date even after cancellation of supply orders.

    12)      Splitting of consolidated demand of books in four parts: Dr. Arvind Kumar Saxena split the consolidated demand of books in four parts and misused his official position & powers so that he can get fatty commission from his pet vendors. The books should be procured in one consolidated demands with proper negotiations with vendors to get maximum discount offered in open market. Four supply orders were issued on 27 April 2012 to four vendors that were not made any supply in past four financial years in DMSRDE. This splitting of books demand leads loss to public fund and Corruption of Rs. 440343.00 by Mr. Jitendra Yadav and Dr. A.K. Saxena, Director, DMSRDE. Sprit of Purchase Rules and CVC Guidelines is that “The proposals shall not be split merely to bring them within the delegated powers”.

    CHARGES ON DR. ARVIND KUMAR SAXENA, DIRECTOR, DMSRDE

    1. Misuse of power & position for personal gain
    2. Splitting of demands of books in four parts to get fatty commission
    3. Planned conspiracy to accept supply even after cancellation of Supply Orders

    CHARGES ON MR. JITENDRA, SCIENTIST ‘E’, HEAD, TECHNICAL LIBRARY

    i.            Planned conspiracy for Corruption in procurement of books in FY 2012-2013 to earn fatty commission from vendors by issuing supply orders on only 10% discount

    ii.            Gross violation of rules in selection of vendors, splitting of demands

    iii.            Acceptance of supply even after cancellation of supply orders with tampering of records in back date

    iv.            Misconduct under Rule 3.(1) (iii) of CCS(Conducts) Rules 1964

    Therefore, in light of the above mentioned facts and evidences, I may kindly request  you to issue order for inquiry and disciplinary action against Mr. Jitendra Yadav, Scientist‘E’ and Dr. Arvind Kumar Saxena, Director, DMSRDE by CVO, Ministry of Defence.

    Regards

    Prabhu  Dandriyal,
    21-Sunderwala, Raipur,
    Phone 0135- 2787750, Mobile- 9411114879,
    e-mail id prabhudoon@gmail.com  website www.corruptionindrdo.com
  8.  

 

 

RTI Act -2005 – Effective Tool to Tackle Corruption and Very Potent Weapon against Corruption and Nepotism

The main objectives of the RTI Act are – To promote transparency and accountability in the working of every public authority and

To set up a practical regime for giving citizens access to information that is under the control of public authorities.

RTI Act 2005 was introduced to make the government machinery transparent and enhanced the accountability for good governance.

Right to Information and has been given the status of a fundamental right under Article 19(1) of the Constitution. Article 19 (1) under which every citizen has freedom of speech and expression and have the right to know how the government works, what role does it play, what are its functions and so on.

The Act confers right to the citizens to know as to how the taxpayer’s money is being spent by the Government.

Right to Information Act empowers every citizen to seek any information, take notes, extracts or certified copies of documents or records, and take certified samples of material.

DRDO although governed by Indian constitution and draw salary from central government funds.

But decisions are autonomous without accountability. They all are self style generals, they have own rules and rule implantations in own terms & conditions, but when succumbed to injury look for RM for protection and ask protection in the name of secrecy.

Like when an RTI revealed that induction of Grade Pay – Rs 4800 without approval of finance ministry now question of recovery of Rs 24 Cr is big crisis for DRDO, several court cases are facing by DRDO, almost 665 technical officers are busy to tackle the recovery issue.

DRDO management to hide their irresponsible act, making arrangements for reassessment for these technical officers. Please imagine the money involvement and man hour wastage.

The present Honorable Defence Minister has tried his level best and convinced DRDO officers/ employees to fall in the line and follow the constitutional provisions.

Honorable Defence Minister has take prompt action as per rule:-

  1. Not granted extension to Dr V K Sarswat
  2. Suspended Dr Arun Kumar, DOP two hours before his retirement day.
  3. Charge sheeted to Dr. S M Veerabhadrappa just after retirement.
  4. Node to enquiry for Dr W Selvamurthy, Ex CC R&D, Ph D in Yoga, Ms S Geetha, Ms Swati Srivastva, Mrs T Chandra banu, Scientist ‘F’
  5. Charge Sheeted Dr A K Tyagi, ex CPIO, DRDO Hqr
  6. Protected whistle blower Sh Prakash Singh, Senior Admin Officer-I

These well known decisions are in the right direction and has encourage the common people to identify incompetent, corrupt official , non performers etc of DRDO Labs across the India. So this cancer of corruption, nepotism, casteism can be treated in first stage.

DRDO has made it mockery of RTI Act – 2005. There are several examples in CIC decision; “ The Commission has taken a consistent view that notwithstanding the fact that DRDO is an exempted organization, this exemption applies only in respect of scientific/technical matters and not in respect of establishment matters.”

And best part is this that after CIC stands, DRDO went Honorable High Court for wasting precious poor tax payer’s money. Common man cannot digest who give power to these corrupt officers for saving their own skin they are using public money.

In case of DMSRDE, DRDO Lab Kanpur, some RTI were placed to expose the corrupt practices following in the Lab. As usual practice of RTI cell DRDO all were denied and after thoroughly and specifically made first appeal force to think first appellate authority for provide requested informations.

RTI cell DRDO intends to disclose informations. However, the RTI cell at Lab level put the sundry things under schedule-II exemptions. DRDO has protected its corrupt officials under exemption clause in the name of secrecy.

Please find enclosed copy of FAX addressed to Director, DMSRDE, KANPUR  Letter No RTI/02/2091 /F /2013/0139.0140,0141,0142,0144 dated 27th September 2013 signed by Sh Bishan Singh, Astt. Director, RTI Cell, For First Appellate Authority.

For your ready reference.

 

Regards                                                                                             Date – 14th October 2013

Prabhu Dandriyal
21-Sunderwala, Raipur
Dehradun-248008
E-mail – prabhudoon@gmail.com, website- www.corruptionindrdo.com
 
  1. Enclosed – Photocopy of FAX addressed to Director, DMSRDE, KANPUR  Letter No RTI/02/2091 /F /2013/0139.0140,0141,0142,0144 dated 27th September 2013
 rtidmsrdefaxcopy0001
To                                                                                                                                                  
The Defence Minister                                                                                                        
Room No -104, South Block                                                                                               
New Delhi – 110011

Finally Dr AK Tyagi, CPIO, DRDO Hqrs Charge Sheeted yesterday F/N

Status of Complaint No: 569/11/9 against your one great scientist Dr Anil Kumar Tyagi, Sc ‘G’ CPIO, DRDO Hqrs
Date: 8/10/2013
Sent to CVO for Investigation/Action Taken Report on date : 16/3/2011
CVO Report Received on date: 18/7/2013

Prima facie material has been found against the officials involved. Regular Disciplinary action is recommended on: 9/9/2013

Dr A K Tyagi, CPIO, DRDO Hqrs finally charge sheeted on 8th October 2013 F/N. Charge Sheet signed by Honorable Defence Minister, Sh A K Antony.

On 26th April 2011 I have posted a letter to Defence Minister regarding “DRDO Prefers to Give RTI Cell Responsibilities to Tainted Officers “

DRDO RTI Cell
1. Dr.Arun Kumar, D.O.P. – First Appellate Authority-Vigilance case is pending
2. Dr A.K Tyagi Scientist ‘F’ – CPIO – Case Registered in CVC No.569/11/9
3. Dr Prahlada, CC R&D – Ex F.A.A.- Case is pending with SC/ST commission
4. Sh S Ravi, Scientist ‘G` – Ex CPIO – Case of embezzlement(ITM Mussoorie)

Two were fixed

Dr.Arun Kumar, Ex – D.O.P. Scientist ‘H’, Outstanding Scientist was suspended and Charge sheeted – proceeding initiated
Dr A.K Tyagi , Scientist ‘G’ CPIO, DRDO Hqrs – Charge sheeted –

Next two are under lens of honest employees and both will be fixed

Dr A.K Singh present DOP is supporting Dr A.K Tyagi in all means – it shows his approaches, Dr A.K Singh leave protecting the corrupts and give attentions towards genuine transfer cases of Sh.Sachin, Scientist ‘C’ GTRE and Sh Naval Gupta, Scientist ‘B’ PM-2 Site.

Dr A.K Singh was bothering for image of DRDO but not able to handle Dr CP Ramanarayanan, who was made worst comment in DRDO history.

Some of senior DRDO’s officials are thinking they are GOD and they have power to ruin any one future, now it is not possible because thousands/ lakhs of eyes are watching your every moment.

Wait for GOD’s justice.

[M.O.F. No. F.15(8)-E IV/57, dated 28th March, 1959].
Circumstances under which a Government servant may be placed under suspension –
Cases where continuance in office of the Government servant will prejudice the investigation, trial or any inquiry (e.g. apprehended tampering with witnesses or documents);

Where the continuance in office of the Government servant is likely to seriously subvert discipline in the office in which the public servant is working.
Where allegations have been made against the Government servant and preliminary inquiry has revealed that a prima facie case is made out which would justify his prosecution or is being proceeded against in departmental proceedings, and where the proceedings are likely to end in his conviction and/or dismissal, removal or compulsory retirement from service.
Suspension
(1) The appointing authority or any authority to which it is subordinate or the disciplinary authority or any other authority empowered in that behalf by the President, by general or special order, may place a Government servant under suspension-
(a) where a disciplinary proceeding against him is contemplated or is pending

Open Letter to Sh Avinash Chandra, SA to RM, DG DRDO

Dear

Shri Avinash  Chandra Ji, after you joined as DRDO boss, honest and neutral official expected and hoped for good decision, good administration, good cohesive  environment, hope you will shake DRDO with your full strength  to get rid of incompetent stuff.

But sorry to say you disappointed the honest scientists/ staff/ officials and they are not finding any reason to stay or giving their 100% output to DRDO.

Avinash ji, collect all your good energy and get rid of the nexus of culprits who are controlling SPIC, CCE, Department of Personnel, RTI Cell, RAC, CEPTAM and some Lab heads.

Every DRDO official knows acts and deeds of these corrupt officials but sake of their carrier not coming forward but sending anonymous or fake signed letters ( inputs are correct) to Prime Minister, Defence Minister and other government agencies and of course to you also, I have also received some from various labs. (Sending bunch to Honorable Defence Minister)

The increasing numbers of court cases are also perfect examples of mismanagement in DRDO.

The decision of giving responsibility of administration/material management to scientists is also going to be a big problem in the coming time.

Perfect administration and perfect procurement is not cup of scientists. They are not able to match with laid down rules of government of India. Day by day increasing number of anomalies / audit objections in recruitments / procurement are going to be a big issues.

Dr. P S Goel’s DO letter implementing of interaction for promotion from  Sc ‘ F’ to Sc ‘G’   without approval from cabinet is a clear cut  case of violation of Article 309 and the repercussion now started in shape of court cases which was hampering the progress of DRDO and created demotivation among senior scientists

Same in RAC/ CEPTAM encouraging recruitment of incompetent / fake degree / diploma appointment of such candidates who are not eligible as per SRO/ appointment on the basis of nepotism/ in this respect you only see the RTI’s on these issues, you will find clear picture of the future of DRDO.

You are under the impression that corrupt CPIO, Dr A K Tyagi is protecting DRDO. It is not true, instead of exposing the corrupt practices, he is trying to bury the information and very soon these corrupt practices will sink the DRDO ship. As you aware CVC already issued advice to CVO, MoD against the Dr A K Tyagi for “Regular Disciplinary action is recommended on: 9/9/2013“and you are not taking any action to remove him for the post of CPIO, DRDO. What does it mean, it means still you are in grip of corrupt officials. A honest advice is first change your staff officer and old staff of Dr Sarswat’s time, than only you will be find some change in DRDO’s scenario.

Avinash ji, we all very well know that you are washing dirty linen of Dr V K Sarswat’s several misdeed which are the outcome of mismanagement of Dr Sarswat, because he was only on? Government agencies very well know about that, and why he was not able to get extension,    Ms R. AMRUTHA VANI, SC ‘F’’s  (‘Below the Bench Mark’) case, Dr Neelam Bhalla’s, Sc ‘F’ (Workplace Humiliation, Harassment, Gender discrimination & Victimisation)  case etc. but problem is that you are dealing all issues with same set of officials ( Dr Sarswat’s  & Dr. W Selvamurthy’s gang) who created and responsible for these kinds of hurdles in DRDO for their own wasted interest.

CEPTAM Director enjoys all type of corrupt practices like he is engaging his wife and relatives in different recruitments boards as experts. Recent CEPTAM recruitment process he introduced mandatory SMS registration (cost Rs 3 to each applicant) for his personal benefit (he worked this out this without proper procedure) and due to this almost thousands of aspirant were not able to get their admit cards. In this process lot of SC/ST candidates also suffered, you can check with records, where Government of India facilitates to SC/ST candidates in recruitments without any fee. Almost 5 lakhs candidates applied nearly one lakh rejected and thousands of candidate could not appear due remote centre problem, candidates were not given asked choice centers, they received admit cards with centers like Goa, Mizoram, Chennai, Patna.

Regards

Date 26th September 2013

Prabhu Dandriyal
21-Sunderwala, Raipur
Dehradun-248008
E-mail – prabhudoon@gmail.com, website- www.corruptionindrdo.com

Please go through the following letters which are self explanatory of your labs environment and administrative ability of your scientist.

Example Responsibility of Administration to Scientist – DMSRDE ION Dated 31st December 2012 a true example of DRDO helpless position – a perfect documentary evidence of how incompetency promoting in DRDO.

DMSRDE ION Dated 31st December 2012
DMSRDE – ION Dated 31st December 2012

dmsrde meeting1

dmsrde meeting2dmsrde meeting3

CEPTAM Recruitment Case – Few examples

  1.  Sh. Kamdev , SC candidate – Admit card not received  reason –  SMS registration
  2.  Sh. Kunal – Admit card received after one day   – 5 times he registered by SMS – Delhi local but centre was Ajmer
  3. Sh Satvir – Applied for post of welder and asked for local nearby centre Delhi but he was given centre Chennai
  4. Mohd Shahbaz – No Admit card received/ SMS registered/ application not found
  5. Sh Saroj Kumar- applied for 0217 Diesel Mech local Harsh Vihar, Delhi based   admit card received with Centre in Patna
  6. Sh Sandeep – applied for Fireman not received admit card – reason not known
  7. Ms Kavita – resident of Delhi, Admit card received given exam in Kanpur centre spend Rs 4000 will Director CEPTAM reimburse  or only busy minting money for himself and his relatives.

Hundreds of candidates wasted their days in front of CEPTAM reception but could not able get their admit cards.

Long list will be continue 

Fooling the RTI applicant by DRDO with help of DoPT

To                                                                                                                 2nd August 2013
Shri R K GIRDHAR
Under Secretary 
RTI Section, Room No 215 A /II                                                                                                                                                   North Block, New Delhi

Subject: Fooling the RTI applicant by DRDO with help of DoPT

Sir,

  1. I have send a RTI request CPIO,Under Secretary (Estt.A-IV) R.No.202, North Block, D/o.Personnel & Training, North Block, New Delhi on 23rd July 2013. (Copy enclosed for your ready reference.)
  2. I have received a letter from Sh B Bandyopadhyay, Under Secretary, & CPIO, vide letter No 28034/265/2013-Estt.(A) dated 29th July 2013 stated that my application forwarded to CPIO,DRDO Hqrs for providing information directly to me. Copy enclosed)
  3. Subsequently vide letter no RTI/01/2091/P/2013/0210 DRDO Hqrs CPIO, Dr.A.K.Tyagi, Sc’F’   refused to disclose this information u/s 24 (1) of the RTI Act.

In view of above I would like to inform you some facts for your kind perusal.

  1. In 11th July 2011 I had requested similar RTI request to DoPT and received proper information from Sh Mohd. Moniruazzaman, CPIO vide letter F.No 29/41/2011/EO(SM-II) date 2nd August 2011. ( Copy enclosed)
  2. The DRDO Hqrs CPIO, Dr.A.K.Tyagi, Sc’F’ is facing CVC probe vide CVC No.569/11/9. Dr.A.K.Tyagi, Sc’F’ major concern to protect corrupt officials by not providing information to RTI applicants who want expose DRDO officials  corrupt practices in procurement/ recruitments/ promotions / extensions etc.                         The current status of Dr.A.K.Tyagi, Sc’F’ case is the case file No 203/D/(Vig.II)/2011 was referred to CVC on 17th July 2013 from CVO, Ministry of Defence for further action.
  3. In my RTI request is directly related to corruption in Sh R C Agarwal’s extension case, the guidelines FR 56 d was not followed properly.   Sh R C Agarwal have no international or national reputation credits, his second extension backed by DRDO for Software Defined Radio Project (100 Cores),  without any output PDC Date 27th July 2013, there is no further extension received by DEAL, DRDO till date. As per sources 18 members team of Project Management Review Committee found that project is not feasibly fit for further extension on 14th August 2013 but the DRDO will manage to get extension for another 12 months for wasting rest Rs 40 corers precious poor tax payers’ money.

It is requested to do needful action to replace Dr A K Tyagi from the duty of CPIO as he is facing CVC inquiry against him.

It is requested to kindly directed Sh B Bandyopadhyay, Under Secretary, & CPIO to provide the requested information as earlier followed by DoPT.

Regards,

Prabhu Dayal Dandriyal
21-Sunderwala, Raipur, Dehradun-248008
Phone – 2787750, Mobile- 9411114879,
e-mail id prabhudoon@gmail.com , www.corruptionindrdo.com

Enclosed

  1. Copy of RTI request sent to CPIO,Under Secretary (Estt.A-IV) R.No.202, North Block, D/o.Personnel & Training, North Block, New Delhi on 23rd July 2013.
  2. Copy of letter of Sh B Banddyopadhyay, Under Secretary, & CPIO, vide letter No 28034/265/2013-Estt.(A) dated 29th July 2013.
  3. Copy of denial letter no RTI/01/2091/P/2013/0210 dated 16th August 2013 from  DRDO Hqrs CPIO, Dr.A.K.Tyagi, Sc’F’
  4. Copy of   Sh Mohd. Moniruazzaman, CPIO vide letter F.No 29/41/2011/EO(SM-II) date 2nd August 2011

Copy to

  1. Prime Minister of India, PMO, South Block, New Delhi
  2.  Defence Minister of India, Room No 104, South Block, New Delhi.
  3. Dr. Syamal Kumar Sarkar, Secretary, MOP, Room No-112, North Block, New Delhi